ML20002D499
| ML20002D499 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/26/1980 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-23, NUDOCS 8101210210 | |
| Download: ML20002D499 (1) | |
Text
7:!e-PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET i
P.O. BOX 8699 PHILADELPHIA. PA.19101 DEC 261980 JOHN S. KEMPER vicentstorny Ensessaa nesse aseo massanCM Mr. Boyce H. Grier, Director, Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
NRC Region I Letter Dated November 14, 1980 RE: IE Bulletin 80-23
" Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation" Limerick Generating Station Units 1 and 2 Docket Nos. 50-352, 50-353 File: GOVT 1-1 (IE Bulletin)
Dear Mr. Grier:
Philadelphia Electric Company has reviewed IE Bulletin 80-23,
" Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation" submitted with the subject letter received on November 18, 1980.
We have determined that there are no Valcor Engineering Corporation
, Solenoid Valves of the type described in IE Bulletin 80-23 used or planned for use in any safety-related function in balance-of-plant systems at Limerick Generating 6tation Units 1 and 2.
General Electric Company has not completed their review of the NSSS systems. Therefore, our response to the NSSS system applications will be delayed. We expect to transmit this response by 2/28/81. An expenditure of 40 MH has been expended to date in reviewing and preparing this report.
Sincerely, NS NY Copy to: Director, Division of Resident and Regional Reactor Inspection Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 J. P. Durr NRC Resident Inspector, LCS 810 J ~, i og/O
~