ML20003A270

From kanterella
Jump to navigation Jump to search
Summary of 730901 & 02 Site Visit to Review Radiological Environ Monitoring Program,Radiological Measurements & Calculational Techniques
ML20003A270
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/11/1973
From: Parsont M
US ATOMIC ENERGY COMMISSION (AEC)
To: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8102030336
Download: ML20003A270 (1)


Text

-

DISTRIBUTION:

Rdg.

L-Rdg.

L-RAB nci 11 1973

} j'((

$.t Harold R. Denton, Assistant Dirwetor for Site Safety, L 4y THRU: Jacob Kastner, Chief, Radiological Assessant Branch, L SITE VISIT TO BIG ROCK POINT NUCLEAR PLANT On Septeser 1 and 2,1973, a site visit was made to. the Big Rock Point (BRP) Nuclear Plant at which time the radiological envimnanntal monitoring program was nytewed and radiological measuremnts and calculational techniques were discussed. The visit is described below in are detail.

Septeder 1: A meeting was held at BRP with AE0 (M. Parsont and E. Markee) and Consumers Power (R. Sindennan and others) representatives. The radiochemistry and counting labs and the meteorological tower location were visited, some plant effluent and quality control data were reviewed, a general discussion was held concerning the radiological environmental mnitoring program and AEC and BRP radiological dose calculations.

Septeder 2: A tour was ande of the offsite environmental sampling locations. Discussions were h41d regarding new technical specifications to be submitted by the applicant.

Michael A. Parsont Radiological Assessment Branch Directorate of Licensing cc:

J. Hendrie A. Giambusso D. Grahn D. N11er B. J. Yomgblood D. Nelson E. Kirkee 4+ cal FDR:r'~

AEC-PDR ACRS(10) s 1

Wl6R0303%

(1.

b omer >..L.t M..

..Lt.... ~

7278

~i sumur >

..MParsont.;pt... JKAS. 'tler om.

.10/....U3..

...10//9./73 r

4rc-neinn.s.3n 4rcx ouo

.-i.-.i.

m.

i