ML20002D074
| ML20002D074 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/30/1980 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-107, IEB-80-21, NUDOCS 8101190336 | |
| Download: ML20002D074 (2) | |
Text
r Georgia Power Company
,12 Post Offee Box 4545 C.f '
L k
Attanta, Georgia 30302
- O,>
{}VOgtle Project Telephone 404 522-6060 Southern Company Servces. Inc.
Post Office Box 2625 Barrnngham, Alabama 35202 Telephono 205 870-6011 December 30, 1980 United States Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement RII:- JP0 Region II - Suite 3100 00_-424;50-425j 101 Marietta Street, NW Atlanta, GA 30303 File:
X7BC24 Log:
GN-107 Attention: Mr. James P. O'Reilly Gentlemen:
The following is submitted in response to your letter dated November 5, 1980 concerning I.E.Bulletin 80-21.
Georgia Power Company dees not have any active valves in safety related systems with valve parts cast by Malcom Foundry Company, Inc.
It is estimated that 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> were used for the review of design and preparation of this report.
No manpower will be required for corrective
- actions, e
tr y yo
,J
\\
,1 Tm 4~
Doug Dutton Project Ganeral Manager CWH:tp xc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 205E5 M. D. Hunt, USNRC, Region II 81011903 % Q
f
/
lir. Janes P. O'Reilly RII: JP0/50-424, 50-425 December 30, 1980 Page 2 xc:
J. H. f tiller, Jr.
W. E. Ehrensperger F. G. flitchell, Jr.
C. F. Whi tmer R. J. Kelly R. E. Conway R. W. Staffa H. C. flix K. M. Gillespie C. W. Hayes E. D. Groover D. L. ficCrary R. A. Thomas I1. Z. Jeric J. L. Vota 1
1 e