States Minor Clarification Re 760419, Comments by Director, Nuclear Reactor Regulation Re Request for Exemption from Requirements of 10CFR50.46. Certificate of Svc Encl
ML20002C474
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/30/1976
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
References
NUDOCS 8101100349
Download: ML20002C474 (3)


Text

-

d L

g.. eg

~

~ T CODSum8IS m.,natcry power 7.n g '

Company p 9 77W 4

' 9, 09 l[f b 2,2 w,'7 an Ave c.

..ai on.

g schon Michigan 49201. Area Cooe S17 788-0550 April 30, 1976 g

jggg y '_.

[l)

TO*A' g

i a\\g

/

9 ce Mr Samuel J. Chilk g

i m

Secretary of the Commission Q\\

I-

'i US Nuclear Regulatory Commission j

Washington, DC 20555 DOCKET 50-155, LICENSE DPR.,

BIG ROCK POINT PLANT Consumers Power Company has received and reviewed the " Comments by the Director, Nuclear Reactor Regulation Relating to the Request for Exemption of the Big Rock Point Nuclear Power Plant From the Requirements of 10 CFR Section 50.46" dated April 19, 1976.

j We are in agreement with the recommendations; however, it appears that minor clarification of the Director's Comments in three areas is desirable. The purpose of this letter is to state the minor clarifications.

The first area that we believe requires clarification is Item 1.c) on Page 25 of the Director's Comments. This item states:

"c)

Modify the emergency procedures to assure a second emergency diesel can be obtained and operational within 2h hours after a LOCA."

(Emphasis added.)

We believe that the word " operational" was intended to convey "can be made fully operational" because it is likely that in most of the LOCA situations that would exist, it would not be desirable to connect and have the second diesel generator operating. This is due mainly to two reasons: The first is that Bus 2B has to be de-energized to connect the diesel generator. The second is that it would not be desirable to attempt to operate the installed emergency diesel generator and this diesel generator in parallel.

We believe that the staff is in agreement with this interpretation.

The second area that requires clarification is Item 2.a) on Page 26 Item 2.a) states:

"a)

Modify the fire protection system such that long-term cooling can be

(,

accomplished without relying on portions of its underground piping."

9 I

8103 i on 347

4

~

+

3 j

a 2'

9 We believe that the objective of this modification would be to provide connec-tions such that a temporary cooling path bypassing the underground piping could be established if a failure were to occur in the underground piping during the long-term cooling phase following a LOCA rather than a permanently installed redandant piping system.

We believe that the staff is in agreement with this interpretation.

The third area that requires clarification is Item 2.d) on Page 26.

Item 2.d) states:

"d) Provide complete on-line testability of the ECCS including the actuation system." (Emphasis added.)

We believe that the objective of the words "on-line" was to convey testability during plaat operation rather than an automated logic type testing system.

We believe that the staff is in agreement with this interpretation.

Ralph B. Sewell (Signed)

Ralph B. Sewell g

Nuclear Licensing Administrator CC: Director, Nuclear Reactor Regulation, USNRC (40) i 4

1 f

i t

[

l e

^'~

" ~ '

.....m

I u.s. NUCLL A") nEGULATOR Y C;MMISSa' N DOCKET NUM OE D NRC r nu 195 50-155 tr.7e

' NRC blSTRIBUTION rcn' PART 50 DOCKET MATERIAL j

T:

3.J. Chilk FHOM: Consumers Power Co.

DATc or ooCuuENr Jackson, Michigan 4-30-76 R.B. Sewell oArc ncCcivEo 5-3-76 OLcTTEn ONoTonszco enoe INPUT FORM NUMBEn OF COPIES nECEIVED C niclN Al.

6]UNC LASSIFIE D Ocopy 40 7

DESCCIPTION E NCLOSU R E I

Ltr. re, request of 4-19-76...

Ltr. stating minor clarification relating to the 3

request for exemption of the Big Rock Poirtt N h'OTn M'OVE

~

Nuclear Power Plant from the requirements of 10 CFR Section 50.46......

ACKNOWLEDGED (40 Unsigned Cys. Received)

PLANT NAME:

Big Rock Point

~

SAFETY FOR ACTION /INFORMATION ENVIRO UU U-U-N ASSIGNED AD :

ASSIGNED AD :

dRS;CH CHIEP :

7ipmann IJ /f, BRANCH CHIEF :

w PROJECT MA:AGER:

PROJECT !!ANAGER :

_ / LIC. AfST. :

Diaos LIC. ASST. :

~

~

INTERNAL DISTRIBUTION

$ _+ -GEG FILE)

I SISMSJETY PLANT SYSTrt's vnvTnn m n

- NRC_P_DR HEINEMAN TrnEsco ERNST

' I_& E IM SCHROEDER BENAROYA BALLARD w

dF10 ---

LAINAS SPANGLER

_w GOSSICK & STAFF ENGINE _ERING IPPOLITO SITE TECH

__MIEC MACCA3y CASE KNIGHT OPERATING REACTORS gal @lILL

__))ANAVER SIlNEIL STELLO STEPP

_JIARIISS PAWLICKI HUU1AN OPERATING TECH

-EI_SENHlTT (.L..T-EJ SITE ANALYSIS PROJECT MANAGEMENT REACTOR SAFETY

(

BOYD ROSS L.-SUA0 VOLDIER P. COLLINS NOVAK s

-BAER BUNCH 110USTON ROSZTOCZY J dCH'iENCER L

h COLLINS PETERSON CllECK

c. -T; RIMES KREGER MELTZ HELTEMES AT & I SITE SAFETY & ENVIRC SKOV110LT SALTZMAN ANALYSIS RITfBERG DENTON & MirT.LER

~ ^ '*

CONTROL NUMBE R EXTERN AL DISTRIBUTION

. -l.PDR: Charlevoix, MI NATL LAB llR00KilAVI:N NATL LAll

- TIC REG. V-IE ULRIKSON(ORNL) w r_NSIC T.A PDR 43f,8 ASLB CONSULTANTS 93CRS_.l.41:01/JISOffr.; t_

}g ll

{l 3 U d ER UEEEMEEEA Eh r

C7 C F OflM 105(2 70)