Submits Final Response to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Manufacturers Did Not Utilize Specified Valve Parts Castings
ML20002E510
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/13/1981
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-21, NUDOCS 8101280379
Download: ML20002E510 (1)


Text

,

a L

Wisconsin Electnc ecuen couparr 231 W MICHIGAN. P.O. BOX 2046. MILWAUKEE, WI 53201 January 13, 1981

'I &

c h' Mr.

J.

G.

Keppler, Regional Director vfo Office of Inspection and Enforcement,

('

((

h Region III p

\\3 U.

S. NUCLEAR REGULATORY COMMISSION il4/j 7 h

I 70Sf g Z 799 Roosevelt Road v.s. glJgu Glen Ellyn, Illinois 60137 co.

f z;

Dear Mr. Keppler:

.'MIQ p

/

DOCKET IMS. 50-266 AND 50-301 RESPONSE TO IE BULLETIN NO. 80-21 POINT BEACH NUCLCAR PLANT, UNITS 1 AND 2 As discussed in our initial bulletin response dated

,ecember 4, 1980, we have contacted and received responses from the eighteen manufacturers we identified as having supplied active valves in safety-related systems at the Point Beach Nuclear Plant.

In all cases the manufacturers were able to notify Wisconsin Electric Power Company that they had either never purchased any valve part castings from Malcolm Foundry Company, Inc. or had supplied no valves for the Point Beach Nuclear Plant with valve parts manufactured by Malcolm Foundry Company, Inc.

Accordingly, we have identified no active valves in safety-related systems having potentially faulty material and consider our response to the subject bulletin completed.

Very truly yours, m

o Executive Vice President Sol Burstein Copics to NRC Resident Inspector NRC Office of Inspection and Enforcement, Division of Reactor Construction Inspection N

~'

Q PJAN 14 1981