UNITED STATES E

j NUCLEAR REGULATORY COMMISSION a

wasamoron, o. c. aones

's.,..../

MN 2 8 1981 Docket Nos.: 50-458/459 MEMORAN0tI4 FOR:

Frank J. Mira;ita Acting Chief. Licensing Branch #3, DL FROM:

Darl Hood, Project Manager, Licensing Branch #3, DL

SUBJECT:

NOTICE OF CASELOAD FORECAST PANEL VISIT TO RIVER BEND STATION, UNITS 1 & 2 DATE & TIME:

8:30 a.m.

March 3-5, 1981 LOCATION:

Site, Feliciana Parish, Louisiana PURPOSE:

TO REVIEW CONSTRUCTION PROGRESS AND COMPLETION ESTIMATES FOR RIVER BEND PARTICIPANTS:

NRC Gulf States Utilities W. Lovelace J. Booker, et.al.

W. Beacn Stone and liebster B. Shultz, et.al.

h%

ll,5-Dar~ Hood, Project Manager Licensing Branch #3 Division of Licensing

Enclosure:

Agenda cc: See next page 1/ Meetings between NRC technical staff and applicants for licenses are open for interested members of the public to attend or observers pursuant to "open meeting and statement of NRC Staff Policy",

43FR28058, 6/28/78. Advanced notice for such attendance is requested.

Permission to enter construction site must be obtained in advance from the Utfifty.

f l 0 L2 ~7 6 Y b

Dr. E. Linn Draper, Jr.

Vice President - Technology Gulf States Utilities Company P. O. Box 2951 Beaumont Texas 77704 Troy B. Conner, 'Jr., Esq.

cc:

Conner, Moore & Corber 1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 Mr. J. E. Booker, Safety & Licensing Gulf States Utilities Company P. O. Box 2951 Beaumont, Texas 77704 Stanley Plettman, Esq.

Orgain, Bell & Tucker Beaumont Savings Building Beaumont, Texas 77701 Karin P. Sheldon, Esq.

Sheldon, Harmon & Weiss 1725 I Street, N. W.

Washington, D. C.

20006 William J. Guste, Jr., Esq.

Attorney General State of Louisiana P. O. Box 44005 State Capitol Baton Rouge, Louisiana 70804 Richard M. Troy, Jr., Esq.

l Assistant Attorney General in Charge State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana 70112 i

1

~

i

ENCLOSURE CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA March 3, 1981 I.

River Bend 1 and Needed Common Facilities 1.

Overview of project construction schedule including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current projected fuel load date.

2.

Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.

3.

Detailed review and current status of procurement activities including valves, pipe, instruments, cable, major components, etc.

4.

Actual and proposed craft work force (by major craft), craft availa-bility, productivity, potential labor negotiations and problems.

5.

Detailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, rework, procurement, fabrication, delivery and installation.

6.

Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities with negative float, and provisions for contingencies. The estimated project percent complete as of January 31, 1981.

7.

Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quanti-ties scheduled to date, current percent complete for each, actual versus forecast installation rates, and basis for figures.

(a) Concrete (CY)

(b) Process Pipe (LF)

- Large Bore Pipe (21/2" and larcer)

. Small Bare Pipe (2" and smaller)

(c) Yard Pipe (LF)

(d) Large Bore Pipe Hangers, Restraints, Snubbers (ea)

(e) Small Bore Pipe Hangers, Restraints.(ea)

(f) Cable Tray (LF)

(9) Total Conduit (LF)

(h) Total Exposed Metal Conduit (LF)

(i) Cable (LF)

Power Control Security Instrumentation Plant Lighting (j) Terminations (ea)

Power Control Security

- Instrumentation Plant Lighting (k) Electrical Circuits (ea)

Power Control

- Security (1) Instrumentation (ea) 8.

Detailed review and curre acceptance test procedure,n.t.ntatus of preparation of preop and s, integration of preep and acceptance test activities with construction schedule, system turnover schedule, preop and acceptance tests schedule, current and pro-posed preop and acceptance tests program manpower.

(a) Total number of procedures required for fuel load.

(b) Number of draft procedures not started.

(c) Number of draft procedures being written.

(d) Number of procedures approved.

(e) Number of procedures in review.

(f)

Total number of preop and acceptance tests required for fuel load.

(g) Number of preop and acceptance tests completed.

(h) Number of preop and acceptance tests currently in-progress.

(i) Number of systems turned over to start-up.

. 9.

Detailed discussion of potential schedular influence due to changes attributed to NUREG-0737 and other recent licensing requi rements.

10. Discussion of schedular impact, if any, regarding potential defi-ciencies reported in accordance with 10 CFR 50.55(e).
11. Applicant comments on financial commitments to complete facility.
12. Overview of current construction management organization and activities.
13. Status of Hydrodynamic Loads Analyses and Design.

II. Status of Applicants' Decision for River Bend Unit 2 March 4, 1981 1.

Additional questions, clarifications and discussions regarding discussion of February 10, 1981.

2.

Applicants presentation of plant layout and status preparatory to site tour.

3.

Site tour and observation of construction activities.

4.

(0ptional - time permitting) Tour of transmission corridor through Port Hutson Battlefield.

March 5, 1981 1.

Staff Summary of Conclusions and Findings

MEET!f;G 110flCE DISTPIBUTIDN f4RC PDR

5. Hanauer

' \\ h '* ",

Docket File J. Stolz

&\\

Local PDR P. Collins F

( F

.I, T U

h

\\

NLL fIU %

TIC D. Vassallo tlSIC D. Ziemann RB 0 5 581

7 ;

0 p.

Branch File E. Hughes 4 Uda=J'f%^"C" yj H. Denton F. Schroeder E. Case K. Kniel Q

A 0 D. Eisenhut D. Skovholt

'\\

R. Purple G. Knighton

/*

T. Novak M. Ernst

~

S. Varga R. Baer T. Ippi,lito E. Adensant R. A. Clark A. Thadani R. Reid ACRS(16)

R. Tedesco Attorney, OELD B. Youngblood 0!E (3)

A. Schwencer OSD (7)

F. Miraglia Project flanager ___D. Hood J. R. Miller Licensing Assistant J. Lee G. Lainas Receptionis t

- D. Crutchfield TERA W. Russell J. LeDoux, I&E J. Olshinki V. Moore R. Vollmer I&E Headquarters R. Bosnak I&E Region I F. Schauer I&E Region 11 R. E. Jackson I&E Region Ill G. Lear I&E Region IV V. Noonan I&E Region V S. Pawlicki.

T. Murley

-V. Benaraya NRC

Participants:

2. ~ Rosz toczy W. Lovelace W. Haass W. Beach D. Muller R. Ballard W. Regan

-J. D. Saltzman D. Ross.

P. Check R. Satterfield

0. Parr bcc: Applicant & Service List F. Rosa W. Butler _

W. Kreger R.' W. Houston T. 11urphy W.. Gannill -

L. Rubenstein-T. Speis W. Johnston B. Grinus

.. II. Cnllins-F. Pagano S. IL :cos J. Kramer TOW ^n