ML20003C821

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1981
ML20003C821
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20003C819 List:
References
NUDOCS 8103180507
Download: ML20003C821 (4)


Text

{{#Wiki_filter:. o. O JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPEPATIONS FEBRUARY, 1981 In February 1981, the unit remained shutdown for Cycle II-III refueling. The following safety-related maintenance was performed in February: 1. Performed miscellaneous maintenance on Diesel Generators. 2. Continued implementation of main control board modifications recommended as a result of human factors evaluation. 3. Continued implementation of various NUREG-0578 and NUREG-0737 requirements. 4. Continued implementaion of various Farley Fire Protection Program Re-evaluation requirements. 5. Replaced all cells in Train A and B Service Water battery banks. 6. Rebuilt River Water pumps No. 4 and 5. 7. Continued implementation of design changes associated with NRC IE Bulletin 80-11 and NRC IE Bulletin 79-14. 8,1 o s 1 8 0 507

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 3/1/81 C051PLETED BY W.G. Hairston,III TELEPHONE (00 Roo-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farlev - Unit 1 Notes 1) Cumulative' data

2. Reporting Period:

February, 1981 since 12/1/77, date of

3. Licensed Thermal Power (MWt):

2652 co::nercial operation.

4. Nameplate Rating (Gross MWe):

860 829

5. Design Electncal Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Throulb 7) Since Last Report, Give Reasons:'

N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr.-to-D::te Cumularise I1. Hours in Reporting Period 672 1416 28,464 l

12. Number Of Hours Reactor Was Critical 0

-0 17,182.3 l

13. Reactor Reserve Shutdown Hours 0

0 2,446.8 l

14. Hours Generator On-Line 0

0 16,703.4 l

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

41,989.891.8

17. Gross Electrical Energy Generated (MWH) 0 0

13,419,408 ~

18. Net Electrical Energy Generated (MW3)

-4066 -8104 12,599,646

19. Unit Service Factor 00.0 00.0 58.7
20. Unit Availability Factor 00.0 00.0 58.7

-00.7 -00.7 55.1

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)~

-00.7 -00.7 53.4

23. Unit Forced Outage Rate -

00.0 00.0 06.9

24. Shutdowr.s Scheduled Over Next 6 Months (Type. Date. and. Duration of Each):

N/A l l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Ffarch, 1981

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achi.,ed INITIAL CRITICALITY 8/6/77 8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 l (4/77)

=_ ~ - .- m w .m............. m, m ,a-1 s' 50-348 m," DOCXIT NO. .MT I DATE 3/1/81 W.C. Hairston, III COMPLETED BY I TELEPHONE (205)899-5156 = gogpg February, 1981 4 DAY AYERAGE DAILY POWER LEVEL

  • DAY AYERAGE DAIL POWER LEVEL

. (HWe Net) (gwg g) 0 t. 37 0-2 n jg o 3 0-g, o 0 0 4 g 0 o 3 21 I 0-0 . 22 ,y o i-7 0 0 -{ ' 3 I-3 0 9 y 0-I ~ l, 10 0 26 0 I 1 0 0 .2-- l-11 27 12 0 .3 o-i' 0 . t. j u y 0 30 ~ 34 0 ,e 15

3t 0

16 .- -- - - g-l ' ~ ~ INSTRtJCTIONS ~ On this format. list the avc sge daily unit power levet in MWe Net for c:ch d:y in the reporting month. Compute to l the neare:: whole mepwatt. l y _ e e .8* e l g x. wn t f r r er s. --c m-y ,u,r ,,,g m,,,

-* D ' R, 50-348 UNITSituTHOWNS AND POWER REDUCTIONS . DOCKET NO. UNIT NAME J.M. Farley - Unit 1 DATE 3/1/81 COMPLETEI) by W.G. Ilairston. III REPORT MONTli February, 1981 TELEPilONE _(205)899-5156 1 e. .! E 3 Licensee E* 'q. Cause & Curseclive No. Ibse gg g }Y g ex: Event g,? Q Action to o5 su: gsg lleport # to O g Prevent, (tecurrence d 001 810201 S 6i2 C 1 N/A RC ZZZZZZ Unit Outage Continued from 1/31/81 for refueling. ( 4 1 2 3 4 F: Forced l{cason: Method: Exhible G. Inst uctions S: Stheduled A-Equipment Failure (Explain) l-Manual foi Prepasation of Data ll Maintenance of Test 2-Manual Scram. Entry Slicens for I.icensee C Itefueling 3-Automatic Scram. Evens Itepois (i.ER) File INUltEG-e D.Itegulasury Hestriction 4-Other (lixplain) 0161) li-Operator Training & IJcense fixamination F Administrative 5 G Opesational I!:ror (lixplain) IIxhihin 1 - Same Somee i 19/77) Il Othes (lixpl. sin) i .}}