ML20003B505

From kanterella
Jump to navigation Jump to search
Forwards Feb 1981 Update of Cases Pending Before Aslbs, Aslabs or Commission
ML20003B505
Person / Time
Issue date: 02/02/1981
From: Christenbury E
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Barry L, Donoghue D, Tucker E
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF EQUAL EMPLOYMENT OPPORTUNITY, NRC OFFICE OF THE CONTROLLER
References
NUDOCS 8102120278
Download: ML20003B505 (27)


Text

b ac

+

s February 2,1981 MEMORANDUM FOR: Those on Attached List FROM:

Edward S. Christenbury Chief Hearing Counsel, Office of the Executive Legal Director

SUBJECT:

CASES PENDING BEFORE THE COMMISSION, APPEAL BOARDS AND LICENSING BOARDS Attached '.s the February update of the cases pending before licensing boards, appeal boards, or the Comission.

' Orf ginal signed by E. S. Christenbury' Edward S. Christenbury Chief Hearing Counsel Office of the Executive Legal Director Enclosure as stated Internal Distribution:

DocumentManagementBranch(7)

OELD Reading Christenbury Chron OELD attorneys d-7 N1001m c' O

u. % 1a w m g :Me t-S

~.

6 7

c"'c'tQELD

, q,

" ~ ~'>

eave > 02/02/s1 810215 0'............

ac cau ass no eo.Nacu one r) F F 8 r' LA '

'"'"Dm^'*

'u5c*o m w : m '

Multiple Addressees Multiple Addressees:

Daniel J. Donoghue Learned W. Barry Edward E. Tucker fionnan M. Haller James R. Shea Ray G. Smith Robert B. Minogue William J. Dircks Harold R. Denton (10 cy)

John G. Davis Victor Stello (5 cy)

Richard E. Cunningham Thomas Novak (3 cy)

Gus Lainas (3 cy)

Robert Tedesco (3 cy)

Region I (Boyce Grier)

Region II (James O'Reilly)

Region III (James Keppler)

Region IV (Karl Seyfrit)

Region V (Robert Engelken)

Leonard L. Gordon Robert Jackson Darrell Eisenhut (2 cy)

Steven Varga Leonard Bickwit

~.

1 CASES PENDING BEFORE THE 001MISS10n, APPEAL ROARDS A'iD LICENSING FOARDS SER/ACRS

~~~~

FACILITY SU PP.

FCS ASLB BOARD ASLAB BOARD

{PCCktt No. & Vendor)

ISSifED ISSUED ASLB*

MEMBERS ASLAB*

MEFBERS CDPM!SSION*

HEARING STATUS pqnstruction Permit

[

or Early Site Review:

Allens Creek, Units 1 SER Yes X

Wolfe, Chairman X

Rosenthal, Chrm.

Hearing on environmental issues com-l 42 11/74 11/74 Linenberger, Cheatum Buck, Kohl renced on 1/12/81.

(50-466/467)

.Supp.

(GE) 6/75 Barton, Units 1 & 2 No No X

Smith, Chairman On 12/5/80 Applicant filed request to (50-524/525)

Kline, Paxton withdraw its application ared terminate (GE) the proceeding. Staff response filed 12/24/80.

Black Fox, Units 1 SER

-Yes X

Wolfe, Chairman X

Salzman, Chairman Pending before ASLAB on radon. Motion

& 2 -(CP) 6/77 2/77 Purdom, Shon Johnson pending before ASLB to reopen safety (STN 50-555/556)

SER hearings on TMI issues and as lead CP (GE)

Supp.

case, hearings on these issues expected i

9/78, no sooner than Fall 1981.

'3/79, 8/79 Blue Hills, Units 1 Early Yes X

Miller, Chairman Early site review bearing requested by

& 2 (ESR)

Site 7/78 Little

. Applicant. Evidentiary hearing held in -

(50-510/511)(Comb.)

Review May 1979; awaiting ASLB decision. No Report intervention.

/77

  • ' Indicates before which tribunal (s) the case is currently pending.

i l

2 CASES PE'4DIt4G Bff0RE THE Cartn1SSIO*i, APPEAL BOARDS Af40 LICE'iSPG BOARDS SER/ACRS FACILITY SUPP.

FES ASLR BOARD ASLAS BOARD (Docket 'h.1'Vendar)

ISS!IED ISSUED ASLB*

MEMBERS ASLAB*

ftDtBERS C0f tM I SS I 3?4*

iEARING STATUS Construction Pernit or Early Site Revien:

Carroll County Site No -

No X

uolf, Chairnan X

Special prehearing conference held ESR)

Bright, Holton 9/19/79. ASLB granted petitions for 50-599/600) leave to intervene. Special prehear-West) ing conference order issued 5/30/80 and affirned by ASLAB 7/29/80; pett-tion for Cm,nission review has been deniej.

Cherokee, Units 1-3 SER' Yes Chairman not X

Rosenthal, Chrm.

CP5 issued. Appeal Board has approved (STN50-491/492/493) 3/77 10/75 appointed Salanan, Buck Initial Decision except for radon issue (Conb.)

Supp.

deSylva, Jordan which is still before the ASLB. App 11-7/77 cant announced indefinite deferment of Unit a3.

Clinch River-No No X

fillier, Chairman Hearing indefinitely suspended at request suspended)

Linenberger, Hand of Applicant.

50-537) (West)

' Davis-Besse, Units 2

~SER Yes X

Cotter, Chairnan LWA-1 and LWA-2 issued. On 1/24/80,

& 3 (CP) g7/78 1/73 Hand. Hetrick Applicants requested ASLAB to terminate (50-500/501)

%oLSupp.

all proceedings; on 11/17/80 Applicants (B&W) ye t -

requested withdrawal of application, from t

Staff. On 12/1/80, ASLAB directed

( ALAB-522) that the request for with-drawal be presented to ASLB, struck from its docket two PID's which it was to t

review sua sponte, and removed the proceeding from generic radon issue consideration.

Indicates before which tribunal (s) the case is currently pending.

i I

3 CASES PENDING PEFORE THE COMMISSION, APPE AL BOARDS AND LICENSING PDAPDS SER/i!IS FACILITY SU F P.

FES ASLB POARD ASLA9 BOARD iDocket No, & Vendor)

..!SSUE0 ISSUE 7 ASLB*

. MEMBERS ASLAB*

MEMBERS COMMISS10fo HEARING STATUS Construct. ion Permit or Early Site Review:

Fulton, Units 1 & 2 SER Yes X

Cla rk, Ch rm.

On 12/5/EO, Applicant filed rotion to withdraw its application and terrinate (50-463/464) 3/75 4/75

deSylva, (No vendor)

Supp.

Linenberger the proceeding. Staff response filed 7/75 Callihan, Alt.

12/24/80.

Greene County (CP)

SER Yes X

Goodhope, Chrm.

Applicant has advised ASLB that it does (50-549) 9/77 2/9/79 Ferguson, Cole not plan to pursue its application further.

No further hearings will be held. Appli-(B&W)

Supp.

cant has, however, requested ASLB to keep 9/78 docket open until May 1, 1980, while Applicant seeks to sell its assets in the project. Applicant has withdrawn its application filed with the State.

Hartsville, Units 1 SER Yes Wol f e, Chai rma n X Rosenthal, Chrm.

CP's issued. Before ASLAB on radon

& 4 (CP) 4/76 6/75 Leeds, Remick Buck issue only.

(STN 50-518/519/520/

Supp.

521 (GE) 10/76 Hope Creek, Units 1 SER Yes Hill, Paris X

Johnson, Salzman Second Supp. Initial Decision issued

& 2 (CP) 12/71 2/74 4/13/78. ASLAB issued its decision on 1/12/79. Commission declined review of (50-354/355)

Supp.

ASLAB decision of 1/12/79. ASLAB has (GE) 8/73 retained jurisdiction over radon.

Indicates before which tribunal (s) the case is currently pending.

a+.ms.

e an.~.w.

m

>e w

a w

i J

_u

=

1J s-.i 4.44-:

Ii.-

..*hi

%A S

~

+a..-

a 4

1 j

4 6ASES PENDING BEFORE THE COMMISSION, APPEAL BOARDS AND LICENSING BOARDS

~

S(Y/ACRS

' ' ' ' ~

FACILITY SU PP.

FES ASLB BOARD ASLAB BOARD j

IDocket No. & Vendor)

ISSUED ISSUED ASLR*

MEMBERS ASLAB*

MEMBE.RS.,_

COMF!S_SIO?P HEARI3^. STATUS Construction Permit or Early Site Review:

4 Jamesport, Units 1 SER Yes Salzman, Chrn.

By order of 1/15/81, ASLAB granted

& 2 (CP) 10/75 10/75 Johnson Applicants' motion to terminate the (STN 50-516/517)

Supp.

proceeding, dismissed the appeal, 1

(West) 4/76 vacated the ASLB's initial decisions, a

and ordered the Director of NPR to revoke the outstanding construction pe rmits.

j Marble Hill, Units 1 SER Yes X

Salzman, Chrm.

Initial Decision issued 4/78, affirmed t'

4 '

and 2 (CP) 7/77 9/76 (radon Buck by ASLAB. Pending before ASLAB on radon t

STN 50-546/547)

(included issue) issue.

West)

ACRS ltr)

Midland, Units 1 & 2

. SER '

Yes X

Miller, Chairman X

Salzman, Johnson X

Pending before ASLB for decision on

?

CP) Remand 11/70 3/72 Leeds Luebke issue of whether licensee provided full l-50-329/330) disclosure of information. Hearing 84W) record closed.

Montague. Units 1 SER Yes X

Eechhoefer, Chrm.

Application in suspension at request of

&2 7/78 2/77 Decker, Holton Applicant. No hearing schedule.

(50-496/497)

No Supp.

(GE)

_Yet i

North Coast.. Unit 1 No Yes X

Wolfe, Chairman Rosenthal, Chrm.

Applicant requesting Early Site Review (50-376) 4/77 Cole, Linenberger Buck has moved to dismiss proceeding.

i (West)

Intervenor's motion seeking dismissal "with prejudice" has been remanded to 1

ASLB.

Indicates before which. tribunal (s) the case is currently pending.

w

5 CASES PENDING BEFORE THE CC"*:iS:0*4, APPEAL BOAR 05 'N3 LICENS!hG BOARDS SER/ACR S FACILITY.

SUPP.

FES ASLB BOARD ASLAP BOADP LDocket No. & Vendor)

ISSUED ISSUED ASLB*

MEFelRS

_ l M B*

PEMPERS CfMMISSI.ON*._

H1A_QNG 1TATUS.

Construction Permit or Early Site Review:

Of fshore Power Systems SER Yes X

Wolfe, Chairman 7

Salzman, Chrm.

Hearing on both safety and environ-(50-437) 9/75 10/75 Schink, Kornblith Buck mental issues may conclude in the (West) 9/76 Hetrick, Alt.

next few months. Partial proposed FES III Findings of Fact have been submitted to yet to the ASLB by the Staff and Applicant.

CDre Pebble Springs Units SER Yes X

Bowers, Chairman In hearing before the ASLB. Staff I & 2 (CP) 1/76 4/75 Jordan, Martin reviews incomplete. Applicant has (50-514/515)

Supp, announced a four year deferral. Partial (B&W) 1/78 findings of fact and conclusions of law on environmental and site suitability issues filed 12/2/80.

Perkins, Units 1-3 SER Yes X

Bowers, Chairman X Rosenthal, Chrm.

Hearing on both safety and environmental (CP) 3/77 10/75 deSylva, Jordon Buck, Salzman issues completed, except for effects of (STN 50-488/489/490)

Supp.

the TMI accident. Applicant has indef t-(Comb.)

7/77 nitely deferred the facility. Hearings to be reopened for consideration of TMI-related issues. Appeal by Inter-venor on alternative site PID is pending before ASLAB.

Phipps Bend Units 1 SER Yes Luton, Chairman X

Rosenthal, Chre.

ASLAB affirmed Initial Decision; retained

&2 4/77 2/77 Hill, Schink Salzman, Buck jurisdiction over radon issue.

(50-553/554)

Supp.

(GE) 9/77 Indicates before which tribunal (s) the case is currently pending, i

6 CASES PENDING PEFORE THE COMMISSION, APPEAL BCAR05 AND LICENSING BOARDS SER/ACRS

~

~

~

F ACILITY SU PP.

FES ASLB BOARD ASLAB BOARD (Docket No. A Vendor)

ISSUED ISSUED ASLB*

PEMBERS ASLAB*

MEMBERS COMMilSJJ3*_ __.

HE AR I NG. St all!S. _

Construction Permit or Early Site Review:

Pilgrim, Unit 2 (CP)

SER Yes X

Goodhope, Chrm.

X Salzman, Chrm.

Proposed findings, in the form of a (50 471) 5/75 9/74 Callihan, Cole Buck Partial Initial Decision, were sub-(C orb. )

Supp.

Final mitted on all issues except emergency 1/76 Supp.

planning.

Issued 5/79 Seabrook, Units 1 & 2 SER Yes Smith, Chairman X

Rosenthal, Chrm.

X Radon issue pending before ASLAB.

(50-443/444 B/74 12/74 Salo Buck Commission has remanded to ASLAB for (West)

Supp.

further consideration of seismic issues.

3/75 Hearing scheduled to begin on 4/6/81.

Shearon Harris, Units SER Yes

.X Smith, Chairman Rosenthal, Chrm.

CP's issued; before ASLAB on radon issue.

1-4 (CP) 12/72 5/73 Leeds, Bright Buck (50-400/401/402/403)

Supp.

(West) 4/73 Skagit,' Units 1 & 2 SER Yes X

Deale, Chrm.

Rosenthal, Chrm.

Applicant has announced change in site (CP) 8/77 5/75 Hoope r, Buck of facility. New ER to be filed in (STN 50-422/423)

Supp.

Linenberger late 1981.

(GE) 10/78

'St. Lucie, Unit 2 (CP).SER Yes Hooper, Hetrick X

.Salzman, Johnson X

CP issued. In ALAB-603 (7/30/80), ASLAB (50-3B9) 11/74 5/74 ruled that loss of all AC power is to be (Comb.)

Supp.

considered a design basis event; CP 3/76 approved subject to this modification.

The Commission has decided to review generic aspects of ALAB-603, by order of 12/12/80. Pending before ASLAB on radon release issue.

Indicates before which tribunal (s) the case is currently pending.

7 CASES PENDING BEFORE THE COMMISSION, APPEAL P0ARDS AND LICENSING F0ARDS SER/ACRS

~ ~ ~

F ACIL ITY SUPP.

FES ASLB BOARD ASLAB BOARD iPqqket No. & Vendor)

ISSUED ISSUED ASLB*

MEMBERS ASLAB*

MLM81_RS

__ _ _C.0*4! S S I ON

  • MEARING STATUS Construction Permit or Early Site Review:

Wolf Creek (CP)

SER Yes X

Rosenthal, Chrm.

Pending before ASLAP en radon issue.

(STN 50-482) 9/75 10/75 Ruck (West)

Supp.

1/76 WPPSS, Units 1 SER Yes Lazo, Chairman X

Salzman, Chrm.

CP issued 2/78. Pending before ASLAB on

&4 5/75 3/75 deSylva Sharfman, Buck radon issue.

(50-513)

(B&W)

Yellow Creek, Units 1 SER Yes Smith, Chai rman X Rosenthal, Chrm.

CP issued 11/78. Pending before ASLAB

& 2 (CP) 12/77 11/77 Paris Salzman, Buck on radon issue.

(STN 50-566/567)

Supp.

(Comb.)

6/78 Indicates before which tribunal (s) the case is currently gending.

L 8

CASES PEKOING BEFORE THE COPMISSION, APPEAL ROARDS AND Li"ENSING P0ARDS

^~

SER/ACRS

~ ~ ' '

F ACILI TY SU PP.

FES ASLB ROAPD ASLAB POARD

-IDocket No, t Vendor)

ISSUED ISSUE 0 ASLB*

PEMBtRS ASLAB*

MEMBERS COM*!SSION*

HEARING STATUS Operating Lice-se:

Byron (Units 1 5 2)-

No No X

Miller, Chairman Orders ruling on contentions issued (50-454/455)

Callihan, Cole by ASLB on 12/19/80.

(West)

Braidwood (Units 1 No No X

Miller, Chairman ASLB determined that two petitions for

& 2)

Callihan, Cole leave to intervene pending before it (50-455/457) satisfy interest requirements. Special (West) prehearing conference held 8/23/79.

Callaway, Units 1 & 2 No No X

Gleason, Chairman Petitions for leave to intervene pending (50-483/486)

Bright, Kline before ASLB.

Clinton (Units 1 No No X

Clark, Chairman Special prehearing conference to be and 2)

Ferguson, Paris held on 1/29/81.

(50-461/462)

(GE)

Comanche Peak I & 2 No No X

Deale, Chairman Contested hearing. No hearing dates (50-445/446)

Remick, Cole scheduled. Board Order admitting con-(West) tentions issued on 6/16/80; modified in part by order of 10/31/80. Intervenors consolidated and lead parties designated by order of 12/31/B0. Discovery has commenced.

Indicates before which tribunal (s) the case is currently pending.

9 CASES PENDING PEFORE THE COMMISSION, APPEAL BOARDS AfiD LICENSING BOARDS SER/ACR$

FACILITY SU PP.

FES ASLB BOARD ASLAB BOARD IQgcket No. L tendarJ_ ' ISSUED ISSUED ASLB*

MEMBERS ASLAB*

MEMBERS COMMISSION

  • HEARING STATUS Operating License:

Diablo Canyon, Units 1 SER Yes X

Bowers, Chairman X Salzman, Chrm.

X Safety tearings closed 2/15/79.

Motion

&2 10/74 5/73 Bright, Martin Moore (Security) to grant fuel load and low power test (50-275/323)

Supp. 10 Johnson licenses pending before ASLB. Possible (West) issued Buck (Seismic) hearing on low power testing to be held 8/80 in early 1981. Seismic partial initial decision issued 9/29/79. Hearing before ASLAB on seismic issues held on 10/20-25/80; hearing before ASLAB on security issues held on 11/10-15/80.

Fermi, Unit 2 No No X

Bechhoefer, Chrm.

Contested hearing. No hearing date (50-341)

(Interim Schink, Shon scheduled.

(GE),

SER issued 9/77)

Ginna. Unit 1 (FTOL)

No Yes X

Grossman, Chairman No hearing to be scheduled until Staff (50-244) 12/73 Luebke, Cole completes its SEP review.

(West)

Indian Point Units'1, No No Jensch, Chairman X ALAB-436 majority opinion issued.

2&3 Daiber, Briggs Quarles, Buck chairman Farrar's dissenting opinion (Seismic) issued on 8/3/79. Supplemental (50-3) majority opinion issued on 9/6/79.

(B&W)

Commission has declined to review decision.

  • Indicates before which tribunal (s) the case is currently pending.

9 10 CASES PENDING BEFORE TuE C0" FISSION. arpE: =02905 ASD LICENSING BOARDS SER/ACRS FACILITY SUPP.

FES ASLB BOARD ASL2E ECARD (Docket No. & Vendor)

ISSUED ISSUED ASLB+

MEMBERS ASLAB*

"E"?ERS COMMJSSION*

_. FEAR [NG_ STATUS Operating License:

Lacrosse (FTOL)

. No Yes X

Bechhoefer, Chre.

Contested hearing. Discovery has been (50-409) 4/80 Anderson, Decker reopened. Motions for summary disposi-(AC) tion of environmental contentions are pending before ASLB and may be amended following further discovery. No hearing date set.

McGuire, Units 1 & 2 SER Yes X

Lazo, Chairman ASLB Initial Decision issued 4/18/79, (50-369/370) 3/78 4/76 Hand, luebke stayed by ASLB, pending issuance of SER l

(West)

Supp.

supplement covering generic items. SER 5/78(1);

Supp. 3, which addresses generic issues, 3/79 (2);

was issued in May 1980; Supp. 4 issued 5/80 (3);

in January, 1981. Intervenor's motion 1/81 (4).

to reopen record has been granted by ASLB. Applicant's motion for low power test license has been granted in part.

Midland, Units 1 & 2 No No X

Bechhoefer, Chre.

Contested hearing. Discovery opened.

(50-329/330)

Cowan. Linenberger Staff review delayed. Hearings sched-(B&W) uled af ter issuance of principal staf f documents. Construction completion date revised to mid 1984 North Anna, Units 1 SER Yes X

Rosenthal, Chrm.

OL issued. Pending before ASLAB on

& 2.

6/76 Buck turbine missile impacts as well as (50-338/339)

Supp.

radon.

(West) 8/77 12/77 5

l Indicates before which tribunal (s) the case is currently pending.

}

4 i

.~...... ~

1 Ai 11 CASES PENDING BEFORE THE COMMIS$10N, APPEAL BOARDS AND LICENSthG BOARDS SER/ACRS F ACILITY SU PP.

FES ASLB BOARD ASLAB BOARD IDocket No.1 Venco A ISSUED ISSUED aSLB*

MEMBERS ASLAB*

MEMBERS COMMI1SION*

FLAPING_STaruS Operating License:

Oyster Creek, Unit 1 No Yes X

Lazo, Chairman X

Rosenthal, Cnrr.

Motion to terminate proceeding granted (50-219) 12/74 Paxton, Purdom Buck, Moore by ASLB on 2/22/80. Order stayed by (GE)

ASLAB. On 9/5/80, ASLAB remanded the case to ASLB to consider additional information which ASLAB directed Staf f to provide on unresolved generic safety issues which might apply to Oyster Creek operation. ASLB decision is pending.

~ Palo Verde. Units I, No No X

Lazo, Chairman Petition for leave to intervene has been 2,83 Callihan, Cole granted by ASLB.

(50-528/529/530)

Peach Bottom, Units 2 SER Yes None X

Buck, Johnson Pending before ASLAB on radon issue.

83 8/72 4/73 (50-277/278)

(GE)

Robinson, Unit 2 N.A.

Yes Wolf, Chairman X

Partial Initial Decision issued by ALSB.

(Section B) 4/75 Callihan, Cole

Salzman, ASLAB decision of 10/31/79 (ALAB-569)

(50-261)

Johnson affirmed ASLB Partial Initial Decision.

(West)

Pending before ASLAB on radon only.

San Onofre, Units 2 SER.. No X

Smith, Chairman Contested hearing. No hearing dates

& 3-12/80 Hand, Luebke scheduled. SER on geology / seismology (50-361/362) issued on 12/31/80.

.(Comb.)

Shoreham SER Yes

,X-Bowers, Chairman -

Contested hearing. No hearing dates (50-322) expected

-12/77

- Paris, Shon scheduled.

(GE) 3/80 Indicates before which tribunal (s) the case is currently pending.

4 12 CASES PENDING EEFORE THE COM!*ISSION, APPEAL BOARDS AND LICENSING BOARDS

~

SER/ACRS

~ " ~ ~

FACILITY SUPP.

FES ASLB BOARD ASLAB BOARD 10cchet No. & Vendori ISSUED ISSUED ASLB*

MEMBERS ASLAB*

MEMBERS COMMISSION

  • FEARING STATUS Operating License:

South Texas, Units 1 No No X

Bechhoefer, Chrm.

Contested hearing. Comrission has and 2 Lamb, Luebke ordered initial hearing on applicant's (50-498/499) character and competence; hearing (West) likely to commence in May 1981.

Summer Unit 1 No Yes X

Grossman, Chairman Contested hearing. No hearing dates (50-395) 10/77 Hoope r, scheduled.

(West)

Linenberger Susquehanna Units 1 No No X

Bechhoefer, Chrm. X Salzman, Chrm.

Contested hearing. Hearing not likely and 2 Bright, Paris Buck, Moore until early 1981. Discovery in progress.

(50-387/388)

(GE)

Three-Mile Island, SER Yes Chairman X

Rosenthal, Chrm.

Hearing before ASLAB on aircraf t protec-Unit 2 9/76 12/76

Sale, Johnson, Buck tion issue concluded on 2/25/B0. Also (50-320)

Supp.

Linenberger pending before ASLAB on radon.

(B&W) 3/77 2/78 Waterford 3 No

. No X

Wolfe, Chairman Contested hearing. No hearing dates (50-382)

Jordan, Foreman scheduled.

(Comb.)

Zimmer, Unit 1 SER Yes X

Bechhoefer, Chairman Contested hearing. Hearings to be held (50-358) 2/79 6/77 Bright, Hooper on technical qualifications, emergency (GE).

plans, radiological monitoring, finan-cial qualifications and Three Mile Island related issues.

  • -Indicates before which tribunal (s) the case is currently pending.

13 CASES PENDING PEFORE THE COMMISSION, APPEAL E0ARDS AMD LICENSING BOARDS SER/ACRS

. * *Y SUPP.

FES ASLP BOARD ASLAB ECARD (Doc e '.. % Vendor)

ISSUED ISSUED ASLB*

f1 EMBERS ASLAB*

MEMBERS COMMISSION

  • HEARING STATUS __

Ljee-s+ 2rendnent:

Ame: :orces No No X

Carter, Chm, Petition for leave to intervere has Ra: :p alogy Hill, Schink been filed. Staff response filed 1/26/81.

esea
n Insti-tAe ;2 m I)

I' Me se Renewal)

(50 '.M )

Big k :n c int No EIA.

X Grossman, Chm.

X Moore, Chre.

Contested hearing. Contentions admitted.

o Uni; I (SFP)

No Paris, Shon Buck, Kohl Discovery in progress. ASLAB has been established to rule on NEPA issue.

(50-155)

-(GE)

Commission to determine whether to Dresden, Unit 1

~ No '

Yes grant hearing prior to action. Staff (Decontamination) views have been filed; views of other (SC-!O) parties to be filed by 2/17/81.

Dresden, Units 2 & 3.

No EIA X

Wolf, Chaiman Contested hearing. Special prehearing (SFP)-(50-237/249)

No Little, Remick conference held on 8/19/80. Hearing completed 11/21/80 except as to channel (GE) bowing issue; hearing date not yet established.

Drescen-Ouad Cities No EIA X

Milhollin, Chrm.

Contested hearing. Special prehearing (Shipeent of Spent No Johnson, Stober conference held 2/01/79.

Fuel)

(SC-237/249)

(GE; C3

ncicates before which tribunal (s) the case is currently pending.

g

25. e)

Ee

14 CASES PENDING PEFORE THE COMMISSION, APPEAL ROARDS AND LICENSING 90AD05 SER/ACRS FACILITY SU PP.

FES ASLB BOARD ASLAB E0ARD (Docket No. & Vendor)

ISSUE 0 ISSUED ASLB*

MEMBERS ASLAB*

ME"RERS COMMISSION

  • HEARING STATUS..

License Amendment:

Duke Power Co.

Yes EIA X

Miller, Chairman X

Rosenthal, Chrm.

X Contested hearing. Hearing completed (SNM-1773) 1/79 Yes Hand, Luebke Buck, Salznan on 4/29/80. Initial decision issued (Spent Fuel Trans-12/78 on 10/31/80, denying application for portation & Storage) license amendment. Appeals by Appli-(70-2623) cant and Staff are pending before ASLAB.

^~

General Electric Co.

No No X

Goodhope, Chairman Hearing indefinitely suspended at request (GE) Morris Opera-Little, Remick of Applicant.

tion Expansion (Spent Fuel Storage)

(70-1308)

General Electric Co.

No EIA X

Goodhope, Chairman Intervenors' contentions admitted by Order (GE) Morris Opera-No Little, Remick of 6/4/80. Discovery schedule established tion.

6/5/80 by Orders of 6/4/80 and 6/23/80. Staff (License Renewal)

EIA issued on 6/5/80. Recent promulgation (70-1308) of Part 72 will govern proceeding and may have impact upon previously admitted contentions.

Humboldt Bay (deletion. No No Chai rman Contested hearing. Motion to withdraw of seismic condi-Linenberger, application for license amendment and tions)

Schink to terminate the proceeding filed by (50-133)

Applicant on 12/31/80. Staff response (GE) filed 1/21/81.

Indian Point, Unit 2 N.A.

Yes Daiber, Briggs Buck,Quarles X

Pending before Commission for decision Cooling Tower) 8/76 on whether NRC has authority to require 50-247) closed cycle cooling or whether such West) authority. lies solely with EPA.

Indicates before which tribunal (s) the case is currently pending.

15 CASES PENDING BEFORE THE COMMISSION, APPEAL E0ARDS AND LICENSN " CARDS

~~

~

.SER/ACRS

~ ~ ~ ~ ~ ~

~ ~~

~ ~ ~ ~

~~

FACILITY SUPP.

FES ASLB ROARD ASLAB E0ARD LDocket No. & Vendori ISSulp_JMUED ASLB*

MEMBERS A_SLA BL _. MEMBERS COMfi! SS(Q'.*

HEAR [NG_ STATUS License Amendment:

Lacrosse (SFP)

Yes Yes X

Bechhoefer, Chm. X Rosenthal, Chrr.

ASLB issued Initial Decision on 1/10/80 E!A Anderson, Decker Quarles, Moore granting the license amendment. Juris-(50-409)

SER

. 7/13/79 dictional question on need for power (AC) 7/13/79 issue and hearing is pending before the ASLAB.

_ _ ~ _ _ _,

No No X

Lazo, Chm.

Petition for leave to intervene has been Maine Yankee (SFP) '

Hand, granted. Prehearing conference held in 50-309 (Comb.)~

Linenberger October 1980. Second notice of.oppor-tunity for hearing published on 1/28/81, pursuant to ASLB order.

North Anna,' Units l '

No E!A X

Deale, Chaiman X

Rosenthal, Chm.

ASLB has granted Applicant's motion for

& 2 (SFP)

No Hill, Stober Buck, Quarles summary disposition on all contentions.

Hearing teminated. Affirmed by ASLAB.

(50-338/339)

Petition for review denied by Commission.

(West)

Petition for review filed before U.S.

' Court of Appeals for the District of Columbia.

Salem Unit 1 (SFP)

SER EIA X

Milhollin, Chm.

X Kohl, Chm.

Contested hearing. Initial Decision (50-272)

L1/12/79 1/12/79 Shon, Lamb Johnson, Moore issued 10/27/80 authorizing amendment.

Exceptions to Initial Decision have (West) been filed and briefed.

Indicates before which tribunal (s) the case is currently pending.

. _.. _. _. _. _ _.. ~ ~.. - _. - -,

4

]

i 1

4 i

16

)

CASES DENDING BEFORE THE COMMISSION, APPEAL BOARDS AND L!cENSINO BOARDS SER/ACRS FACILITY SU PP.

FES ASLB BOARD ASLAB BOARD 4 -

LDocket Nn. 5 Vendor)

ISSUED ISSUED 'ASLP*

MEMBERS ASLAR*

MEMBERS COMMISSION

  • HEARING STATUS i

License Amendment:

Trojan (Control SER-No X

Miller, Chairman Posenthal, Chrm.

Contested bearing. SER on modification Building) 2/14/80 McCollom, Paxton Buck, Johnson of control building issued on 2/14/80.

(50-344)

Further hearing on proposed modifications (West) concluded on 4/17/80 and initial decision issued by ASLB 7/11/80. Appeal filed by State of Oregon has been resolved by stipulation, approved by ASLAB by Order of 1/6/81 (ALAB-627). No SER issued on interim operation. PID (Interim Opera-tion) issued by ASLB 12/21/78, OL amend-i ment issued 12/22/78, and PID affirmed

{

by ASLAB 3/27/79.

Turkey Point Nuclear SER Ne X

Bowers, Chairman Contested hearing. No hearing date Generating Plant, 6/29/79 Paris, Luebke scheduled.

j Units 3 and 4 (Steam Generator.

I Repair) i (50-250/251)

UCLA Research No No X

Bowers, Chairman Petition for leave to intervene filed Reactor (License Luebke, Paris.

5/22/80. Prehearing conference held on

_ Renewal '

9/25/80; further prehearing conference (50-142 to be held on 2/4-5/81.

' Zion, Units 1 & 2.

No EIA X

Wolf, Chairman Contested hearing. Hearings held during (SFP) (50-295/304)

No Little, Remick the weeks of June 11 and June 18, 1979.

(West)

Initial decision issued by ASLB on 2/14/80 authorizing license amendment.

ASLAB af firmed initial decision in ALAB-616.

3 Indicates before which tribunal (s) the case is currently pending.

t L

l Y

a

~~

4 i

17 CASES PENDING BEFORE THE CO"w!SS:0N. APPE2 20:005 AND LICENSING BOARDS

, - -. - ~ ~

FACILITY 9fPP.

FES ASLB BOARD ASL ? 30 ARC 100cket No. & Vendor)

ISSUED ISSUED ASLB*

MEMBERS ISLAB*

wEw?E25 COMMISS!ON*

HEARING STATUS Special:

+

Alabama Nuclear Fuel.

No No X

John Wolf, Chair-en Petitions for leave to intervene are Fabrication Plant Foreman, Steindier pending before ASLB. Special prehear-(ANFFP)-Application ing conference held on 8/21/80 to con-for a special nuclear sider petitions. Stipulations of con-

?

material license tentions and statements of position to (70-2909) be filed by 2/28/81.

4 1

Bailly Generating No No X

Request for hearing denied per Commis-4 Station sion Memorandum and Order of 12/12/79.

(Short piling proposal)

Petition for review filed with D. C.

(50-367)

Circuit.

i (GE)

Bailly Generatir.g

. No No X

Grossman, Chairran Contested hearing. No hearing date Station' Cole, Bright scheduled.

(Construction Permit Extension)

(50-367)

(GE)

. Si Rock Point

.. No No '

X Wolfe, Chairman Contested hearing, in indefinite sus-Increase M0X Fuels)

Foreman, Shon pension as a result of GESMO decision.

i.

50-155) 1

, (GE) j Midland Nuclear Power No No X

Bechhoefer, Chrm. F Salzman, thre.

Hearing on Order Modifying Construc-Plant, Units 1 Cowan, Linenberger Buck, Fohl tion Permits has been noticed.

Pre-hearing conference held on 9/10/80.

and 2 Order ruling on petitions and admitting (Soil Construction,

j Activities) contentions issued by ASLB on 10/24/80 (50-329/330)

Certain OL issues have been consoli-1 1

(B&W) '

dated with this proceeding.

l Indicates before which tribunal (s)-the case is currently pending.

2 1

18 CASES PENDING EEFORE THE COMMISSION, APPEAL BOARDS AND LICENSING BOARDS SER/ACRS FAC:L:TY SU PP.

FES ASLB BOARD ASLAB BOARD IDocket 'd. 5 Vendori ISSUED ISSUED ASLB*

MEMBERS ASLAB*

MEMBERS COMM11SION*

HQRING_SIATUS Special:

NECO (Sne' field)

No No X

Goodhope Chm.

X Rosenthal, Chm.

Contested hearing. Licensee seeks to (27-39) (Licensee Little, Remick Johnson, Salzman withdraw application for license renewal.

renewal applica-Commission has consolidated with show tion, conditions cause order preventing licensee from on te mination of abandoning the site. Discovery in license and order progress.

to show cause)

Palisades No No X

Bechhoefer, Chm.

Intervention granted. Hearing likely (Replacement of

Anderson, in 1981.

Steae Generators) 1.ivingston (50-255 SP)-

(Cose.)

Rancho Seco Nuclear Yes N.A.

X Bowers, Chairman Hearing completed on 5/14/80 and record Generating Station, SER Shon, Cole closed. Proposed findings have been Unit No.1 (Post-7/79 filed.

start e hearing)-

(50-312)

(88W)

(v} Three Nile Island, Yes No X

Wolf, Chairman Contested Hearing. Prehearing con-Unit 2 2/11/80 EIA Shon, Paris ference held on 7/7-8/80. Negotiations (M

(50-320)-OLA' 2/11/80 on contentions in progress.

M 6

3 Ei?e)'

  • Indicates before which tribunal (s) the case is currently pending.

x c

4 l

19 CASES PENDING BEFORE THE COMMISSION, APPEAL BOARDS AND LICENSING BOARDS SER/ACR5 j

FACILITY SU PP.

FES ASLB BOARD ASLAB BOARD 1 Docket No. A Vendor)

ISSUED ISSUED ASLB*

MEMBERS ASLAB*

MEMBERS

_j;j?ti[SSION*

HEARING S_TATUS_.

Special:

Three Mile Island, Yes No X

Smith, Chairman Contested bearing. A number of peti-tioners have been admitted as inter-Unit 1 SER Jordan, Little venors. Hearing commenced 10/15/80.

(50-289) 6/16/80 The Commission has denied motion for (B&W)

Supp. 1.

certification of psychological stress 11/28/80 issue, but may reconsider this matter later (CLI-80-39).

Contested hearing. Discovery in Vallecitos Nuclear Yes No X

Grossman, 1

Center: GETR (show SER Chairman progress. No hearing dates scheduled.

cause) 5/23/79

Foreman, l

(50-70)

.and Linenberger 4

(not LWR) 10/27/80 Contested hearing. No hearing dates Vallecitos Nuclear No No X

Grossman, scheduled.

Center: GETR Chairman (Renewal)

Foreman, (50-70)

Linenberger (not LWR)

Contested hearing. No hearing dates Vallecitos Nuclear No No X

Grossman, scheduled.

Center: (Special Chairman Nuclear Material)

Foreman, (70-754)

Linenberger (not LWR) i 1

Indicates before which tribunal (s) the case is currently pending.

r

]'

i 20 CASES PE'Ci% BEFORE THE COMMISSIUN, APPEAL BOARDS A.':D LICENSING BOARDS

~

~ ~~-

~~

~

SER/ACRS F ACILITY SUPP.

FES ASLB BOARD ASLAB BOAPO IDocket No. & vendor)

ISSUEp IS_$f) ASLE*

MEMBERS A} LAB

  • MEMBERS ComISSION*

HEARING STATUS Antitrust:

Parton, Units 1 & 2 N.A.

N.A.

X Glaser Chaiman X

Hearing suspended. On 12/5/80. Appil-(50-524A/S25A)

Elzinga, Miller re motion to cant filed request to withdraw its consolidate CP applications and to teminate the with Farley on proceeding, antitrust i

Comanche Peak N.A.

N.A.

I Miller, Chaiman Contested hearing. Proposed license con-1 Steam Electric Glaser, Wolf ditions in settlement of antitrust issues t

have been submitted to ASLB by all Station, Units I parties.

82-(50-445A/446A)

Farley, Units 1 & 2 N.A.

N.A.

X Farrar Chm.

Pending before ASLAB for decision.

(50-348A/364A)

Salzman, 3

Sharfman

. South Texas, Units 1 M.A.

N.A.

X Miller, Chairman Contested hearing. Proposed license 82 Glaser, Wolfe conditions in settlement of antitrust issues have been submitted to ASLB by

. (50-498A/499A)

DOJ, NRC Staff and Applicants. Inter-venors have filed their positions on proposed settlement agreement; other parties have filed responses.

4 Indicates before which tribunal (s) the case is currently pending.

q

l

)-

i

~

e I

i 1

21 CASES PENDING BEFORE THE CnMMISSION, APPEAL BOARDS AND LICENSING BOARDS SER/ACRS FACIL ITY SUPP.

FES ASLB BOARD ASLAB BOARD j

{ Docket No. A vendor)

ISSUED ISSUED ASLB*

MEMPERS ASLAB*

MEMBER.S COMMISSION

  • HEA3!NG STATUS 4

I Antitrust:

4 St. Lucie, Unit 2 N.A.

N.A.

X Smith, Chairran Contested hearing. No hearing date j

(50-389A)

Deale. Lazo scheduled. Staff, 00J and Applicant have submitted a proposed settlement agreement to ASLB, to which Intervenors i

have not agreed. Intervenors have filed comments on the proposed license conditions; other parties have filed responses, l

3 St. Lucie Plant,

.N.A.

N.A.

X Commission decision issued on 12/21/79 which denied request for a Section 105a Units 1 & 2 j

proceeding at this time. Commission (50-335A/389A) to await result of remedy hearing in Federal district court. Matter now j

pending in D. C. Circuit.

d

.Stanislaus, Unit 1 N.A.

N.A.

X Miller, Chairman Contested hearing. No hearing date 1

(P-564-A)

Wenner, Wolfe scheduled. Discovery in process.

i Turkey Point Plant, N.A.

N.A.

X.

See St. Lucie Plant, Units 1 & 2 above.

Units 3 & 4 (50-250A/251A)

Virgil Summer Nuclear N.A.

N.A.

X DOJ has submitted to Commission its Station, Unit 1 position concerning "significant change" determination. Matter pending before (50-395A) the Commission.

}_

l Indicates before which t' ibunal(s) the case is currently pending.

}

r 4

I i

t i

i d

i 22 CASES FEN 0 LNG BEFORE THE CO*VISSION, APPEAL BOARDS AND LICENSING BOARDS SER/KCRS e

FACILITY SUPP.

FES ASLB BOARD ASLAB BOARD IDocket No. & Vendor)

ISSUED ISS])1_D__AXB*

MEPRERS AS(AB*

MEMBERS._

_COMMIS1!0N.*. _

HEARING STATUS Enforcen nt Actions:

Consumers Power Co.

N.A.

N.A.

ALJ Smith Conducting discovery.

(50-255)

(Palisades)

Dairyland Power N.A.

N.A.

X Bechhoefer, Chru.

Prehearing conference and preliminary Cooperative Anderson, Decker hearing held on 12/16/80. Discovery on remaining issues to commence 3/1/81.

(50-409)

Hearing not anticipated before mid-1981.

(La Crosse Boiling Water j

Reactor)

Environmental M.A.

N.A.

Requests for hearing being held in abeyance pending issuance of Safety Qualification Evaluation Reports.

Orders Niagara Mohawk N.A.

M.A.

Request for hearing has been received.

Power Corp.

(50-220)

(Nine Mile Point)

I Northern States N.A.

N.A.

X Commission decision issued on 11/3/80 (CLI-80-36); motion for reconsideration Power Co.

has been denied. Construction Permit (Tyrone Energ to be revoked by Director of MRR.

Park, Unit 1)

Teletherapy N.A.

N.A.

X Request for hearing pending before Commission.

Licensees Indicates before which tribunal (s) the case is currently pending.

23 CASES PENDING BEFORE THE COMMISSION, APPE AL BOARDS ANO LICENSING BOARDS SER/ACRS F ACILI TY SUPP.

FES ASLB BOARD ASLAB BOARD

[ Docket No. 8 Vendor)

ISSUED ISSUED ASLB*

MEMBERS ASLAE*

MEMBERS COMMISSION

  • HEARING STATUS Export License Proceedings X

Petitions for leave to intervene and Taiwan (110-1075/1076) request for hearing have been filed; answers have been f;1ed.

(GE)

(110-2058/2175)

(WEST)

(110-2252/2253/2254)

(CE)

Indicates before which tribunal (s) the case is currently pending.

24 CASES PENDING BEFORE THE COMMISSION. APPEAL BOAR 05 AND LICENSING SOAQ:S

~ ~ ~ ~ ' ~

SER/ACRS FACI LITY SU PP.

FES ASLB BOARD ASLAB BOARD 1 Docket No. A Vendor)

ISSUED ISSUED ASLB' MEMBERS ASLAB*

MEMBERS COwMISSION*

HEARING STATUS Formal Rulemakings:

Corrission Order issued on 1/16/81.

Storage and Disposal N.A.

N.A.

Presiding Officer.

of Nuclear Waste Miller Sumrary of Statements of Position to te filed on 1/29/81.

(RM 50-8)

Indicates before which tribunal (s) the case is currently pending.

25 CASES PENDING BEFORE THE COMMISSION. APPEAL BOARDS AND LICENSING BOARDS SER/ACRS F ACILI TY SU PP.

FES ASLB BOARD ASLA8 BOARD (Docket No. & Vendor)

ISSUED ISSUED ASLP*

MEMBERS ASLAB*

MEMBERS COW ISSION*

HEARING STATUS Operator License Denials Request for hearing has been received.

Individual at N.A.

N.A.

Notice has not yet been issued.

TMI-Unit 1 Indicates before which tribunal (s) the case is currently pending.