ML20003B057
| ML20003B057 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 02/04/1981 |
| From: | Baum P PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20003B058 | List: |
| References | |
| NUDOCS 8102100283 | |
| Download: ML20003B057 (4) | |
Text
MONTHLY NARRATI'.T. REPORT OF CPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the scnth of January, 1981. This report was prepared by the Plant Staff and is submitted in acccrdance with Section IX:I.l.c. of the Technical Specifications.
During the report period the reactor remained in the cold shutdown nede of cperation. There were no significant events associated with the operation of the Unit. There was no significant =aintenance completed during the =enth.
8102144 jgrf
w OPERATLNG DATA REPORT DOCKET NO. S'O ~/ 3.3 DATE Z-f-Wi COSIPLETED BY AW.6AUM TELEP110NE 707/443 -3787 OPERATING STATUS
'N05
- 1. Unit Name:
Motb7 AY 4 WT ArsT
- 2. Reporting Period:
7A4 UAM 19 81
- 3. Licensed Thermal Power (SlWr):
MO
- 4. Nameplate Rating (Gross 31Wel:
W
- 5. Design Electrical Rating (Net 5twel:
W
- 6. Staximum Dependable Capacity (Gross StWe):
- 7. Statimum Dependable Capacity (Net 51We):
A3
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A MfA
- 9. Power Level To Which Restricted,if Any (Net 51 e -
- 10. Reasons For Restrictions,If Any:
N This 51onth Yr to Date Cumulatise
- 11. Hours in Reporting Period 744 N
- /U. Mf
- 12. Number Of flours Reactor Was Critical O
o 9 8, ( ej l
- 13. Reactor Reserve Shutdown Hours O
- 14. Hours Generator On Line "i 9. "Z. f2.
- 15. Unit Resene Shutdown flours O
- 16. Gross Thermal Energy Gerierated I\\1WH)
/C t/8,44~(
- 17. Gross Electrical Energy Generated (StWH) v Y
4,739.132
- 18. Net Electrical Energy Generated (51Wil)
- 2. 3 9
- 2. 3 T -
4.483,d34
- 19. Unit Senice Factor o
O 43.4 %
- 20. Unit Availability Factor
$ 3.Q.
- 21. Unit Capacity Factor (Using h!DC Net) 46.4P.
- 22. Unit Capacity Factor IUsing DER Net) 4 4" o*/.
- 23. Unit Forced Outage Rate U
V l 9 I 7.
(
- 24. Shutdowns Scheduled Over Nest 6 Stonths (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date orStartup: 1 Mb ETEAmrM ATE
- 26. Units in Test Status (Prior to Commercial Operationn Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY CO%151ERCI A L OPER ATION (4/77 )
.t UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO. N -/33 UNIT N AME #d AP */ 3 DATE 2-+-Bi REPORT MONTil A
/
/
COMPLETED BY AW OAvm
.TELEPilONE 7o7/#3-2.981 e.
E c
jE
}
$ Yi Licensee Eg ja.,
Cause & Corrective No.
Date g
3g jg5 Esent 31 o1 Action to Repori
- v2 O hO Psevent Recurrence
$E 5
3 ;f3 H
e; u
e o
76-f 7 6 010'Z S
744 9N J
M/A TEMmt C. M obS icxnoAS.
S 6-3 0
9 25?)
O ass a
a bg i
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Stheduled A Equipment Failure (Explain) 1 Manust for Preparation of Data
=2 li-Maintenance of Test 2 Manual Scram.
Entry Sheets for Lwegisce h
C Refueling 3 Automatic Scram.
Event Report (LERI Fife (NUREG-g D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Tsaining A lacense Examination F Administrative 5
G Oper.ational Error (Emplain)
Estohit 1 Same Souice (9/77)
Il Other (limplaini
. _ _ = _ _
s AVERAGE D AILY UNIT PObER LEVEL.
DOCKET NO. 80~O3 UNIT NOM 3.__
DATE - A-4-88 kd ba COMPLETED BY TELEPilONE 70 44 5-MW7 MONTil AN-k9 bI DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE D AILY POWER LEVEL IMWe-Neil g g w,.3,,,
3 O
17 O
2 is 3
19 4
20 5
21 6
7 23 3
24 9
25 10 26 11 27 12 gg 33 29 I4 30 f
/
IS 31 f
16 if 1
l INSTRUCTIONS On this format.tast the aserage daily unit power leselin MWe Net for each day in the reporting snonth. Compute to
~
j the nearest whole megawatt.
l I
(W77) i I
i
~
-w
, +..,,