NEEAi0D P*Q' 'ep 00U, scm L
f Consumers L
power
(
\\
/
Company QF G 5 S
b 5) Y
..on.c..:m... oc~......,...s.c..
o.cmo., -..,..co. m m....o April 5, 1978 Director of Nuclear Reactor Regulatica Att: Mr C J Heltemes, Chief Quality Assurance Branch US Nuclear Regulatory Co= mission Washington, DC 20555 DOCKETS 50-155 & 50-255 -
LICENSES DPR-6 & DPR BIG ROCK POINT & PALISADES PLANTS By letter dated December lb,1976, we informed you of our schedule of imple-mentation of Quality Assr-ance Topical Report CPC-1A.
Since that time, ve have had discussions with your personnel concerning changes to that report and our
(
program of implementation.
This letter is written to document the degree of implementation of our QA Pro-gram and to provide revised implementation dates in a few areas where imple-mentation has not been achieved. With but a few exceptions, the QA Program as described in CPC-1A, Revision 12/12/77, has been implemented. A discussion of each of the areas, where some implementation remains to be completed, is described below. Tentative implementation dates are also presented.
Poliev 2 - Production & Transmission Department It has been the established practice to train all Consumers Power employees in the essentials of performing their jobs. This training has been the responsi-bility of the immediate supervisor.
It was and is, however, less formalized than current requirements for nuclear power personnel. Significant progress has been made in developing formalized training programs and implementing them. Specifi-cally, both Big Rock Point and Palisades Plant completed their training matrices and schedule by March 1,1977, and initiated formal training for Operations personnel by June 1, 1977 Formal skills training for maintenance personnel was also initiated at the Palisades Plant. Neither plant, however, has initiated formal technical training for technical personnel, but they have co=mitted to initiate such training by May 1, 1978. Formal skills training for maintenance personnel has not been initiated at the Big Rock Point Plant but vill be by
!!ay 1,1978.
(
In the General Office, on-the-job training was and is the estab shed practice.
In two technical support departments, a for=alized training pro ra= is being e
developed. The Operating Services and Nuclear Activities Departments have ecm-mitted to develop training matrices and procedures, and to initiate formal training by June 1, 1978.
81011%
t.
I 2
i
- 'k i
I Policy 5 - projects, Engineerinc & Construction i
The requirements of supplier-related impositions have been placed upon Consumers Power Company's major modification principal suppliers through the procurement document. Completion of specific department procedures with regard to procure-ment requirements for principal suppliers is scheduled for April 1,1978.
Volume II procedares were revised to incorporate requirements of Volume I policies.
Policy 16 - Production & Transmission Denartment A highly formalized Deviation Reporting and Corrective Action System, with for-malized, computerized reporting and follow-up has been developed and fully in-plemented. A somewhat informal trend analysic based on a limited number of subject headings has been implemented. A much more formalized, computerized trend analysis program tied into the computerized Corrective Action reporting system is being developed. The full development and implementation of the trend analysis program will be completed by April 1978. Backfit to the corrective 4
action documents for the past two years will be completed by August 1978.
David A Bixel (Signed)
(
David A Bix-1 Nuclear Licensing Administrator l
CC: JGKeppler, USNRC DLZiemann, USNRC
(
I i
l
?
d Y
(
(RIDS)
REGULATORY INFORMATION DISTRfDUTZON SYSTEM 50-25 55 DISTRIDUTION FOR INCOMING MATERfAL EC: HELTEMES C J ORG: CIXEL D A DOCDATE: 04/05/73 DATE RCVD: 04'11/7?
CONSUMERS PWR idRC COPIES RECEIVED OCTYPE: LETTER NOTARIZED: NO LTR 1 ENCL. 40 UBJECT:
URNISHING INFO RE DEGPEE OF IMPLEMENTATION OF APPLICANT"S OA TOPICA AND PROVIDING REVI?ED IMFLEMENTATIONS DATES IN A FEW AREAS WHEPE PC-AA, MPLEMENTATIONS HAS NOT EEEN ACHIEVED.
REVIEWER INITI AL:
XJM
'LANT NAME: PALISADES DISTRIBUTER INITIAL; R EIG ROCK PT vm44*o4*******+4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
- ++4+++++
JOTES:
3 COPIES TO It E DCCKET MATER!AL REGARDING GUALITY ASSURANCE (DISTRIEUTION CODE A026)
FOR ACTION-ER CHIEF ZIEMANN44W/4 ENCL KNIGHTON44W/ ENCL FOR INFO:
MOORE +4W/ ENCL SLATER **W/ ENCL FOR INFO:
C O T 6 *t.t W M.N CJ, NRC PDR**W/ ENCL INTERt'AL:
EG FILE **H/ ENCL GOSSICK & STAFF *+LTR CNLY I._, E+4W/2 ENGL DEYOUNO**W/ ENCL BOYD**W/ ENCL HELTEMES*-+W/ ENCL EUTLER**W/ ENCL E CASE **LTR ONLY OELD**W/ ENCL SKOVHOLT*4LTR ONLY THORNEERG**W/ ENCL EXTERNAL-LPDR'S KALANAZOO, NI**W/ ENCL NSIC**W/ ENCL TIC **W/ ENCL ASLB**W/ ENCL ACRS CAT G**W/16 ENCL P00R ORIGINAL L Phq.,
c Q A Et.e LC)C N.
GML CONTROL NER.
.:.M -t *7I'1 DISTRIEUTION:
LTR 41 ENCL 38 51ZE: ;P
- ++++++**d++++++++++++++++o+-:
- oo*-+****++++++^**********e******
THE END r
_.