Informs of Inability to Submit Semiannual Operating Rept in Required 60 Days After 750701.Requests Waiver of Tech Specs Requirement Until 750901.Data Re Quantity of Principal Radionuclides Released to Unrestricted Areas Due by 750901
ML20002C467
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/07/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8101100342
Download: ML20002C467 (2)


Text

>

(

158'COM Cons e s

,..-M l

Power ghyug 7-Company e

o.n.. omc..: m w..i u.cnia.n Av.nu.. a.cw.on. u.cnia.n am A,.. coo. si7 7se-osso

-r,..

August 7, 1975 k

- I.ic p

' i' D

Division of Reactor Licensing

/

r r-US Nuclear Regulatory Commission Ej I' *, 2 U5 -

4 -

Washington, DC 20555 A'~

A DOCKET 50-155, LICENSE DPR k-

' Q f)-

BIG ROCK POIIC PLAIE This letter is written to inform you that we will be unable to fulfill the requirement of submitting a Semiannual Operating Report for the Big Rock Point Plant (Technical Specification Section 7.2.2.1.2.a(1)) in the required sixty days following July 1 of this year and to request a waiver of that Technical Sp elfication requirement until September 1, 1Cfl5 On January 13, 1975 Consumers Power Company proposed a new Administrative Con-trols Section for the Big Rock Point Technical Specifications. These proposed k

Technical Specifications incorporated the requirements of Regulatory Guide 1.16, Revision 2.

Included in this change was a change of the Semiannual Report frequency from semiannual to annual. At the time the change was submitted, we concluded that this change would be approved prior to the time the next Semi-annual Report was due in accordance with the existing Technical Specifications and organized our work effort for preparation of the report accordingly. The proposed Technical Specifications have not yet been approved apparently due to changes that are presently being made in Regulatory Guide 1.16.

It was recognized late last week that we would likely be required to submit a Semiannunl Report for the Big Rock Point Plant. As preparation of such a report essentially consumes all of two months, we concluded that we would not be able to submit this report in accordance with the requirements of the existing Technical Speci fications. Therefore, we are requesting the waiver of Section 7 2.2.1.2.a(1) of the Technical Specifications until September 1,1975 The data regarding the quantity of each of the principal radionuclides released to unrestricted areas in effluents that is required to be reported by both Section 7.2.2.1.2.a(1) and 10 CFR 50 36.a(a)(2) will be submitted withiv. sixty days following July 1 of this

year, ej

~

4 fjs N3p%

Ralp B. Sewell S

O h',p,g)/1[f)

Nuclear Licensing Administrator 2

g(

q c-L vy

(

i t

QLk)

CC: JGKeppler, US2C 4,s.

File x

3 y

8101100 N A D

i

NRC DISTI IUTION FOR PART 50 DOCKET MA_. RIAL (TEMPORARY FORM) 8SO9 CONTROL NO:

c FILE:

1 FROM: Consumers Power comp uy DATE OF DOC DATE REC'D LTR:

TWX RPT OTHER f*

8-7-75 8-11-75 XXX E'

ORIG CC OTHER SENT NRC PDR YY XX

' TO:

one signed SENT LOCAL PDR DL CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

1 50-155 XXXXXX ENCLOSURES:

DESCRIPTION:

Ltr advising that they will be unable to submit an semi-annual operating report for the period following the gyg 60 day limit required by tech specs

.....and requesting a watver of said rg gggp requirements....

PLANT N AME: Big Rock Point

~

FOR ACTION /INFORMATION g.12-75 chf BUTLER (L)

SCHWENCER (L) JIEM, ANN (L)

REG AN (E) e W/ Copies W/ Copies

/ WNCopies W/ Copies CLARK (L)

STOLZ (L)

DICKER (E)

LE AR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)

VASSALLO (L)

KNIGHTON (E)

SPIES W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)

LPM W/ Copies W/ Copies W/ Copics W/ Topies INTERNAL DIS _ RIBUTION T

7REGJM TECH REVIEW DENTON LIC ASST _

_A/T IND,

~

BRAITMAN SCHROEDER GRIMES R. DIGGS (L) f0GC, ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)

SALTZMAN j

ynau PDR GOSSICK/ STAFF KNIGHT KASTNE R E. GOULBOURNE (L)

MELTZ f

PAWLICKI BALLARD P. KREUTZER (E)

CASE SPANGLER J. LEE (L)

_ PLANS GIAMBUSSO SHAO MCDONALD BOYD STELLO M. RU3HBROOFIL)

CHAPMAN MOORE (L)

HOUSTON ENVIRO S. REED (E)

DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SHEPPARD (L)

E. COUPE PETERSON GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

HARTFIELD (2)

P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)

KLECKER DENISE J. COLLINS REGAN S. TEETS (L)

REG OPR LAINAS PROJECT LDR G. WILLI AMS (E)

EISENHUT WIGGINTON

/EILE & REGION (2)

BENAROYA V. WILSON (L)

MIPC VOLLMER HAR LESS R. INGRAM (L)

'I2 M. DUNCAN (E) ll' EXTERN AL DISTRIBUTION CEo e/ car 0 W) N/

1 - PDR SAN /LA/NY

/1 - LOCAL PDR (1)(2)(TU N ATION AL LABS 1 - BROOKH AVEN NAT LAB f - TIC (ABERN ATHY)

- W. PENNINGTON, Rm E.201 GT 1 - G. ULRIKSON ORNL l

1

/ - NSIC (BUCHANAN) 1 1 - ASLB 1 - CONSULTANTS NEWM ARK /BLUME/AGBABI AN

/

1 - Newton Anderson A-ACRSi.LDIN6/SENT To L. A. De3 S S P00R ORIGINAL r.x

.