ML20003C088

From kanterella
Jump to navigation Jump to search
Forwards LER 81-005/03L-0
Date released: 01/17/2020 Download: ML20003C088


LER 81-005/03L-0:on 810120,discovered That Continuous Air Sample Was Not Being Drawn at River Station Per Tech Spec 3.9.1.Caused by Pump Failure Due to Seized Bearing.New Pump Installed.Pump Evaluation Program Established
ML20003C090
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/20/1981
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20003C090 (1)
Forwards LER 81-005/03L-0
ML20003C087
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/20/1981
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20003C087 (1)