ML20002D076
| ML20002D076 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/30/1980 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-106, IEB-80-23, NUDOCS 8101190342 | |
| Download: ML20002D076 (2) | |
Text
1 / 7C Y-f 9
Georgia Power Company 4
^
Post Offca Box 4545 Atlanta, Ge. argia 30302
.~00 yogtle, Project Teiephene 404 522-6060
-l Southem Company Servces, Inc.
Post Offce Box 2625 Birmingham, Alabama 35202 Telephone 205 87M11 December 30, 1980 United States Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement RII:.JP0 Region II - Suite 3100 424 101 Marietta Street, NW 50-425 C
Atlanta, GA 30303 File:
X7BC24 Attention: fir. James P. O'Reilly Log:
GN-106 Gentlemen:
The following is submitted in response to your letter dated November 14, 1980 concerning I.E.Bulletin 80-23.
Georgia Power Company does not have any Valcor Solenoid Valves with part numbers V70900-21-1 or 3 for safety related functions.
It is estimated that 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> were used for the review of design and praparation of this report.
No manpower will be required for correc.tive actions.
t 1 y rs ) ;
o I
oug Dut on Project eneral Manager CWH:tp l
xc:
U. S. Nuclear Regulatory Commission l
Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC M. D. Hunt - USNRC, Region II 8)o)19039 7
3
/
i' Mr. James P. O'Reilly RII: JP0/50-424; 50-425 December 30, 1980 Page 2 xc:
J. H. Miller, Jr.
W. E. Ehrensperger F. G. flitchell, Jr.
C. F. Whi ttrer R. J. Kelly R. E. Conway R. W. Staffa H. C. Nix K. M. Gillespie C. W. Hayes E. D. Groover D. L. McCrary R. A. Thomas it. Z. Jeric J. L. Vota
.