ML20002E141

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Plans to Upgrade Reactor Protection Sys Power Supply.Design Providing for Redundant Class IE Protection Is Being Developed.Info Re Design, Proposed Tech Specs & Reload 4 Will Be Submitted in 90 Days
ML20002E141
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/19/1981
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JPN-81-8, NUDOCS 8101260504
Download: ML20002E141 (1)


Text

POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMaus CIRCLE NEW YORK. N. Y. too19 (212) 397 6200 GEOR,G,E 7,.gERRY orgnaTINe orrtCan TRUSTEES JOHN W. BCSTON JOHN S.OYSON Ng,f,TW sN 4 RECTom CmasmuaN oEoRoE t.iNoauts JOSEPH R. SCHulEDER WICE CNAIRMAN g

a;,";;'4""'ar R CwmRo u. ruvnN LER og,.,s m Ct4 R,,,,,,,,

Ro.ERri. miu.own FREDERICK Jt. CLARK January 19, 1981

,*,"' 'A" "'"*

JPN-81-8 ysoua M.rREy Director of Nuclear Reactor Regulation l',"L*"n'

  • g',*,',",' "'

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Thomas A.

Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Reactor Protection System Power Supply

Reference:

Letter, T.A.

Ippolito (NRC) to G.T. Berry dated September 24, 1980

Dear Sir:

In response to your referenced letter, the Authority plans to upgrade the Reactor Protection System Power Supply.

The Authority staff is developing a design to provide redundant class IE Protection at the interface of the non-class IE motor generator sets power supplies and the Reactor Protection System, based on the General Electric conc ptual design as applicable to the J. A. FitzPatrick plan.

The Authority intends to submit design information within 90 days from the date of this letter and also submit proposed technical specifications along with Reload 4 information.

The Authority presently plans to instala these modifications during the 1981 refueling outage contingent upon approval of the design by the Commission staff prior to implementation and upon timely delivery of equipment.

very truly yours, 0

.P.

yN Senior Vice Presidene.

l Nuclear Generation D

{1 l

81 01260604 9