ML20002D294
| ML20002D294 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/07/1981 |
| From: | Harran G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20002D293 | List: |
| References | |
| NUDOCS 8101200277 | |
| Download: ML20002D294 (6) | |
Text
.
i.
I g'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-245 UNIT Millstone -l 00107 l,
DATE COMPLETED BY G. Harran 6
20V447-1792 TELEP110NE ext. 655 MON 11I December DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-Net)
(MWe-Net)
I 0
37 o-2 0
18 0
3 0
0 39 4
0 20 0
5 0
21' 0
6 0
0 22 0
0 7
23 8
0 24 0
0 0
25 10 0
26 0
11 0
27 0'
12 0
0 28 13 0
29 0
14, 0
3o 0
is 0
0 3,
16 0
INSTRUC110NS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawait.
OII')
8101200AY7 e+
e
o
~
OPERATING DATA REPORT DOCKET NO. 50-245 DATE 80010/
l COMPLETED fly
'G.
Var _ rag 1ELEP110NE 203/447-[792 OPFRATING ST ATUS fiillstone Unit'l Notes
- 1. Unit Name:
December 1980
- 2. Reporting Period:
- 3. Licensed Thennal Power (MW ): 2011 662
~
- 4. Nameplate Rating (Gross MWe):
660 S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
6R4
- 7. Maximum Dependable Capacity (Net MWe):
654
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since bst Report.Gise Reasons:
N/A N/A
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions. lf Any:
N/A N/A N/A
' This Month Yr.-to Date Cumulative
- 11. Ilours in Reporting Perioj 744 8784
' ' 88464
- 12. Number Ofifours Reactc r Was Critical 0
6074.3 66459.3
- 13. Reactor Resene Shutdou n Ilours 0
592.3 1527.T
- 14. Ilours Generator 0n Line 0
- 15. Unit Resene Shutdown liours 0
6030.3 64126_,2_,
26.5 26.5_
- 16. Gross Thermal Energy Generated (MWil) 0 10382182 114430127
- 18. Net Electrical Energy Ger crated (MWil) 0(-2324) _
3564500 38795896
- 17. Gross Electrical Energy Generated (MWil) 0
- 19. Unit Senice Factor 0
3330215 37029957-
- 20. Unit Asailability Factor 0
6B.7
- 72. F O
69.0
- 72. F *
- 22. Unit Capacity Factor (Us'ng DER Net) 0 59.0 64.0_
- 21. Unit Capacity Factor (Us'ng MDC Net) 58.5 63.4 _
- 23. Unit Forced Outage Rate 0
0.2 15.4_
- 24. Shutdowns Scheduled Ocr Next 6 Months (Type.Date.and Duratien of Each):
f.
TU h N/A
- 25. If Shut Down At End Of Report Period.Fstimated Date of Startup:
February 18. 1981
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed O'
INITIA L CRITICALITY INITIA L ELECTRICITY i
N/A' COMMERCI A L OPER ATION h
l
[
(9/77
e 50-245 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO UNIT NAMf Mil 1 Wne -l _
^
DATE 800107
{
REPORT MONTil December COMPLETED IlY
-G.
Ha rra n TELEPl!ONE 203/4 f.7-i 792 ext. 655 s
"L O
C E-o i* U Licensee Er
- Mia, Cause 1 Corrective No
- Date E.
3ES Event 5$
E3 Action to p
55 g
I.E ' =
Report #
$0
$U Prevent Recurrence c-s my v
5 10b 801004 S
744 C
N/A None N/A N/A N/A
{
I P
k l
s 56' (5.
~
@;W WY; l
g 3
4 F: Forced Reason:
' S: Scheduled A Equipment Failure (Explain).
Method:
Exhibit G Instructions c3E) 1-Manual for Preparation of Data
'9 11 Maintenance of Test 2.Ma nua! Seram.
Entry Sheets for Licensee f52 '
C. Refueling
- 3. Automatic Scram.
0161)
RJ Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain)
L-upes.iius iiann..g m uscuw s_xanunat,vo i
7.
F Administrative 5
G. Operational Error (Explain)
Exhibit I - Same Source (9/77) li-Other (Explain)
O
Docket 40.
50-245 Page 1 of 1
Date 800107 Unit Name Millstone - 1 Corapleted By G. Harran Telephone 203/447-1792 ext. 655 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month October 1980 I
e DATE SYSTEM COMPONENT PAINTENANCE ACTION 10-11-80 SERVICE WATER.
"C" S.W. PUMP MOTOR Replaced lower guide bearing.
' 10-17-80 CLOSED C0OLING WATER "B"
TBSCCW Hx Plugged 2 'eaking. tubes.
10-23-80 CLOSED COOLING WATER "B"
RBCCW Hx Plugged 2 leaking tubes.
10-23-80 ISOLATION CONDENSER l-IC-50 Replaced I in.+ 1/2 in. valve.
10-28-80 FEEDWhTER,
1-FW-5A Overhauled valve & operator.
10-28-80 FEEDWATER l-FW-5B Overhauled valve.
t e
g b
e e
s
(
L.
~-
Docket No. 50-245 Pag 2 1 of 2 Date T00107 Unit Name Millstone -1 Completed By G. Harran Telephone 203/447-i792 ext. 6a5 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month November 1980 LATE SYSTEM COMPONENT MAINTENANCE ACTION 11-3-80 CONDENSATE 1-CM-SA Disassembled, machined seat & wedge, reassembled.
- 11-4-80 FEEDWATER Disassembled, ins.talled new seat -ring and stem, VALVE reassembled.
11-4-80 FEEDWATER l-FW-14B MIN FLOW VALVE Disassembled, lapped seat, reassembled.
.31-4-80
.FEEDWATER l-FW-14C Disassembled, installed new seat ring, stem, lapped seat - reassembled.
Kinney Strainer Pressure' Installed lin. to 3/8 in. C/S reducer.
- 31-4-80 SERVICE WATER Gauge Connection Dl-6-80 L.P.C.I.
1-LP-448 Motor Disassembled, changed inboard & outboard bearings, reassembled.
31-7-80 SERVICE WATER P e sure Transmitter Replaced valve and nipple.
B1-10-80 CONTROL R0D DRIVE Centrol Red Drive Mechanisms Overhauled'16 mechanisms.
I l-SW-15C 11-10-80
. CIRC.~ WATER -
Replaced header stop valves and.new line.
1-SW-16A.
11-11 -80 FEEDWATER l-FW-5C 10% FCV Disassembled, lapped seat & disc - reassembled.
I S.W. Strainer Bypass Disassembled operator, installed 2 new tension 11-11-80 SERVICE WATER Valve Operator pins and reassembled operato.
11-12-80 CLOSED c.00 LING WATER "A"
RBCCW Hx Plugged one leaking tube.
"fn" r
ump Suct.'
'11-13-80 CONDENSATE Disassembled.- lapped seat & disc - reassembled.
3 op a I
ll-13 80 CONDENSATE "C" Condensate Bstr. Pump Disc, Disassembled - lapped seat.& disc - reassembled.
Root Stop Valve
'11-13-80 CONDENSATE "B" Cond. Bstr. Pump Replaced damaged shaft sleeve and mechanical seals.
.11 '16-80 CONTROL R0D DRIVE CRD Accumulator 30-35 #117 Scram Replaced Valve Internals.
Solenoid Valve 11-21i80 MAIN STEAM MSIV - 1D Replaced cracked disc, stem & lapped seat.
Docket No.
50-2.45
~
.; Page 2 of 2 Date 800107 Unit Name Millstone -1 Completed By G. Harran Telephone 203/447-1792 ext. 655 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month November 1980 DATE SYSTEM COMPONENT MAINTENANCE ACTION 11-22-80 CLEANUP l-CU-29 Disassembled, machined breach block sealing surfaces. Installed new seal ring.
11-22-80 CLEANUP l-CU-2A Disassembled - machined seat & disc. - reassembled.
11-24-80 FEEDWATER IP HTR "A" Plugged leaking tubes.
I-11-25-80 FEEDWATER R placed diaphragm.
)0 V ve Operator 11-26-80 GAS TURBINE -
Relief Air Receiver Valve-Disassembled - lap seat-reassembled.
e e
e e
9
.