Forwards Util to State of PA Requesting Waiver from Permit Requirements of Dam Safety Encroachment Act
ML20002D578
Person / Time
Site: Crane  
Issue date: 01/13/1981
From: Hukill H
Metropolitan Edison Co
To: Reid R
Office of Nuclear Reactor Regulation
References
L1L-005, L1L-5, NUDOCS 8101210379
Download: ML20002D578 (6)


Text

.

Metropolitan Edison Company M

Post Office Box 480 Middletown, Pennsylvania 17057 717 9444041 Wnter's Direct Dial Number January 13, 1981 LlL 005 Office of Nuclear Reactor Regulation Attn:

R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Units 1 and 2 (D1I-1 and TMI-2)

Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 Permit Modifications Enclosed for your information is a request for waiver from permit requirements of Section $(c) of the Dam Safety Encroachment Act of October 23, 1979 per Environmental Technical Specification 5.7.2 (Unit 2).

Sincerely,

/

/

kill D

Director, TMI-l HDH:LWH: hah Enclosure cc:

B. H. Grier B. J. Snyder L. Barrett

(

D. DiIanni H. Silver 1

i 0

v >

t I

i 810121 o7 74treml: tan Ed: son Company is a Member of the General Puchc Utikt:es Sys:em i

~

Metropolitan Edison Company wg j (g ff y-)

g Post Office Box 480

(,, ' - ' ir ae Middletown, Pennsylvania 17057 717 9444 041 Wnter's oirect Dial Numoer December 31, 1980 TL1 698 Mr. Joseph Ellam Division of Dam Safety Pennsylvania Department of Environmental Resources P.O. Box 2357 Harrisburg, Pa.

17120

Dear Mr. Ellam:

Three Mile Island Nuclear Station (TN2)

Detailed below is the infor=ation necessary to qualify all TMI " ponds" for a waiver from the permit requirements of Section 6(c) of the Dam Safety Encroachmeno Act of October 23, 1979.

ACRE POND FEET HAZARD POTENTIAL 1.

Pre-operational settling basin A 8.4 3

2.

Pre-operational settling basin B 8.7 3

3.

Dredging settling basin 6.8 3

4.

Unit I Cooling Tower desilting basin 3.1 3

5.

Unit 2 Cooling Tower desilting basin 3.1 3

6.

Site (Stormwater) Runoff desilting basin 3.3 3

In all instances, construction began prior to July 1, 1979.

All of the above " ponds" ;re located on Three Mile Island.

Three Mile Island is tocated in the Middletown Quadrangle of the U.S.G.S.

Map System.

A po*'. on of the Middletown quadrangle is enclosed and the approximate 1;;4tions of the ponds are annotated thereon.

In addition, a diagram which was submitted to PaDER as a part of our NPDES permit application is also enclosed.

This diagram further details locations of these ponds (as well as other items).

The following is a brief description of the ponds:

1.

Ponds 1 and 2 (Pre-coerational settling basins)

These basins were used at the time of plant construction.

Currently, they are j ust being drained, as necessary, in order to remove accumulated Metrocontan Ecson Comcany is e Memter of the Genera: Suche utsties System

J. E11gc TLL 698

-1 rainwater. All such discharges are cade in accordance with the provisions of our NPDES permit which is administered by the PaDER.

2.

Pend 3 (Dred:ine settline basin)

As periodic dredging is perforned, accumulated solids are retained within this basin.

Dredging operatiocs are conducted in accordance with the provisions of our AC0E and PaDER permits.

3.

Ponds 4 and 3 (Unit 1 and 2 Coolin: Tower des 11 ting basins)

These basins are used infrequently during cleaning operations. Cleaning is conducted in accordance with PaDER requirements.

4.

Fond 6 (site (Stor= water) Runoff desiltine basin)

This area allows rainfall runoff fro = the TM1 plant site to " settle" (in order to minimize the solids concentration of the runoff) prior to entering the Susquehanna River. This discharge is in accordance with our NPDES Per=it.

All the ponds referenced in this submittal are located on Three Mile Island and comply with the exemption detailed in section 105.12(a)4 of the regulations regarding the National Wild and Scenic Rivers Act and the Pennsylvania Scenic Rivers Act.

In addition to the six " ponds" detailed herein, the plant site is surrounded by a dike and the shoreline surrounding the plant site is rip-rapped with stone.

Both of these measures were pe* formed in order to meet Nuclear Regulatory Commission requirements (for Good protection).

In accordance with section 105.12(b)4 of the regulations, these items are exempt from these regulations.

TMI has a number of small containment structures which were installed to comply with SPCC regulations (spill prevention). These structures are essentially limited to curbing and walls surrounding our oil tanks. These SPCC structures are also exempt from these regulations.

Per section 105.12(b)6 of the regulations, the TMI intake structures and discharge outfalls (which are all detailed in our NPDES permit application on file with PaDER) are exempt from these regulations.

Should you require any additional information, please contact Mr. Eric Nielsen of our Licensing staff at (717) 948-8562.

Sincerely, qf I

/Hw D. Hikill i

Director, TMI-l l

\\

HDH:ESN: hah l

i j

Enclos*tres

bec:

J. J. Parton-TMI-2 Admin. Bldg.

_,.a4 1-..-4

-, vac

,o.

G. K. novey-TMI-2 Ad=in. Bldg.

b'. E. Riethle-Env. Assesso. Hbg. Airport T. E. Tipton-JCP&L R. Lacey - JCP&L D. G. Mitchell-Trl. 68 R. J. Toole-Unit 1 Service Bldg.

M. Roche-JCP&L O

l l

v

  • [.

Enclosura 1 c..

-i

~

. /

TLL 698

  • ~1

/.

DC: a*

.s a :

j.

r

~

^

e s.. si - ! ) To,.

  • LA-E

..~

' ~ -

-j. -

...s

._ ~ ::

- 4,,...7 4 & -

,. */

n=.

,,a-8" a i *

  • lsia n:

I s

~

w

- '. I s_ a n c

,I M

Z.

i

/

?*

'2' r.

r.,o

.\\

t

, d**

[ ;...'M'..k g"

m

.e?

~d

-. s:.

g%..

m y"* ; '

.s s.nry.,

k.

PONDS

  • n Kont t 1.

Pre-op Basin A Goosenorn i.-

.J

, 2.

Pre-op Basin B

.%.s ^ '

.e e

g i 2,- :

-l

.F 3

3.

Dredging Basin s

.n

u..

I 4.

Unit 1 Cooling Towe

/.

.,A..n.. s.i t

t '

Basin

' g' d.

t.s.---

. mm 5.

Unit 2 Cooling Towe tk.

. j.i'i

( "~

Basin l

t atr' 6.

Stor= water Basin 8

l,.j.

i i o ;,-

  • f y

I E

Goldsboro S h e!I e y /

s 8

E."

Etters PO)

V:re g

~

.I s l a n d

~.:.,

. 3. i t

o.

~

\\

  1. 2s:

C2.-

y*l i

5 :

aw s s

~

z nry

-)

s*

t.

, i en r-a,.

.;.s

~

~ #s.

'\\, a.'.

ed C '/ < - ^

E

, :. Island s

f*,y 3,, v

=

si G, f.,. 4..%. i.. -.-

k,t 1

5 :

R2 i.

i.

,, i -

.9{

3

\\ \\ i,'

r.

xk-

-u g\\

+

-i-y g

s.

T

-i c

.,N c.\\

g..,.,A -<

2 and g

v r,,

q~.

a N

g' p,

c MIDDLETOWN. P A.

\\

c::::' 121 j.t \\

y N u 4 Vl.O.I*0 m..

  • OJ. a-8 ANC' E g

d' -

t..: Z.5 - v.7 17 i C::::3

.a z,

r

\\.-(

o,:

NOManAL *00L CLtve TION 2TT

.~~,,.'.f 1Y3 O

.$. \\

l./

r

  • e 7

.jp

,/,/

Af/E 554'M 5 5 5EEE55'83;

i. (

o

.\\

-s l:

  • e t

\\

^

" Z..,. pr

@5)..s x.sas)

  • s s

s -

a mou gh

,.=.Q

,??..

/

1. e-

--.s-

/, 4,- e s\\

..\\

C6 7t e tcarjo Falli

.4. p,....,rh.,Nl.Q l

\\; u s--..

- es n:

ns 22%;: T C E-

' :s a,% s e

L.Mi editec ant. ouelisne: by the Geclogi:a! w,vey arc?
73. :.I O Enclosura 2 m

m

D 3

TLL 698 m

y. -..

w e

jj

..r..-...

13 15-

\\

s,

.e--

7.

b h.

--s N'S 7

a C3 <.

i i

.' 5 ces:.,c cr. sin, 1-C 13 m,

4.

-s g ik (Unit 2 desilt basin';

12 Q 21 l

1 S + 15 4 4

Q -2 + 9 10 + 11 C 1

-o

.,ac

, ;a g Ce.

.A b

x t'

^

1 6

26

'2h j 23 k

22 27 5

'~ne 27 discharges listed on Page I-3, Iten 9, 'are located in the above approximate positions on '".VI.

The nunbers are listed sequentia"y to correspond with Ite: 9

~1 9.a.

Outra11 001

13. 9.h.5. Pre-Op settling basins
2. 9.b.

Sevage Treatnent Plant ik. 9.h.6. Stor= vater Transport Systen/

3 9.c.

Outfall 005 desilting basins

k. 9.c.

Unit i Screen House are 15 9.h.7 Dredging settling basin a runoff drain

16. 9.h.8. Intake Screen Houses 5

9.e.

Unit 2 Screen House are

17. 9.1.

Unit 1 NDCT a runoff drain

18. 9 1.,

Unit 1 EDCT

6. 9.c.

Arer..~.:noff drain south 19 9.i.'

Unit 1 MDOT of outfall 001

20. 9.i.

Unit 2 NDCT

7. 9.c.

Area runoff drain south

21. 9.i.

Unit 2 NDCT of outfall 005 22 9.1.

Unit 2 MDOT

8. 9.e.

Dredging settling basin 23 9.k.1. Outfall 002 9

9.h.1. Sevage Treatment Plant

24. 9.k.2. Outfall 003 10 9.h.2. Industrial Waste Filter
25. 9.k.3. Outfall 00h Systec
26. 9.k.

Unit 1 Intake Screen Discharge

11. 9.h.3. Industrial Vaste Treatment 27 9.k.

Unit 2 Intake Screen Discharge System

12. 9.h.h. Radioactive Waste Treatment System kcation Map Ponds See No.

l.. Pre-op Basin A 13 August 6, 19T9 2.

Pre-op Basin B 13 Metropolitan Edison Co=pary 3.

Dredging Basin 8

4.

Unit 1 Cooling Tower Basin 14 5.

Unit 2 Cooling Tower Basin 14 4

Stormwater Basin 14