ML20003C560

From kanterella
Jump to navigation Jump to search
Provides Info Re Proposed Support Mods to One Primary Containment Atmospheric Control Line on Each Unit in Area of Isolation Valves.Design & Installation Will Be Completed by 810311
ML20003C560
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/11/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-14, NUDOCS 8103060452
Download: ML20003C560 (2)


Text

-

fg, 7 3 "+

b PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)841-4000 February 11, 1981 Docket Nos. 50-277 50-278 u) g S

y N

Mr. Boyce II. Grier, Director

., g FE825199;,, ;

Office of Inspection & Enforcement Region I J &&memen,**

a===.

O U.S.

Nuclear Regulatory Commission hp /

631 Park Avenue 1'

King of P russia, PA 19406

Dear Mr. Grier:

This letter is to provide you with information concerning proposed support modifications to one primary containment atmospheric control line on each Peash Bottom unit in the are of the isolation valves.

A review of the seismic qualifications of the primary containment purge and vent valves at PBAPS Units 2 and 3 conducted by our architect-engineer identified several deficiencies as described in LER 2-81-13/IP, dated February 4, 1981.

As a result of the analytical engineering e va lu a t i on s being performed during this review, it was determined that the piping in the area of two pairs of isolation valves (Ao 2506 & A0 2507 on Unit 2 and AO 3506 & A0 3507 on Unit 3) does not meet the specific FEAR stress criteria for the design basis earthquake (DBE).

However, this piping is considered operable because the l

expected stress for a DBE is less than the actual yield stress l

for the material based on certified caterial test reports.

The expected DBE stre2s based on analysis of the piping is 41,642 psi c mpared with the actual yield st.ess of the material which is 43,600 no..

810 3 0 6 0 t' 12_

4 E

^

J

Mr. Boyce H. Grier Page 2 It is anticipated that the design and installation of the necessary modifications on both units will be completed by March 11, 1981.

i If you have any questions or require additional information, do not hesitate to contact me.

Very truly yours,

^

hf h MTC i

M.

J.

Cooney Superintendent Generation Division / Nuclear cc: United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 20555 l