Advises That Centermelt Fuel Bundle Did Not Perform as Expected & Licensee Will Not Reinsert Centermelt Fuel in Reactor.Util Currently Evaluating Performance of Single Centermelt Bundle
ML20002C990
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/14/1969
From: Walke G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Morris P, Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8101150677
Download: ML20002C990 (2)


Text

(

4

\\

CODSumBIS f

POWCr

. 1 C0mpany General Offices: 212 West Michigan Avenue. Jackson. Michigan 49201. Area Code S17 788 0550 May 14, 1969 1 6 fatory p;gg Dr. P. A. Morris, Director Re: Docket 50-155 Division of Reactor Licensing DPR-6 ZEK United States Atomic Energy Commission Washington, LC 20545

Dear Dr. Morris:

Attention:

Mr. D. J. Skovholt On April 7, 1969, Consumers Power Company sent you copies of Special Report SR-10 covering the performance evaluation of centermelt fuel irradiated during the period March through June 1968. On April 16, 1969, represen+.atives from Consumers Po'er Company and General Electric Company discussed the report with USAEC DRL and RDT representatives in Bethesda. At that time, we stated that it was our intention to reinsert the center =elt fuel into the Big Rock Point reactor during the April-May 1969 refueling outage, if the single centermelt fuel bundle irradiated during the period June 1968 through April 1969 performed as expected.

This bundle has not performed as expected. Consequently, we will not reinsert any centermelt fuel into the reactor at this time.

We are currently evaluating the performance of the single centermelt bund *.a.

This evaluation will undoubtedly change our con-clusions on the original centermelt faile.es and 1.ay even change the progsed cente rmelt irrad$ tion program. The res"1.ts of th$ s evalua-tion, when completed, will be reported to you 1'1 a semiannual report.

Yours very truly, GJW/ map Gerald J. Walke m

e Supervisory Engineer CC: RLHaucter g

C J.

+

6

+

s T

(9 7

2 6

-9 4

1^'C O

m f

b5$b h

l

.s

.)

)

i l

.- w 4.,

_ 4

,,..,..;. w ; y - ;

s - p *.

.r.a

..~$

.~...

na g gyg 1969 fr

"* i Consismore Power % y

" M D1F;'1999 l

Jacteen. Richigan (Gera!( E. Welhe)

"1 ORio.:

CC:

orpetn; 1

Dr. Peter A. Norris Actions esECEssARY CONCtWtRENCr O

o^tE ^=sweaE=>

NO ACTION 4CEssARY CNNT O

eY:

GLASSlF.:

POST OFF13 FILE. CODE:

REG. Deo:

sucaint= %,

uo.,rwi RETDtRED TO DATE Received BY DaTE g

g R port $1-19 & advi,as that the 14 a=====

5-15 centermelt 1%sel Wie did not perfens

/ ? e,

".a AC11""

as expected and that centermalt feel witi i."

1. h.I.J 1.w' E C osumEs:

the reacter at this tians....

ISTRIBUTIN:

egulatery-fikg AEC FOR

% Hance-(2., )

00,P,,1 mMr'

= >e

--..,_.m.

3, %

Skovbolt

'"a =

norrrr/sthroesur RU%pf.,'.V!pMC}

r n'>

.... w u.s. 4rcuic eneRoy couuiss' "

MR COMOL MM rm

.m..,.=

o......n....,mm..,m.,..........

i l

P00R BER e