Interim Deficiency Rept,Originally Reported in 810120 Telcon to Gr Taylor,Re Compressive Strength of Pipe Support Baseplate Grouting Matl at Elevated Temps.Investigation Completed & Deficiency Determined Not Reportable
ML20003B702
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/18/1981
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3279, NUDOCS 8102250257
Download: ML20003B702 (1)


Text

r $ uiTEXAS UTILITIES GENERATING COMPANT g- u, tj 200 nave wwra.nes.rexas vano i E

n. . our

'i'JtL'.'.,0." "".?.'* ;

.. d[=

=

February 18, 1981 TXX-3279

[3 '

Et Mr. II. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspectilin' & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446- ,

COMANCHE PEAK STEAM ELECTRIC STATION PIPE SUPPORT BASEPLATE GROUTING MATERIAL FILE NO. 10110

Dear Mr. Seidle:

On January 20, 1981 we verbally informed your Mr. R. G. Taylor of a deficiency regarding the compressive strength of pipe support baseplate b grouting material when subjected to elevated temperatures.

We have completed our investigation and have concluded that che matter is not reportable under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site. I Very truly yours,

(

R. J. Gary RJG:dk cc: NRC Region IV.- (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Comission Washington, D. C. 20555