ML20002C722
| ML20002C722 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/15/1980 |
| From: | Dunn C DUQUESNE LIGHT CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-23, NUDOCS 8101100786 | |
| Download: ML20002C722 (1) | |
Text
k 7a sc3tti.
., s?s Syst Duquesne Ugat C IZ 'L" Decenber 15, 1980 us, f 1^
a United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn: Boyce H. Grier, Regional Director Region I 631 Park Avenue King cf Prussia, Pennsylvania 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 IE Bulletin 80-23 Gentlemen:
IE Bulletin 80-23 describes failures of solenoid valves manufactured by Valcor Engineering Corporation. We have conducted a review and con-clude that there are no Valcor solenoid valves at Beaver Valley Unit #1.
The letter which transmitted IE Bulletin 80-23 requested that we provide an estimate of the manpower expected as a result of this Bulletin.
We estimate that 4 manhours have been expected in conducting reviews required by this Bulletin and preparation of the report.
Since no corrective action will be required as a result of this Bulletin, no manpower will be required for corrective action.
If you have any questions concerning this response, please contact my office.
Very truly yours, C. N. Dunn Vice Presiden*, Operations cc:
Mr. D. A. Beckman U.S. Nuclear Regulatory Commission Beaver Valley ?ower Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Manegement Branch Washington, DC 20555 Director, Division of Residential Regional Reactor Inspection Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 9
8101100 7(f
-