Submits Addl Response to IE Bulletin 80-16 Re Potential Misapplication of Rosemount Transmitters.Ge Currently Issuing Field Disposition Instructions for 1150 Rosemount Insp.Insp Results to Determine Corrective Action
ML20003D373
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/05/1981
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-16, NUDOCS 8103270015
Download: ML20003D373 (3)


Text

s PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHI A. PA.19101

'2isi e4i.4 so2 MAR 0 51981 m,~ s u m,.

WICE PRESIDENT Ensemaa mens enn mass ancee P

M 8

f/

B 4

I 0.? g IO8/ 4j Mr. Boyce H. Grier, Director Region 1 United States Nuclear Regulatory Commission 631 Park Avenue N

King of Prussia, PA 19406

)

h

$t~--

S'JBJECT: NRC Region 1 Letter Dated June 27, RE:

IE Bulletin No. 80-16 " Potential Misapplication of Rosemount, Inc. Models 1151 and 1152 Pressure Transmitters with Either "A" or "D" Output Codes" Limerick Generating Station Units 1 and 2 Docket Nos. 50-352 and 50-353

REFERENCES:

(1)

J. S. Kemper Letter of 10/1/80 to B. H. Grier (2)

J. S. Kemper Letter of 9/10/80 to B. H. Grier l

(3)

J. S. Kemper Letter of 8/25/80 to B. H. Grier

(

(4)

J. S. Kemper Letter of 1/30/81 to B. H. Grier l

l l'ILE : GOV'T l-1 (IE Bulletin 80-16) l

Dear Mr. Grier:

The reference (4) letter advises we will complete our response to the subject bulletin as soon as the information is available from General Electric Company, our supplier for the Nuclear Steam Supply System.

We have been advised by General Electric that Field Disposition Instructions (FDI's) are currently being issued to their site personnel to inspect 1151 Rosemount Transmitters for cards with either "A" or "D" output codes. The results of this inspection will be reviewed and corrective measures taken to obtain replacement cards from Rosemount for delivery to the site. Thi:, work, including installation of replacement cards where necessary, will be complete by September 30, 1982.

A copy of the General Electric letter of 1/28/81 from H. G. DeVoss to R. A. Mulford, Project Manager is attached.

Conclusion of this action will be tracked by the follow-up system for IE Bulletins, IE Circulars and Notices maintained in the office of the Project ibnager.

8103270 0@

_m

_.__.m

~,

i 2-Mr. Boyce H. Grier This disposition concludes our response to the subject bulletin.

Sincerely, S-a Attachment Copy to:

U. S. Regulatory Coraission Office of Inspections and Enforcement Division of Reactor Construction Inspection Washington, D. C.

20555 J. P. Darr, NRC Resident Inspector T

+

4 s

T g

9 y

v r---

G E N E R Al. h E LE CTRIC NUCLEAR POWER SYSTEMS DIVISIO N GENERAL ELECTRIC COMPANY.175 CURTNER AVE SAN JOSE. CALIFCRNIA 95125 MC391,(408)925-5159

,1 Le FEB g+

January 28, 1981 gg PE-2453 l

l Mr. R. A. Mulford Project Manager

~

LGS Units 1&2 2301 Market Street Philadelphia Electric Co.

Philadelphia, PA 19101

Dear Dick:

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 & 2 IE BULLETIN 80-16. ROSDiONT TRANSMITTERS This is to advise you that FDIs are being issued to direct the Limerick site to inspect 1151 Rosemont Transmitters serving approximately 25 different functions on each ynit to determine which printed circuit card is installed.

Upon completion of this inspection and review of the results, any necessary replacement cards will be obtained from Rosemont and delivered to the site.

We expect this effort to be complete by September 30, 1982 on Unit 1 and December 31, 1982 on Unit 2.

This schedule will allow a minimum of three months for the site to exchange the cards before startup of pre-ops.

Very trul yours,l

\\

/

6 H. G. DeVosq Project Man'dger Limerick Generating Station l