Requests Delay Until 720901 for ECCS Reanalysis Submittal. Delay Will Not Alter 740701 Schedule for Small Break ECCS Improvements.Design Analysis Re Fuels & Methods Improving ECCS in Progress.Performance Info to Be Available by 720901
ML20002C873
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/27/1972
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8101120251
Download: ML20002C873 (2)


Text

'

1

~

'Riiutatory' FIIe Cy.

e y

h 6

CORSum8tS ffy g'r{t.f r(pd9 3

POWCT h

-r t

J, Ugg9197k; a

u C0mpBuy

%c$ Wh ~

h.djf:t a

g General Offices: N2 West Michigan Avenue. Jackson. Michigan 49201. Area Code F17 788-0550

/gq h

y;3 Q

June 27, 1972

\\' 3,

DOCKETED USAEC

-n 92 JUN 231972 " @

REGULATORY

/-

Mr. John F. O' Leary, Director c, EAR SECTION Re: Docket No 50-155 DOCW CW License No DPR 6 Directorate of Licensing US Atomic Energy Commission 4

j,"

Washington, DC 20545

Dear Mr. O' Leary:

Mr. Donald J. Skovholt's letter of January 17, 1972, nquested that we submit a reanalysis of the Emergency Core Cooling System (ECCS) pt -formance for the Big Rock Point Plant by July 1,1972. The ant'ysis fcr the Design Basis Accident (DBA) was submitted on May 18, 1972, <hich demonstrated that, although the present Type F fuel exceeds the Interim Acceptance Criteria, future fuel modifications are available which will allow the fuel to meet the criteria.

Preliminary investigation of the small-break accident indicates that the interim criteria may not be met with the present low-pressure spray equipment. The design analysis which must be conducted on the various fuel designs and methods available to improve the Big Rock Point ECCS performance is under way; however, the performance information on the system will not be available until about September 1,1972. Accord-ingly, we request a delay until September 1,1972, for submittal of the information requested above.

This delay, however, will not alter the July 1, 1974, schedule for affecting small-break ECCS improvements, if any are necessary, in the Big Rock Point Plant system.

Yours very truly, f

JSR/ map Ralph B. Sewell Nuclear Licensing Administrator CC: BHGrier, AEC-COO j.I P

7l0118596)

~

y s

)

w..,

  • I AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

mo FROM:

DATE OF DOC:

DATE REC'D LTR MEMO RIT UfHER Consumers Power Company Jackson, Michigan 49201 Ralph B. Sewell 6-27-72 6-29-72 X

TO:

ORIG CC UfHER SEhT AEC FDR X

SEhT LOCAL PDR Mr. O'in m 1

INFIII NO CYS REC'D DOCKET NO:

Q ROP INFO CIASS:

60 50-155 DESCRIPTION:

ENCLOSURE 3:

Ltr re our 1-17-72 ltr requesting a reanalysis of ECCS for Big Rock Point Plant..... advisir:g that requested info will be sub=itted by 9-1-72.......

DO NOT EV0VE

.trer"'reeqpd e

'$5 Iss d b PIANT NA!ES: Big Rock Point Plant FOR ACTION /INFORIMTION 6-29-72 AB BlIPLER(L)

KNIEL(L)

VASSALLO(L)

VI,IEIMNN(L)

KNIGHTON(ENVIRC W/ Copies W/ Copies W/ Copies W/9 Copies W/ Copies CLARK (L)

SCHWENCER(L)

H. DENTON CHITJ00D(FM)

W/ Copies W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)

STOLZ(L)

SCHEMEL(L)

JICF"(EINIRO)

W/ Copies W/ Copies W/ Copics W/ cepics W/ Copies INTF.RNAL DISTRIBUTION

~

kREG FIIg F 6TELLO-L VVOLLMER-L KARAS-L L/A P4R y

pgg lu,U roR FM00RE-L e/DENTON-L (4)

MASON-L L/A BWR g,

4 REG OIER (2) (M LANGE-L GRDES-L BROWN-L L/A PJR

/

  1. B. Co r

FOGC-RM P-506 PAWLICKI-L GAMMILL-L WILSON-L L/A PJR y

88

  1. MUI.TZING & STAFF # THOMPSON-L KLIGHTON-ENVIRO KARI-L L/A BWR sen GIAMBUSSO-L F TEDESCO-L DICKER-EINIRO SMITH-L L/A FJR

. Hanauer t/BOYD-L-H4R vl0NG-L PROJ LDR EINIRO:

GEARIN-L L/A BWR./ Lauben DEYOUNG-L-PJR FLAINAS-L DIGGS-L 1/A MULLER-L-ENVIRO SHAO-L SALTaMN-IND.

TEETS-L L/A F SK0VHOLT-L-OPER BENAROYA-T.

MCDONALD-PLANS WADE-L L/A EINIRO F hVfH-L VMORRIS-RO NUSSBAUMER-FM BRAITMAN-A/T K

  1. MACCARY-L DUBE-L SMILEY-FM HARLESS-ENVIRO VdCHROEDER-L y E. CASE-L P. COLLINS-L EXTERNAL DISTRIBUTION 1-LOCAL PDR l-SAN /LA/NY--FDR vl-DfIE-(IAUGHLIN) 9-NATIONAL LAB'S 1-CHIEF WATER REACTORS F1-NSIC-(BUCHANAN)

ANL/ORNL/BtTJL l-RD....E. HALL F-309 GT 1-ASLB-YORE /SARYE 1-R. CARROLL-0C, GT WOODWARD /H. Sr.

1-R. CATLIN, A-170, GT 1-C. MILES-C-459, GT 1-CONSULTAhT' S g16 CYS ACRS-HOLDING NEWMARK/BLUME/AGBABIAN 1-DR. GERALD S. LELLOUCHE BROOKHAVEN NATIONAL IAB i

.