Responds to NRC Re Availability of Final Review of Resin Stability.Rept Provided After Necessary Sampling of EPICOR-II Liners Not Anticipated Before May 1981.Will Submit Firm Date within Wk of Receipt of First Liner from DOE
ML20003B451
Person / Time
Site: Crane 
Issue date: 02/06/1981
From: Hovey G
METROPOLITAN EDISON CO.
To: Snyder B
Office of Nuclear Reactor Regulation
References
LL-2-81-0032, LL-2-81-32, NUDOCS 8102120102
Download: ML20003B451 (1)


Text

ost 0 i Box 8 Mafdletown, Pennsyb una 17057 Wrrt*r's oiract Dial Number February 6, 1981 LL2-81-0032 TM1 Program Office Attn:

Mr. B. J. Snyder, Program Director U. S. Nuclear Regulatory Co:. mission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Evaluation of Resin Stability In your letter of January 22, 1981, you requested a firm timetable on the availability of our final evaluation of resin stability within two weeks of your letter.

As you probably appreciate, such a final report will properly be based in large part on information gleaned from the sampling of one or more highly loaded EPICOR-II liners. As you are aware, the timing of such sampling is not firm, but is being expedited.

Accordingly, the availability of the final evaluatien will follow such sampling; but we do not anticipate it will be prior to May, 1981.

We will provide you with a firm date within one week of the date the liner is shipped by the DOE from the site.

first Sincerely,.

K G. K. Hovey Vice-President and Director, TMI-2 CKH:RIN:djb cc:

L. Barrett, Deputy Director Yf 81021%D \\O1.