ML20002C374

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 801001-1101
ML20002C374
Person / Time
Site: Clinton 
Issue date: 11/10/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20002C370 List:
References
50-461-80-23, NUDOCS 8101100189
Download: ML20002C374 (1)


Text

- _.. _

_ =

Appendix A 10TICE OF VIOLATION i

Illinois Power Company Docket No. 50-461 Based on-the results of the NRC inspection conducted October 1 -

November 1,1980, it appears that certain of your activities were not conducted in full compliance with NRC requirements as noted below. This item is an infraction.

10 CFR 50 Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures,.....and shall be accomplished in accordance with these instructions, procedures, or drawings.

Baldwin Associates' Rigging, Hoisting and Handling Procedure BAP i

2.11 PCR 95 A-80 Note #2 of Para. 5 1.1 states: _ "Under no circum-stances shall rigging or hoisting be attempted off of Safety Related equipment or piping. Exceptions to the above must be approved by the Architect Engineer and the Owner (in writing) prior to the initia-4 tion of the work.

1 Contrary to the above, installation of the inclined fuel transfer tube was perfomed using the containment polar crane beam as a load-carrying support. Architect Engineer written approval or engineering calculations / rationale were not obtained prior to the rigging and load application.

i i

n 8101 y gg(

%+-,

w--w

-_m+

y--

r e

^

E'-S 9'

8""

P-

"4-t7 f

$