Forwards Response to NRC Questions Re Amend of OL DPR-69. Fuel Rod Shoulder Gap Clearances Reviewed as Part of Preparation for Each Reload Core
ML20003A266
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/30/1981
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8102030291
Download: ML20003A266 (4)


Text

-.

B ALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 147 5 B ALTIMORE. M ARYLAN D 21203 Am.v. c. tu ove.sa.

January 30, 1981 v.a........,

u~

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ATTENTION:

Mr. R. A. Clark, Chief Operating Reactors Branch #3 Division of Licensing

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 2, Docket No. 50-318 Amendment to Operating License DPR-69 Fourth Cycle License Application Responses to NRC Staff Questions Gentlemen:

Enclosed are our responses to questions posed by NRC staff on the subject application.

Very truly yours, BALTIMORE GAS A E

RIC COMPANY e l=!L A. E. L, d9all, Jr.

Vice President - Supply AEL/W3L/mit Copy To:

3. A. Biddison, Esquire (w/out Encl.)

G. F. Trowbridge, Esquire (w/out Encl.)

Messrs.

E. L. Conner, Jr., NRC P. W. Kruse, CE c.

f V

[

sym*

W 1

81 x

op11.

/

l

i l

ENCLOSURE QUESTION 1 Differential growth between fuel rods and the fuel assembly structure is burnup dependent and progresses in such a manner that mechanical interference will occur when the shoulder gap is consumed. Based on preliminary information, we estimate that Cycle 4 operation will involve extended burnups far beyond typical EOL exposures. Using approximate analytical methods, we have been unable to demonstrate that adequate shoulder gap clearance exists for these higher burnups.

What assurance exists that the shoulder gap in the high-burnup f-".1 assemblies comprising the Cycle 4 core is adequate to preclude mterference?

RESPONSE

Fuel rod shoulder gap clearances are reviewed as part of the preparation for each reload core. Clearance must be demonstrated for each fuel type included in the core. For the lead burnup fuel type in Cycle 4 (Batch D), the dimensional change correlations presented in CENPD-195 have been utilized. An EOC4 analysis of the lead exposure case has shown that no interference is predicted at a confidence level exceeding 95% Since Batch E aid Batch F fuel will have lower EOC 4 exposures, it has been concluded that all fuel types will have clearance at end of cycle.

l I

l

QUESTION 2 What guide tube and sleeve designs will be employed in Cycir to mitigate or investigate guide tube wear? Please provide a description for the Cycle 4 core inventory ti.4t identifies different fuel assembly designs. Indicate (a) the number of fuel assemblies in each category-sleeved, sleeve design, guide tube design, (b) the number of fuel assemblies in each category to reside under single and dual CEAs, and (c) previous svear or damage along with a statement as to why such wear or damage is acceptable.

RESPONSE

II Fuel Assembly Category:

Standard with Sleeves )

Tota 1 Number in Cycle 4:

217 Number Under CEAs:

77 (1)

The " standard" guide tui;e design is described in CEN-138(B)-P. The guide tube

' sleeves are described in CEN-83(B)-P.

I l

i l

l l

QUESTION 3 Please provide the following burnup values:

a. The core average exposure increment achieved during Cycle 3.
b. Each batch average exposure for EOC3.
c. Each batch average exposure for EOC4.

RESPONSE

The actual core average exposure increment achieved during Cycle 3 is 11,153 a.

MWD /T. Since this value exceeds the EOC3 exposure window of 10,000 to 11,000 MWD /T pecified in the Calvert Cliffs II Cycle 4 license submittal, modifications to the Calvert Cliffs II Cycle 4 license submittal to extend the EOC3 exposure window to 11,200 MWD /T are being provided tmder separate cover.

b.

Batch average exposure for EOC3 based on a Cycle 3 length of 11,200 MWD /T.

Batch Exposure B

34,800 MWD /T C

34,200 D

22,200 E

10,400 Batch aserage exposure for EOC4 based on a Cycle 4 length of 17,300 MWD /T:

c.

Batch Exposure D

36,900 MWD /T E

28,100 l

l F

17,700 t

-