ML20002C245

From kanterella
Jump to navigation Jump to search
Submits Daily Staff Notes for 801212
ML20002C245
Person / Time
Issue date: 12/15/1980
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ahearne J, Gilinsky V, Hendrie J
NRC COMMISSION (OCM)
References
NUDOCS 8101090764
Download: ML20002C245 (3)


Text

k oR:,+

- -,-. m f

k UNITED STATES yIpg 58 f;

g NUCLEAR REGULATORY COMMISSION I

E"

'?j WASHINGTON. D. C. 20555

\\

/

December 15, 1980 MEMORANDUM FOR: Chaiman Ahearne Comissioner Gilinsky Comissioner Hendrie Comissioner Bradford FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DAILY STAFF NOTES, DECEMBER 12, 1980

_IE l.

Nuclear Fuel Services, Inc., Erwin, Tenn. - Unplanned Release of Airborne Radioactivity. Within Regulatory Limits, (PNG-II-80-173).

2.

United Nuclear Corp. - Naval Products, Montville, Conn. - Bomb Threat,(PNS-I-80-26).

t r,..

T.

'B'10109 0%4

\\f

-REGION I PLANT STATUS-12/12/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART

% POWER __DOWN. _________

nATF BEAVER VALLEY 1 88 i

ASCENDING AT 3%/HR CALVERT CLIFFS 1 1

X

REFUELING I 12/15 CALVERT CLIFFS 72 COASTING DOWN FITZPATRICK 99 i

I GINNA i 100 I

I t

HADDAM NECK 100 1

INDIAN POINT 2 I

X

! REFUELING AND REPAIR FAN 6/81 1

COOLERS INDIAN POINT 3 1

1 X

l MAINTENANCE ON RCP MAINE YANKEE I

X

REPLACE 2 RCP SEALS t

MILLSTONE 1 1

1 X

! DEFU.ILED 1

1/13 MILLSTONE 2 8 100 1

i NINE MILE POINT 1 I

92 1

COAST DOWN OYSTER CREEK 97 PEACH BOTTOM 2 l 100 I

PEACH BOTTOM 3

100 i

PILGRIM 1 1 100 SALEM 1 X

CHARGING PUMP AND TESTING

! 12/13 SALEM 2 X

AWAITING LICENSE THREE MILE ISLAND 1 l

X

NRC ORDER THREE MILE ISLAND '

-X

! NRC ORDER VERMONT YANKEE X

i REFUELING I 12/22 YANKEE ROWE I 100 1

REGION II PLANT STATUS-12/12/80 Pt. ANT NAME PLAN 1 '$TATUS REASON OR COMMENT RESTART

_% POWE.A_ DOWN

_. ~ - -

_DATE__

BROWNS FERRY 1 1

99 i

i BROWNS FERRY 2 1

9.9 BROWNS FERRY 3 I

I X

REFUELING i

1/9

  • BRUNSWICK 1 9)
CORE EVALUATION
  • BRUNSWICK 2 1

6 i

i BUILDING UP i

1 CRYSTAL RIVER 3 74

CONDENSOR SALT WATER LEAK

( FARLEY 1 X

RELOADING 3/1

'14ATCH 1 15 I

I COMING UP FROM MANUAL SCRAM DUE TO FAILURE OF TURBINE CONTROL SYSTEM i

HATCH 2 X

REFUELING 1

3/1 NORTH ANNA 1 68 I COAST DOWN

  • NORTH ANNA 2 1

73 1

GENERATOR CHECKS OCONEE 1

! 100 i

OCONEE 2 1 100 i

OCONEE 3 X

REFUELING ROBINSON 2 I

I X

i STARTUP 1 12/12 SEQUOYAH 1 I

I X

l "OLD SHUTDOWN - MAINTENANCE

12/16 ST. LUCIE 1

! 100 SURRY 1 X

l S.

G.

REPLACEMENT 8/81 SURRY 2 100 1

TURKEY POINT 3

! 100 i

TURKEY POINT 4 X

! REFUELINO 1/1S e

'O REGION III PLANT STATUS-12/12/CO PLANT NAME PLANT STATUS REASON OR COMMENT RESTART POWER __DOWN

___DATE__

EIG ROCK POINT X

REFUELING 1/7 COOK 1
100 zCOOK

X

HOT STANDBY-STARTUP AT 1000 AFTER TRIP DUE TO LOW CONDENSOR VACUUM DAVIS-BESSE 1 54 i
RC PUMP SEAL AND FW PUMP DOWN DRESDEN 1 X
CHEMICAL CLEANING INDEF 1tDRESDEN 2 X
COMING UP AT 1500 AFTER HI-HI ALARM ON SCRAM DISCHARGE VOLUME REQUIRED MANUAL TRIP DURING U T DRESDEN 3

! 100 DUANE ARNOLD

100 KEWAUNEE
100 LACROSSE X
REFUELING 1/31 LASALLE X
AWAITING LICENSE MONTICELLO l 100 l-l PALISADES 4
HOLDING VACUUM PROBLEMS
12/12 POINT BEACH 1 X
REFUELING 12/05 POINT BEACH 2 100 PRAIRIE ISLAND 1

! 100 PRAIRIE ISLAND 2

100 C!UAD CITIES 1 X
REFUELING
12/21

= QUAD CITIES 2 3

! COMING UP AFTER REACTOR TRIP

! 12/12 DUE TO SPURIOUS SIGNAL CAUSING MSIV CLOSURE ZION 1 9"

IION 2 94 REGION IV PLANT STATUS-12/12/80 FLANT NAME PLANT STATUS REASON OR COMMENT RESTART

.______________________% POWER __DOWN________________________

_ _ ___DATE__

ARKANSAS 1 71

! 3 PUMPS LIMITI LEAKING PUMP "RKANSAS 2 X

FEED PUMP REPAIR
12/14 COOPER 98 CORT CALHOUN 75 ADMINISTRATIVE CONTROL (FUEL 1

CONSERVATION)

+ ORT ST. VRAIN 42 TESTING

12/15 REGION V PLANT STATUS-12/12/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART

.-=____________%

POWER __DOWN-

________DATE__

DIABLO CANYON X

. AWAITING LICENSE RANCHO SECO 100 iAN ONOFRE X
STEAM GENERATOR TUBE REPAIR 4/16 TROJAN
100

+ - REASON OR COMMENT HAS CHANGED IN PAST 24 HOURS

  1. - REACTOR SCRAM WITHIN PAST 24 HOURS

'JC TE - REACTOR STATUS DATA COLLECTED BETWEEN 6 A.

M.

AND 8 A.

M.

EACH DAY EXCEPT HOLIDAYS AND WEEKENDS

.... _.