i Southwest Fabricating & Welding Company Inc.,
2 h
NOTICE OF DEVIATION Based on the results of an NRC inspection conducted on September 2-3, 1980, it appears that one of your activities was not conducted in accordance with NRC requirements as indicated below:
Criterion V of Appendi.. B to 10 CFR 50 states:
" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accom-plished in accordance with these instructions, procedures, or drawings.
Instructions, procedures, or drawings shall include appropriate quantita-tive or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Paragraph L on Page V of Gilbert Specification SP-545-04461-000 states, " Code Class 1 pipe and fittings with a design pressure greater than 275 psig shall be supplemented with the nondestructive examination requirements of AEC Regula-tory Guide 1.66."
Contrary to the above, the nondestructive examination requirements of AEC Regulatory Guide 1.66 were not implemented for all pipe items in nine (9) piping assemblies and one (1) pipe, which were required to be furnished in accordance yith Gilbert Specification SP-545-04461-000 for installation in ASME Section III Class I systems with a design pressure greater than 275 psig (See Details, B.4.a.).