ML20003A235

From kanterella
Jump to navigation Jump to search
Forwards Revised Requests for Relief from ASME Section XI Inservice Pump & Valve Testing Program & Sys Pressure Testing Program for Facilities
ML20003A235
Person / Time
Site: Browns Ferry  
Issue date: 01/23/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8102030139
Download: ML20003A235 (6)


Text

._

e TENNESSEE VALLEY AUTHORITY C

CH AT T ANOOG A, TENN ESSCC 37401 s'

1800 Chestnut Street Tower II

~

. c; January 23. 1981 7,

Director of Licensing Attention:

Mr. Thomas A. Ippolito, Chief l

Operating Reactors Branch No. 2 i

U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Ippolito:

In the Matter of the

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 Enclosed for your review are revised requests for relief from ASME Section XI inservice pump and valve testing program and system pressure testing program for Browns Ferry Nuclear Plant units 1, 2, and 3 1

Very truly yours, TENNESSEE VALLEY AUTHORITY ?/ L. M. Hills, Manager Nuclear Regulation and Safety Subscr d sworn y before me - day of U27m, 1981. this. u. V f flith h.Y /bb Notary Publio 0 f). ~ / ' e-My Commission Expires Enclosure T10203g) An Equai oppor tunity emp;cyer

FNFLOSt!PE Br na Ferry Nucinar Plant (Docket Nos. 50-250, -260, '06) Revised Raq' Jests for Relief from AS"2 Section XI Attached are revised recuests for relief for the subject Brovns Ferry Nuclear Plant testing programs. The revisions are as follows: Punn and Valve Testinc Procese 1. Withdraw Request for Relier PV-1 for units 1, 2, and 3. Systen Prassure Testine Procran 1. Withdraw Foquest for Relier H-1 for units 1, 2, and 3. 2. Revised Raquant for Relief H-10 for units 1, 2, and 3 as shown on attachment. 3 Withdraw Raquest for Relief H-11 for units 1 and 2 (unit 3 previousiv withdrawn). 0 *

  • lD
  • lD 03d h m

M UJ u l lrd o

o REOUEST FOR RELIEF PV-1 Request for Relief PV-1 has been withdr$vn.

  • O 4.

e. a 6 h + 0 s t l I I I h l i I t I i' b I ( i i r ? I 4 I j E L i b I I r f e.o A wp4 1 --v ye. ,,~e+-w-y-,,,,.--.~%gre--.---,..m-wy . +, - -w-v---',- ,,,,w..wer.,w-v--,,,,,,,,:4-,-, eye..,w w,r r- .m,,,.r....--,m---,-..,,w,-. ,-,-,.c.**,

= ..g i \\ \\ J t REQUEST FOR REl.IEF 11-1 l Request for Relief 11-1 has been withdrawn, b l t 1 I t I i t l I f l i i t ? .. - 21. _.. ' ...... - ~, _7 1 l l i j f i e f l I i l 4 s I i, ^ i

~_ e I REOUEST FOR RELIEF 11-10 System: All systems Class: 1, 2, and 3 l Test Requirement: Pressure tests following repair to components in j . accordance with IWA-4210. Basis for Relief: Performance of a pressure test af ter minor repairs by welding is unnecessary. An increase in the level of safety of the component is not realized. Other nondestructive tests (PT, UT, etc.), if applicable, shall be employed in a case-by-case basis in accordance i with documented TVA repair procedures which are j maintained by a QA program in accordance with _m IWA-4100 (b). In addition, 10 CFR, Part 50, 50.55a has been revised to incorporate by reference the 1977 edition, summer 1978 Addenda of Section XI. This addenda permits exemption from pressure testing following certain repairs by welding. Alternate Teating: The guidelines set forth in IWA-4409 of the 1977 edition, summer 1978 Addenda of Section XI, shall be followed. Components which require repairs as a result of a pressure test shall be pressure-tested j following the repairs. l 4 l W J 1 J. .aw.. ,s'. m

2 9, .,p 4 REQUEST FOR RELIEF H-11 Request for Relief 11-11 has been withdrawn. N e b ~, m . -+ w as y ga gg44tume8edee %sh eJ @'-W l l i o { I s .~. 4. s ,.}}