Interim Deficiency Rept Re Cable Terminations in Square D 480-volt Motor Control Ctrs.Caused by Manufacturer Defects & Lack of Adequate Qc.Deficient Terminations Replaced.Final Rept to Be Submitted by 810331
ML20003B881
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/30/1980
From: Novarro J
LONG ISLAND LIGHTING CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003B877 List:
References
10CFR-050.55E, 10CFR-50.55E, SNRC-524, NUDOCS 8102260046
Download: ML20003B881 (2)


Text

.

f LONG ISLAND LIGHTING COM PANY m SHOREHAM NUCLEAR POWER STATION p.O. sox 618. NORTH COUNTRY ROAD

  • WAOlNG RIVER N.Y.11792 SNRC-524 December 30, 1980 Mr. Boyce H. Grier Office of Inspection and Enforcement, Region 1 U.S. Nuclear Regulatory Commission 631 Park Ave King of Prussia, Pa 19406 LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION - UNIT 1 DOCKET NO. 50-322

Dear Mr. Grier:

l l On December 4, 1980, in accordance with 10CFR50.55 (e), we l reported verbally to Region 1 a deficiency with cable terminations in Square D supplied 480VMotor Control Centers. This letter

. serves as our 30 day written report of this deficiency.

DESCRIPTION OF DEFICIENCY The deficiencies were discovered when construction electricians were terminating field cables in Motor Control Centers (MCC).

Further investigations were performed to determine if the deficient terminations were isolated to just one MCC or were present in many of our safety and non-safety related MCCs. A partial survey of MCCs indicated that the problems appeared to be fairly widespread.

The problems found appear to be caused by a lack of adequate quality control in the method in which cable terminations were made in both safety and non-safety related MCCs. Termination lugs on vendor wiring have been found insufficiently crimped such that conductors can fall out of or easily be pulled out of their lugs. Other cases have been found where terminal block screws and screws on devices have not been tightened to secure the termination lugs in place. In addition to these violations, others have been found where terminatinglugg 81022600 @

~~ . -

. _- - _ .. -.- - _ = _ . .

Mr. Boyce H. Grier December 30, 1980 Page two have been bent further than permitted by the lug manufacturer and where the conductor has not been properly inserted into the lug before crimping. These defic 2incies can cause intermittent or broken electrical circuits whion might cause safety related equipment to fail to operate when required.

CORRECTIVE ACTION Square D engineering and quality assurance have been appraised of this problem and a Square D quality assurance representative has visited the site to inspect samples of the deficient termin-ations.

Field electricians have removed and replaced deficient terminations in several of the MCCs that have been inspected. We are presently awaiting a response from Square D as to the results of their on site inspection before a full plan of corrective action is under-taken.

Since fina1' corrective actions have not been developed at this l

time, a supplemental report will be submitted in 90 days. Final l Corrective Action, Corrective Action to Prevent Recurrence and Date l of Full Compliance will be provided at that time.

Very truly yours, l

r q L' g*h 7, P. hdovMtRO -

- / -

J. P. Novarro Project Manager .

Shoreham Nuclear Power Station TJS:mc cc: Mr. Victor Stello, Director '

NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 20555 Mr. J. Higgins Site NRC Trailer