Forwards XN-NF-78-25, Big Rock Point Example LOCA Analysis Using Exxon Nuclear Co Non-Jet Pump BWR Evaluation Model - Large Break Example Problem,Jul 1978, Per Util 780418 ECCS Analysis Schedule
ML20002C545
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/16/1978
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 8101100447
Download: ML20002C545 (2)


Text

.

g..

.c.

V ConSum8f3 i

Power 9

Company v-g 73 d)

Li

.. -. -... -.....~.....~.~.-.-..~... -..... -..,,,.......

August 16, 1978 gaa n falw Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemnn, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Con =ission Washington, DC 20555 DOCKET 50-155 - LICE:ISE DPR BIG ROCK POINT PLAC -

ECCS ANALYSIS REPORT II-Iri-78-25 Consumers Power Company on April 18, 1978 sub=itted the following ECCS analysis schedule to fulfill the requirements of the Safety Evaluation prepared by the NRC and transmitted with Anend ent 15 to DPR-6 (10-17-77):

1.

Submit model and sa=ple probles - early August 1978.

2.

Submit break spectrum results - mid-November 1978.

3 Sub=it Technical Specification MAPLEGR Limits - mid-February 1979 Attached are forty (40) copies of the July 1978 Report Ei-NF-78-25 entitled

" Big Rock Point Example LOCA Analysis Using the Exxon Nuclear Company NON-JET Pump B'n'R Evaluation Model - Large Break Exa=ple Problem." This report ful-fills co=nittent one of the schedule.

David P Hoffman (Signed)

David P Hoff=an Assistant Nuclear Licensing Administrator CC*

JGKeppler, USNRC IE Region III

..L x

i

, 59 6101100 $ y pi j

-r

e orlusin c o

REGULATORY INFORMATION DISTRIBUTION SYSTEM LRIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-155 REC: Tlch1ASJM D, ORG: HOFFMAN D P DOCDATE: 08/16/78 NRC I

CONSUMERS PWR DATE RCVD: 08/18/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED LTR 1 ENCL 40

SUBJECT:

FORWARDING COPY OF THE JULY 1978 REPT XN-NF-70-25 ENTITLED: " BIG ROCK POINT EXAMPLE LOCA ANALYSIS USING THE EXXON NUC CO NON-JET PUMP BWR EVALUATION MODEL - LARGE BREAK EXAMPLE PROBLEM.

& hin N hN<) G)os I UCC dC, REVIEWER INITI AL:

XJM PLANT NAME: BIG HOCK PThg Nf)

DISTRIBUTOR INITI AL: OL-6 ccccco*********** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

OENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE AOO1)

FOR ACTION:

DR CHIEF ORB #2 DC**W/7 ENCL INTERNAL:

h G FILE **W/ ENC NRC PDR**W/ ENCL I & E**W/z udLL OELD**LTR ONLY HANAUER**W/ ENCL CORE PERFORMANCE BR**W/ ENCL AD FOR SYS & PROJ**W/ ENCL ENGINEERING BR**W/ ENCL REACTOR SAFETY BR**W/ ENCL PLANT SYSTEMS BR**W/ ENCL EEB**W/ ENCL EFFLUENT TREAT SYS**W/ ENCL J.

MCGOUGH**W/ ENCL EXTERNAL:

LPDR'S CHARLEVOIX. MI**W/ ENCL TERA **W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL P00R ORIGlHAL h(OG kf DISTRIBUTION:

LTR 40 ENCL 39 CONTROL NBR:

7G210000^

SIZE: 1P+44P I

cocoo******************************

THE END Cb0 res.

.