O SPECIAL REPORT NO 25 1977 Inservice Inspection No 5 Big Rock Point Plant TMInservice Inspection No 5 was condacted during the perf od July 27, 1977 t1Mough September 20, 1977 Inspections were conducsed in accordance with Sect, ion 9 0 of the Big Rock Point Technical Specifications and the rules of the ASME Boiler and Pressure Vessel Code,Section XI as follows:
Vessel Crack - The Item Examination Acceptance Reflector Evaluation Class 1 71W72 71W72 Th high Energy 71W72 71W72 RDS 74 Th Areas examined during this inspection included varicus components of the reactor pressure vessel, portions of the nuclear stea= supply system and portions of
-various support systems piping as itemized in Table 2.
The examinations were performed using ultrasonic (UT), radiographic (RT), liquid penetrant (PT) and visual (VT) techniques. The various examinations were con-ducted in accordance with Consumers Power Company Systems Protection and Labora-tory Services (SP&LS) or vendor (Southwest Research Institute-SvRI) approved procedures. Exa=inations were perfor=ed by inspection personnel qualified in the UDT process utilized in accordance with the requirements of Paragraph IS-203,Section XI of the 1971 ASME Boiler-and Pressure Vessel Code. Evaluation of in-spection data resulted in two veld repairs and various cosmetic grindings and stud and nut replacements. Instances of reportable indications are itemized in Table 1.
All records detailing procedures, personnel and equipment certifica-tions, examination data and disposition of reportable indications are on file at the Big Rock Point Plant.
diI(.
7/oAo40aT4
\\
TABL R1rAIJrtIN OF EFTOITANI l'S14I.TIOMS Item
- EulHir.etion
'.andition Reported Reportinr_ l'cchonism Disposition A dinsreotion Di smsition m e e. -ep
(,,
e, RPV F1ance Observation: Indleation on riance Plant DR: D-ISP-77-79 Oxid< deposits rermved from riance by NA RA inside seal Frcoves rout ine use of Ind lcr; no sirnificant dt yt a; inliention nonrelevant; accept as is R;gion Heat Exchanger VT: Indication Plant DR: D-DRP-77-85 Indleation is a tell tale hole for IIA NA A Weld A b CNF 4 ninitorinc interrity Non Region Heat Ex-VT Two goures; pits Plant DRs D-BR P-7~-93 orir inal installation surface defects.
VT Acceptable changer E Weld E-1 ChT 5 Remvc with cosmetic rrindinc; re-inspect (independently performed UT supported this disposition).
6-ECS-102-8 VT: Arc burns, external under-SP&l.S DR: D-RRS-080277-1 Crind out and reveld VT, RT,trr, Acceptable cut, incor.plete cover pass Hydro RT: Slag inclusions 10-FWS-201-22 CNF 2: VT: Icose bolt on 7PR Plant.DR: D-PJtP-77-80 Tirhtened VT - no record-
- 'N*
lo-TWS-?Ol-7-PR CNF 3: VT: Pit on weld 22 Cf.T 2 Crind to stress relieve and check able indicaticns CEF 3 minirman wall trr - ninir.urs wall satisfactory Ele-MRS-12140-NOO3A VT. Thread darsee to studs end Plant DR: D-DRP-77-113 Replace studs and nuts when missinc Hydro Acceptatle Ele 433-122-HO-NOO3B nuts SwRI Cre thread arca vnetrates to root or 5-MtS-13240-NOO2B UT: No indientions SwRI CNF 8 thrend. Retained studs and nuts if twR1 CIrr* ')
mis,ing thrend area was minor and tulting initerrite not impaired Hydro after replacer.cnt.
20-MRS-121-18PL UT: Indication at root or support Plant DR: D-DRP-77-Ill SwM/CP Co analysis-acceptatle; no NA NA attachment veld repair required.
NUTE: To te reinspected next re-ruclinr. outate.
17435-111 through VT: loose bolting; bent support SP&LS DR: D-RRS-082377-1 Retichted telts, replace bent rod, VT Accepta ic 113e-$16PR arsa reinspect NOTE: Additional examinatirns formed as required ly It:D-2fe30
. alt-ed in ti.-hteninc. muts on 17-135-111 3PR,17-tES-111 31 R,174!r.5-ll3-51'D, 4
11:4515-105-317 1.
Final condition considered alcertat Ic.
12-MSS-2Ol-9-PS-1 PT: Two linear indications Plant DR: D-BRP-77-gre Surface senle on wald with no appreciable depth. Plend with cosmetic crindtnc. Reinspect IT Acceptatte
.-.. _. ~
TI.BG RESOIUT1074 W M FOR7f.DM INDICATIWIS 4. dwinspection Disposition Itee "
- *Eht en - Condition Reported
@ rtinF I4 chantes Disposition.
er 7
(,,
n 2-RCS-106-1 PT: Two rounded intlications Plant DRs pnp-C81677-1 surface, proce; zinc defects. Remove Plant ER: E-PRP-77-41 with cosmetic crindinc, rainspect, check minienim wall.
Rein 2pection Cne indication acceptable. Other not acceptable; approaches miniuman wall. Appears to be pin hole.
Disnosition Grind out and reveld; reinspect PT, Vf, hydro Acceptable 4-RDC-101-VT Pressure seal bolts bent SwRI CffF 1 Replace bolts RA RA MO-7011 (hold pressure seal in place when no pressure is contained; not a pressure boundary funation).
O f
I e
Pale 1 TABLE 2 BIG FOCK TOth"r INSERVICE INSPECTION NO 5 de 8 i
- k
.s aofee 3c p**
Summary of Areas Examined and Results
"'"~7 ASME See XI ASME See II Exase component Ites No Cat Method (s).
Identification Examination Resdits Observation RFV Flange Reportable ItA1 cations - See Table 1 1.3 C
W RFV vessel-to-flance veld 8794-3 Acceptable 1.4 D
UT (Mech Nozzle-to-Shell Welds Main recirc 795-11A-11B added due to SwRI scan plan error-Acceptable; 795-11C, from lb in riser nozzle welds #795-11C, 11D - Acceptable I.D.)
- 795-11D 1.4 D
UT(Mech Nozzle Inside Radius Welds Main 795-11A, 11B omitted due tu SwRI scan plan error-Deferred; from rectre lh in riser nozzle inside rad 795-11C, 11D Acceptable I.D.)
- 795-11A, #795-11B, #795-11C,
- 795-11D 1.7 F
trt(Mech R W Nozzle Safe-End welds Acceptable from
- 795-11C,#795-11D I.D.)
1.3 I-1 Yr(fras BrY vessel cladding Patch #1, Acceptable ID)
Patch #?, Patc4,#3, Patch Ib 1.10 0-1 VT RPV closure head washers Acceptable 1.11 0-2 VT 10-in instrumentation nozzle Acceptable flange 807 6 studs anj nute 3.2 D
trr Emergener condenser nozzle-to*
Acceptable shell weld 101-S 31 3
VT,trr Cleanup regen. heat exchanger A A-4 Reportable Indications - See Table 1; A-1, A-2, A Acceptable circumferencial welds A-1. A-2, A-3, A f 3.2 D
VT,1Pr Cleanup regen. heat exchanger A Acceptable nozzle :=1ds A-5, A 6, A-7, A-8 I
e 3.6 N
VT,try Cleanup regen, heat exchanger A Acceptable vessel supports As.7, As-?A. AT-1 31 3
VT,ttr Cleanup regen, heat exchanger B Ae'eptable c
ciretan weld B-1 32 n
VT,ttr Cleanup regen. heat exchanger w Acceptable nozzle velds B-5, B 6, B-7, B-8
Pace 2 ADE: See II
- ASNWIec XE' Exam Component
,. J. 4 s
Item No NaC ~
Wthod(s)
Identifiestion Examinat194 9entta 3.6 H
VT,tfr Clennup regen. heat exchnnrer B Acceptable vessel supports BS-2, BS-PA,BT-1 3.6 H
VT,tTF Cleanup regen. heat exchanger D Acceptable vessel support Irr-1 31 B
VT,tlT Cleanup non-reren. heat exchant.cr Reportable Indications - See Table 1 E circum. weld E-1 31 B
VT,tfr Steam drum circue. weld Acceptable
- 101-1, 8101 la 32 D
trr Staam drum nozzle-to-shell weld, Acceptable manway A-1 3.2 D
UT Steam drum nozzle-to-shell welds Acceptable Steam outict: D-1 & D-2 Safety re11 eft F-1 F-2 & F-3 Decontaminating: H RPV vent: L Steam drum level: M-1 & M-3 33 F
VT,PP,tfr
' Steam drum nozzle-to-safe-ends Acceptable Nozzle C-1, C-4, B-1, B-2, 37 I-2 VT(remote)
Steam drum cladding - Potch 81 Acceptable 31 B
VT,trr Cleanup demineralizer tank circus.
Acceptable weld 203 32 D
trf Cleanup. ; mere 11:ing tank nozzle-to-Acceptable vessel welds 21b, 215 4.2 J-l VT,ttr 6-ECS-101: weld 5,6 & 13 Acceptable b.2 J-l VT,trr 6-E S-102: welda 8,9,10,11 Weld 8 - Reportable Indications See Table 1; Welds 9,10,11 Acceptable.
b.6 K-2 VT 6-ES-102: 7,PR Acceptable 4.6 K-2 VT 3-LPS-102: 13-PR, 21-PR-1, 21-PR-2 13-PR, 28-PIR, 34-PIR Acceptrble; 21-PR-1, 21-PR Deferred 28-PIR, 34-PIR 4.2 J-l VT,tfr 8-SCS-102: weld 4 Acceptable 4.6 K-2 VT 8-Scs-102: 8-PR Acceptable
AS8E See XI AS E See II Exam Corrponent Method (s)
Identi fication Examinattre Jesulta Ites No
.,. get, a
,e r'n ' -
4.2 J-1 VT,UT 6-SCS-102: welds 22 & 23 Acceptable h.1 F
VT,PF,UT 6-SCS-102: weld 21 Acceptable b.h G-2 VT 3-RCS-101: 55-BT, 71 Bf Acceptable 4.2 J-1 VT,UT 3-RCS-102: weld 36 Acceptable
%.8 J-1 VT,PT 2-RCS-106: weld 1,7,8,9 Weld 1 Reportsble Indications - See Table 1;* Welds 7,8,94cceptable 4.8 J-1 VT PT 2-RCS-107: 2&3 Acceptable
- t. 8 J-1 VT.PT 1.5-MSS-117: 9, 10 & 39 Acecptable b.4 G-2 VT 3-MSS-107: 5-BT, 6-DT Acceptable b.h G-2 VT 1.5-trS-117: 11-BT Acceptable K-2 VT 1h-PRS-102:
3-PR-1, PR-2,PR-3 Acceptable 4.6 3-PL-1 to 8 4.6 K-2 VT 14-MRS-103: 2-PR & 3-PR-1 3-PR-1 D-ferred; 2-PR Acceptable 4.6 K-2 VT 14-2 S-104: 2-PR Acceptable 4.6 K-2 VT 14-2 3-105: 2-PR & 3-PR-1,2-PL-Ito8 3-PR-1 Deferred; 2-PR, 2-PL-1 to 8 Acceptable 4.6 K-2 VT 17-HRS-111: 5-PR7 6-PR(
h.6 K-2 VT 17-MRS-112:
Reportable Indications - See Table 1 k.6 K-2 VT 17-MRS-113: 6-PR b.6 K-2 VT 17-MRS-11h: 5-PRj b.6 K-2 VT 24-MRS-121: 6-PR & 8-PR Acceptable b.6 K-2 VT 20-MRS-121: 13-PR, 18-PIJt, Acceptable 19-PR-1 & 19-PR-2 4.5 K-1 VT,UT 20-MRS-121 10-PL, 19-PL 18-PL Reportable Indications - See Table 1 19-PL' Acceptable 1
b.6 K-2 VT 2b-MRS-122: 6-PR Acceptable b.6 K-2 VT PO-MRS-122: 11-PR, 13-PR,
Acceptable 18-PLR,19-l'R-1 & 19-PR-2,19PL h.6 K-2 VT 5-MRS-132: 7-6R-1 & 7-PR-2 Acceptable h.6 K-2 VT h-MRS-lhl: 5-PR Acceptable
Pei e %
t Exen Component ApNy* 'II)
Method (s)_
Identification ASE See II Examinatikhsult) t Item No b.4 C-2 VT b-BDC-101: 14.Br Ac-eptable 57 K-2 VT Pump support 1-11 on Main Recirc Acceptable Pump $1 57 X-2 VT Pump support 2-11 on Main Recire Acceptable Pun:p #2 6.2 N-2 Valve bodies:
VT,PT 3->CS-107: RV-5001 & RV-5002 VT 3-RCS-102: CU b Acceptable 4-CSS-101: CSS-CK-1 lo-CSS-101: MO7061
)
le-RDC-101: MO7071 Reportable Indications - See Table 1 6.h G-1 VT,ttf 20- m S-121: 110-13001A-BT N001A, N001B - Acceptable 20-MRS-122: E N001B-DT 21 -MIS-121: % N003A BT N003A, N0038, Reportable Indications - See Table 1 6
24-MRS-122: MD-t:003D-DT 6.5 0-2 VT Yalve botting:
Acceptable 3-ME*,-107: RV-5000, RV-5001 &
RV-5002 is-CSS-101: CSS-CK-1-BT 1.5-RCS-110: CV-4092 BT &
CV-h093-M 2-RCS-101: CV h039-M-Top & Botton 2-RCS-10las CV te047-M-Top-& Botton CV 40h0 has top bolting only CV lOf0-DT-Top & Botton i 6 CV hill BT-Top & Botton 2-RCS-105:
i 2-CRD-101: RD-19-DT & CRD-CK-2-BT e
2-CRD-102: RD-20-DT 6.5 G-2 VT 5-MRS-131: % N002A-BT N002A - Acceptab3e 5-MIS-132: % N002B-BT NOO2B-Reportable Indications - See Table 1
I WV i
~
l AS E See II ASM 8ec II Exam Component Wthod(s)
Identifleation Examinattork Resialte Ites Iso
., Catg.,,,.
5 e' v,.
f '* ' "
- Reactor Depressurization System Piping Bh.5 3-J sc 12-BDS-101: velds 8,9,13 & 14 Acceptable Acceptable Bb.10 B-I-2 VT 12-RDS-101t 9-PR-1, 9-PR-2 &
13-PR 34.9 n-K-1 VT 12-BDS-101: 13-PL-1 thru h Acceptable Acceptable ab.h 3-G-2 VT 6-RDS-102: 3-BT IJs.h B-G-2 VT 6-RDS-105: b-st Accept. die Bh.1 B-F Pr 2-BDS-111: weld 8 Acceptable 2.1 B-F PT 1.5-RDS-113: weld 6 Acceptable
[
M.8 3-J IT 1 5-RDS-11b: welds 7,8,9 & 10 Acceptable Acceptable 36.3 3-c-2 VT Valve t>olting:
6-RDS-102: SV 'e984-BT 6-RDS-103: SV h985-Br High Energy Piping C2.ls C-C PT 12-MSS-201: 1-PS-1, 9-PS-1 1-PS-1 Acceptable; 9-PS-1 Reportable Indications - See Table 1 C2.6 C-E t'r 12-MSS-201: 1-PSS-1, 9-PSS-1 Acceptable C2.5 C-D et h-MSS-2ct: 8-BT (10% or 2 min) 8-aT Deterred C2.h C-C PT 10-FWS-201: 7-PL-1 thru h.
Acceptable 36-PS-1, 36-PS-2 C2.6 C-E VT 10-FWS-201: 7-PR, 27-PR, 7-PR Reportable Indications' - See Table 1 36-PSS-1, 36-PSS-2 27-PR, 36-PSS-1 Acceptable 36-PSS-2 part or 36-PSS-1 C2.1 C-F UT 10-FWS-201: welds 17 & 18 Acceptable C2.1 C-F VT pit,UT weld 10-FWS-201: Pit adjacent to weld 22 Reportable Indications - See Table 1 C2.5 C-D PT le-FWS-201: 32-BT (10% or 2 min)
Deterred m
.