ML20003D095

From kanterella
Jump to navigation Jump to search
Forwards Revised Plant Security Personnel Training & Qualification Plan.Plan Withheld (Ref 10CFR2.790).Affidavit for Withholding Encl
ML20003D095
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/16/1981
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8103190168
Download: ML20003D095 (3)


Text

...

PHILADELPHIA ELECTRIC COMPANY 2301 M A R K ET STR E ET P.O. BOX 8699 1881 -1961 PHILADELPHI A. PA.10' 11 EDWAJtD G. SAVER JR-1215)8414000

./

Ino og ALcounsta

'i !$

[

EUGENE J. SR ACLEY g-AssoCI ATE othraak CownsEL y

q7 pj

$"$w'A w$ Ewe

'}d

% 10 I93I" h March 16, 1981 M[ AMER C RNELL sistAe.T og mal CoVhsEL EDW ARD J. CULLEN. JR.

p JDHN F. KENN EDY. JR.

4/

!/

Assastaart counsel p

s Mr. Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licent.ing United States Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Peach Bottom Atomic Power Station Units 2 and 3 Docket Nos. 50-277 and 50-278

Dear 1'r. Reid:

Enclosed are five copies of the revised Plant Security Personnel Training and Qualification Plan for Peach Bottom Atomic Power Station Units 2 and 3.

The Plan has been revised in response to the coments contained in the enclosure to your letter dated January 27, 1981.

In accordance with Section 2.790(d) of the Co=ission's Regulations, it is hereby requested that the enclosed Plant Security Personnel Training and Qualification Plan be withheld

.from public disclosure on the grounds that it contains the details of the physical security plans of a licensed facility.

An affidavit in support of this request is attached hereto.

Very truly yours, D O/

jF

^

Euge J.

a EJB:ck Enclosure 8108190 W8 F

s.

COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF PHILADELPHIA S. L. Daltroff, being first duly sworn, deposes and states as follows:

1.

He is Vice President of Philadelphia Electric Company (hereinafter referred to as the " Company"); he is authorized to execute this Affidavit on behalf of the Company; and he has read the revised Plant Security Personnel Training and Qualification Plan for Peach Bottom Atomic Power Station dated ~ March, 1981 (hereinafter referred to as "the Plan"), and knows.the contents thereof.

2.

The Plan which is sought to be withheld from public disclosure contains details of the physical security plan for Peach Bottom Atomic Power Station.

3.

To the best of his knowledge, information and belief, the information set forth in the Plan has been treated as - confidential and' proprietary information and has been with-l l

held from public. disclosure by the Company in accordance with i

the Company's practice of treating all information dealing with l

the details of, security _' plans and procedures as confidential l

and proprietary information.

I

~

4.

The Plan should be considered by the Nuclear Regulatory Commission as confidential and proprietary infor-mation and be withheld from public disclosure on the grounds that it contains detsils of the physical security plans and procedures of a licensed facility, such disclosure is not

- required in the public interest, and such disclosure would adversely affect the interest of Philadelphia Electric Company.

/

WbwW ~

X

/

/

"i

//

Subscribed and sworn to N

before me this b' day of March, 1981.

Notary Pt b E ZABETH H. 80 Public Phila., Phita. Co.-

a My Commission Expires Jan. 3(L 198 ---

i l

t 2-l n

e an e

e-r r'--

e-