Responds to NRC Re IE Insp Rept 50-328/80-22. Corrective Actions:Repair Procedures Started for Unacceptable Welds on RCPB Piping
ML20003A513
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/26/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8102040183
Download: ML20003A513 (2)


Text

.

~

. _ L E' 400 Chestnut Street Tower II January 26, 1981

\\

Mr. James R. O'Reilly, Director Office of I pection and Enforcement U.S. Nuclear egulatory Commission Region II - Su e 3100 101 Marietta St et Atlanta, Georgia 0303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - NRC-OIE INSPECTION REPORT 50-328/80 RESPONSE TO VIOLATION 328/80-22-01 The subject letter dated January 2,1981, cited TVA with a Severity Level V Violation in accordance with 10 CFR 2.201.

Enclosed is our response.

If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AITfHORITY L. H. Mills, Manager Nuclear Regulation and Safety Swrn to ar.d subscribed before me Y5 day of W 1981 this c._

l

?,b _ i s, _h'i l.

t l

Notary Public d,j My Conssission Expires N/ T2 Enclosure Mr.VictorStallo, Director (Enclosure)[

cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Consission Washington, DC 20555 Bo/1 s

!/

/

8102040iBS Q

~

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 NRC INSPECTION REPORT 328/80-22 RESPONSE TO SEVERITY LEVEL V VIOLATION 328/80-22-01 Severity Level V Violation 328/80-22-01 10CFR50.55(a), paragraph (d), as implemented by TVA's FSAR, Table 3.2-4, requires in part,

... piping which is part of the reactor coolant pressure boundary shall meet the requirements set forth in.

.. the Class I section of the USA Standard Code for Pressure Piping (USAS B31.7)..." Paragraph 1-727.4.2(c) of B31.7 states, "When components of different outside diameters are welded together, there shall be a gradual transition between the two surfaces." In addition, paragraph 1-727.4.2(d) states, "The finished surface of the weld shall merge smoothly into the component surface."

Contrary to the above, several reactor coolant pressure boundary piping welds do not blend smoothly into the adjacent valve nozzle.

Admission or Denial of Violation The unacceptable welding, as described in the subject inspection report, occurred as stated.

Reason for Violation The subject violation occurred as a result of the failure to comply with the Class I section of the USA Standard Code for Pressure Piping, i

paragraph 1-727.4.2(c) of B31.7.

Corrective Steps Which Have Been Taken and Results Achieved Repair procedures have been initiated for the unacceptable welds (2RX 00064, 00065, 00057, 00058).

Corrective Steps Which Have Been Taken to Avoid Further Noncompliance All welding inspectors have been reinstructed in the requirements pertaining to transition welds blending smoothly into adjacent base metal with a 3-to-1 taper. An additional sampling of similar valve-to-pipe transition welds will be conducted to determine if there are other welds that do not have the required 3-to-1 transition, and any that are found to be unacceptable will be repaired..

Date When Full Compliance Will Be Achieved Reinstruction for the welding inspectors has been completed, and all required weld repair will be completed by April 1, 1981.