Submits Schedule for Voltage Protection Equipment Installation Per Util & NRC Request Re Onsite Emergency Power Sys.Equipment Expected to Be Ready for Installation During Summer 1979 & Completed by 1980 Outage
ML20002C875
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/01/1978
From: Bixel D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 8101120258
Download: ML20002C875 (2)


Text

.

l.

~

r. m.. -

i.. p,..,

';.<,Lp.l-t 5 ti c A i t i..

CODSUmBTS

! POWct C0mpBHy General Offices: 212 West Michigen Avenue. Jackson Michigan 49201 e Area Code 517788-05S0 September 1, 1978 Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief i

Operating Reactors Branch No 2 US Nuclear Regulatory Co==ission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - ON-SITE EMERGENCY POWER SOURCES By letter dated June 14, 1978, we responded to an NRC staff request concerning on-site emergency power system for our Big Rock Point Plant. This letter provides the schedule for installation of voltage protection equipment dis-cussed in our June 14, 1978 letter.

Preliminary investigation has deter =ined that Class IE undervoltage relays are available on a 2h-veek delivery schedule. Since this type of relay has not been Co=pany qualified, procurement (to obtaining a relay for testing) and qualification testing are expected to take an additional 20 weeks. There-fore, we expect to have th equipment ready for installation during the su=ner of 1979 The installation will be completed as soon as practical (following delivery of the material) without affecting plant availability and, in any event, no later than the refueling outage scheduled for 1980, f

David A Bixel Nuclear Licensing Administrator CC: JGKeppler, USIBC 870/fA6A5f

^

j REGULATORY INFORMATION DIGTRIEUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOt11NG MATERIAL 50-155

' FJC: ZIEMANN D L ORG: DIxr!

,A DOCDATE: 09/01/78

RC CONSL RS PWR DATE RCVD: 09/05/7:

. DOCTY?E: LET1ER NOTARIZED: NO COPIES RECEIVED LTR 1 ENCL 0 SUDJECT:

FURNISHING APPLICANT"G SCHEDULE FOR INSTALLATION OF VOLTAGE PROTECTION EOUIPMENT FOR THE ON-SITE EMERGENCY PWR SYGTEM, AS DISCUSSED IN APPLICANT"S LTR DTD 06/14/78.

REVIEWER INITIAL:

XJM

-PLANT NAME: BIG ROCK PT DIGTRIBUTOR INITI AL-ooo************** DISTRIBUTION OF THIG MATERIAL IS AS FOLLOWS ******************

ONSITE EMERGENCY POWER SYSTEMS.

(DISTRIDUTION CODE A015)

FOR ACTION:

BR ClIIEF _mORDil? DC**LTR ONLY(7)

-INTERNAL:

EG F I

  • rLTR O NRC PDR**LTR ONlY(1) v a iIu UNLY(2)

OELD**LTR ONLY(1)

MIPCtrLTR ONLY(1)

HANAUER**LTR ONI.Y(1)

AUXILIARY SYS BR**LTR ONLY(1)

I & C SYGTEMS BR**LTR ONLY(1)

AD FOR SYS R( PROJH LTR ONLY(1)

ENGINEERING BRMLTR ONLY(1)

REACTOR SAFETY BR**LTR ONLY(1)

PLANT SYSTEMS BR**LTR ONLY(1)

EEBalTR ONLY(1)

POWER SYS BR**LTR ONLY(1)

T.

WAMDACit**LTR ONLY(1 )

D.

TONDI**LTR ONLY(1)

D.

MCDONALDurLTR ONLY(1)

J.

HANNON**LTR ONLY(1)

J.

MCGOUOH*<LTR ONLY(1)

EXTERNAL:

LPDR'S CllARLEVOI X, MI*.uLTR ONLY(1)

ACRS CAT B**LTR ONLY(16)

CONTRbL NCR:

4C246*tfS DISTRICU I' ION:

LTR 44 ENCL 0 SIZE: IP 000********************************

THE END P00R ORBINAL

.