Text
D DA/RYLAND hhkfCOOPERATIVE n.
- x. o
..,,w u
v.
, s:, w
. w w.:n February 3, 1981 In reply, please refer to LAC-7359 DOCKET NO. 50-409 U.
S.
Nuclear Regulatory Commission ATTN:
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Division of Operating Peactors Washington, D.
C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICFNSE NO. DPR-45 POST TMI REQUIREMENTS
Reference:
(1)
NRC Letter, Eisenhut to All Operating Reactors, dated October 31, 1980.
(2)
DPC Letter, Linder to Eisenhut, LAC-7296, dated December 31, 1980.
Gentlemen:
Your issuance of NUREG-0737 (Reference 1) summarized requirements for post Three Mile Island action items.
Our response (Reference 2) specified items where the dates outlined in NUREG-0737 could not be met.
Two items required additional time beyond that recuested in Reference 2 due to operational activities requiring staff time during the recent startup of the plant frem refueling.
Item Action Revised Date III.A.2.1 Submit revised r,adiological~
March 2, 1981 emergency response plan.
III.D.3.4 Review of Control Room March 16, 1981 habitability.
If there are any questions regarding this letter, please let us know.
r
~
e p
[5 Very truly yours,
'~
'1
'lE0
~,
DAIRYLAND POWER COOPERATIVE 8102180/Y
,C b'i AN
~
(2 Frank Linder, General Manager FL:JDP:af cc:
J. G.
Keppler,-Reg. Dir., NRC-DRO'III NRC Resident Inspectors