Responds to NRC Re Violations Noted in IE Insp Rept 50-155/76-01.Corrective Actions:Fire Protection Sprinkler Header Occurrence AO-26-75 Corrective Action Adequate & Const Activities Being Performed
ML20002D721
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/05/1976
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20002D720 List:
References
NUDOCS 8101220229
Download: ML20002D721 (2)


Text

_.

n.

f

- Or

. - - ~...

... a i

^ 's i.

sd...s 6 (L s J ;

Genere# Off6ces: 212 West M.crugen Avenue, Jace%n. W.cqen 4920e. Area Cc Je 517 798 OSSu March 5, 1976 Mr James G. Keppler US Nuclear Regulatory Com=ission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155, LICE *iSE DPR-6 BIG ROCK POINT PLA:iT

his letter is written to respond to the item of apparent nonceepliance Adentified in IE Inspection Report 050-155/76-01. trans itted by'your letter.

dated February 13, 1976.

Your letter stated that corrective action with respect to Infraction 1 had, been completed in a ti=ely canner and that you had no ftether questions at this time. Additional response was requested with respect to Infraction 2.

This infraction was:

"2.

Contrary to 10 CG 50.59, safety evaluations were not con-ducted as required prior to performing construction activities relative to the following plant modifications involving safety-related equi;=ent.

The fire protection system sprinkler header was modified a.

on October 2h,1975, without prior review and documented l

safety evaluation.

(Paragraph 1.e, Report Details II) b.

Construction activity on Dece=ber 19, 1975, ' concerning excavation between the turbine building and.the contain-ment building resulted in damag e to the turbine building ventilation exhaust line while the reactor was operating.

No reviev snd documented safe',y evaluation was perfor=ed preceding this activity.

(Peragraph 1.f Report Details II)"

( The occurrence associated with the fire ;rotection sprinkler header was reported as A0-26-75 transmitted by letter dated November 2h,1975

  • de believe that the corrective action specified for this occurrence, which is the same as that specified in A0-2h-75 is adequate corrective action.

7/g/2A#AAfe occurrence associated with excavation between the turbine building and the containment building was reported as A0-30-75 transmitted by our letter-

2 4

t effort was being expended at the time when the occurrence took place. Based on the analysis of the cause of Ao-30-75, two r.dditional engineers at the f ant have been assigned to review the extensive construction activities dur-l ing the present outage on a. continuing basis and. perform the reqaired safety evaluations per 10 CFR 50 59 We feel that our interim effort in reviewing

. all propased, faci'Aity chseges cno work packages associated with major facility changes as co==itted 'in response to A0-2k -75 and expanded following A0-30 is adequate.

The four similar occurrences are of concern to Consu=ers Power Co=pany. We note, however, there vere,very subtle differer.ces in each of these occurrences and believe that we have developed at least interi= procedures which vill pre-clude'their recurrence in the future. Further, verk is being done in the General Office in an atte=pt to better define the problems and their per=anent solutions such that less cu=bers0=e per=anent procedc es may be i=ple=ented.

... v. j Ralph 3. Sewell Nuclear Licensing Ad=inistrator

~