s

((d 56-SW1 k

L AlabamaPower mo scwen e ec:re system P. O. Drawer 470 Ashford, AL 36312 December 9, 1980 FNP-80-1593 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

This is to confirm the telephone call to Robert Martin (NRC) at 1510 on December 9, 1980 by Mr. W. G. Hairston, III (APCo).

As a result of evaluations required by IE Bulletin 80-11, an investigation has determined that some drviations from design exist in Unit 2 Auxiliary Building concrete block walls (i.e., some vertical reinforcing and accompanying grout was omitted).

An evaluation is in progress to determine for Units 1 and 2 the extent and consequences of these deviations. This condition is being reported under the potential applicability of Technical Specification 6.9.1.12.i.

Additional detailm will be provided in the followup report.

Sincerely yours, sd.b kIwskW W. G. Hairston, III Plant Manager Joseph M. Farley Nuclear Plant WGH/IDel:jpd cc:

H. O. Thrash R. D. Hill PQAE File 81010 9 09Se c co