ML20003A381

From kanterella
Jump to navigation Jump to search
Forwards LER 81-005/03L-0
Date released: 01/17/2020 Download: ML20003A381


LER 81-005/03L-0:on 810106,greater than 12-step Disagreement Noted Between Individual Rod Position for Rod B08 in Control Bank D & Group Demand Position.Caused by Voltage Drift in Signal Conditioning Card.Indicator Channel Recalibr
ML20003A386
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/28/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003A386 (2)
Forwards LER 81-005/03L-0
ML20003A380
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/28/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003A380 (1)