Submits Daily Staff Notes for 801215
ML20002B984
Person / Time
Issue date: 12/16/1980
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ahearne J, Gilinsky V, Hendrie J
NRC COMMISSION (OCM)
References
NUDOCS 8101070488
Download: ML20002B984 (5)


Text

{{#Wiki_filter:. _ _ - _ C,# Af Af * [ T[4/Il8#II og UNITED STATES NUCLEAR REGULATORY COMMISSION e e -{(p ,E wAsmNGToN. D. C. 20686 %.,y.* December 16, 1980 D**D

  • D %f

. 3 . 1 _a

Wo s

J MEMORANDUM FOR: Chain:an Ahearne M Commissioner Gilinsky 7. Comissioner Hendrie o Commissioner' Bradford g:4] gjg n a FROM: William J. Dircks, Executive Director for Operationsg -ci

SUBJECT:

DAILY STAFF NOTES, DECEPEER 15, 1980 .I E. 1. Nuclear Metais Inc., Concord, Mass. - Employee Contaminated iith Desiteted Uranium in the Form of Green Salt (U F4), (PNO-I-80-173). 2. D. C. Cook Unit 2 - Fire in Main Ger,erator Exciter, (PNO-III-80-23C). Donald C. Cook Nuclear' Power Plant - Telephone Bomb Threat, (PNS-III-80-21). 3. NRR Salem Unit 2 The licensee has notified us that there will be a significant delay in the conduct of an emergency r' '11. The original schedule called for a drill to be conducted on Ja..sary 26, 1981. However, at a recent meeting with representatives of FEMA, the State of New Jersey and the State of Delaware, the' licensee was infonned by the New Jersey represent-atives that they expect a 6-8 week slip in their schedule in order to obtain approval of the governor. In addition, FEMA representatives infonned the licensee that their review of the scenario to be exercised will require about three weeks longer than the licensee had anticipated. Based on this infonnation, the licensee currently expects that an emergency drill would not be.cenduc-tsd4efore April 1981. Pilorim Unit 1 By teleccpyon December 11, 1980, Boston Edison provided a copy of their request for a hearing dated December 4,1980 on the staff's Orders of October 24, 1980 regarding the Environmental Qualification of Safety-Related Electrical Equipment. 8101070 i I 7

REGION I PLANT STATUS-12/15/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART -_____________________ _% POWER __DOWN_________ --________DATE__ BEAVER VALLEY 1 1 95 I CALVERT CLIFFS 1 I X

REFUELING

! 12/15 CALVERT CLIFFS 2 68 i ! COASTING DOWN I

  1. FITZPATRICK 89 I

i ASCENDING AFTER ROD SWAP t GINNA I 100 I i HADDAM NECK' i 100 1 INDIAN POINT 2 1 X ! REFUELING AND REPAIR FAN 6/81 I COOLERS I INDIAN POINT 3 i X i MAINTENANCE ON RCP 1 MAINE YANKEE I X STARTING BACK UP 1 MILLSTONE 1 1 X ! DEFUELED 1/15 MILLSTONE 2 1 100 I I

  • NINE MILE POINT 1 i

82 i INCREASING POWER SINCE ROD 1 1 CHANGE I

  • OYSTER CREEK I

94 ASCENDING AFTER REPAIR OF i RELIEF VALVE ON FW HEATER 1 FEACH BOTTOM 2 100 PEACH BOTTOM 3 1 100 t ,1 i PILGRIM 1 ! 100 SALEM 1 1 1 X ! TESTING SAFETY VALVES SALEM 2 i i X ! AWAITING LICENSE I THREE MILE ISLAND 1 1 I X ! NRC ORDER THREE MILE ISLAND 2 i i X i NRC ORDER I VERMONT YANKEE I i X i REFUELING I 12/22 YANKEE ROWE

100 I

1 REGION II PLANT STATUS-12/15/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART % POWER __DOWN____________________________________DATE__ BROWNS FERRY 1 98 I BROWNS FERRY 2 99 l l BROWNS FERRY 3 i i X REFUELING l 1/9 i BRUNSWICK 1 1 95 l l BRUNSWICK 2 70 INCREASING POWER i CRYSTAL RIVER 3 ! 100 1 I l FARLEY 1 i X

RELOADING 1

3/1 HATCH 1 1 74

INCREASING POWER HATCH 2 l

X

REFUELING 3/1 NORTH ANNA 1 i

67 I. ! COAST DOWN NORTH ANNA 2 ! 100 t I l OCONEE 1 1 100 t I OCONEE 2 1 100 I OCONEE 3 X i REFUELING i l

  • ROBINSON 2 1

48

HOLDING DUE TO WASTE WATER I

CAPACITY LIMIT l

  • SEQUOYAH 1 30 i

! BACK ON LINE 0141 TODAY l ST. LUCIE 1 100 't i l SURRY 1 I X i S. G. REPLACEMENT I 8/81 SURRY 2 ! 100 I l TURKEY POINT 3 1 100 1 1/15 l TURKEY POINT 4 1 1 X ! REFUELING i I

REGION III PLANT STATUS-12/15/80 P.LANT'NAME PLANT STATUS REASON OR COMMENT RESTART -________ ____ ______ __% POWER _DOWN ________________ _______ _ _ --- EIG ROCK POINT t X

REFUELING

- DATE_ COOK 1 1/7 i 100 i oCOOK 2 X i BURNED UP GENERATOR EXCITER i DAVIS-BESSE 1 i 55 I

RC PUMP SEAL AND FW PUMP DOWN I

DRESDEN 1 I l' X i CHEMICAL CLEANING l INDEF

  • DRESDEN 2 50 1
COAST DOWN DRESDEN 3 95 1

DUANI ARNOLD i 100 t i 1 i KEWAUNEE

100 1

LACROSSE I i X

REFUELING LASALLE i

X

AWAITING LICENSE I

1/31 MONTICELLO i 100 I I ePALISADES I 50 1

LIMITED BY CONDENSER VACUUM I

POINT BEACH 1 I X i REFUELING 12/25 POINT BEACH 2 1 100 PRAIRIE ISLAND 1 1 100 I PRAIRIE ISLAND 2 l 100 t OUAD CITIES 1 i I X REFUELING

  • CUAD CITIES 2 1

81 i i INCREASING POWER SINCE !: 12/21 REACTOR TRIP

  • ZION 1 56 1 DELUTION WATER CAPACITY ON RAD WASTE ZION 2 1

93 1

HEATER STRINGS REGION IV PLANT STATUS-12/15/80 PLANT NAME PLANT STATUS REASON OR COMMINT

______% POWER-_DOWN_ _._ _____ ___ _____ ___._ ____ RESTAR ARKANSAS 1 1 73 i 3 PUMPS LIMITi LEAKING PUMP t _DATE_ ARKANSAS 2 X i FEED PUMP REPAIR COOPER I 100 t t FORT CALHOUN 75 I i ADMINISTRATIVE CONTROL (FUEL i I CONSERVATION) FORT ST. VRAIN 60 1 ! INCREASI'NG POWER AFTER i i TESTING FLUCTUATIONS I REGION V PLANT STATUS- _____12/15/80 PLANT NAME PLANT STATUS REASON OR COMMENT __% POWER __DOWN ___ RESTART _DATE DIABLO CANYON i X

AWAITING LICENSE I

RANCHO SECO ! 100 5AN ONOFRE X. I STEAM GENERATOR TUBE REPAIR i 4/16 TROJAN ! 100 > - REASON OR COMMENT HAS CHANGED IN PAST 24 HOURS 3 - REACTOR SCRAM WITHIN PAST 24 HOURS DOTE - REACTOR STATUS DATA COLLECTED BETWEEN 6 A. M. AND 8 A. M. EACH DAY EXCEPT HOLIDAYS AND WEEKENDS ~ 9 8

REGION III PLANT STATUS-12/16/80 PLANT NAME PLANT STATUS REASON OR COMMENT ~ RESTART ______________% POWER __DOWN_______ - - __DATE__ BIG ROCK POINT i X

REFUELING 1/7 COOK 1 i 100 1

I

  • COOK 2 35 t

! GENERATOR EXCITER REPLACED, INCREASING POWER I DAVIS-BESSE 1 i 54 1 RC PUMP SEAL AND FW PUMP DOWN i DRESDEN 1 1 I X ! CHEMICAL CLEANING 1 INDEF DRESDEN 2 47 I I COAST DOWN t DRESDEN 3 i 99 I DUANE ARNOLD i 99 i KEWAUNEE I 100 I I LACROSSE X 1 REFUELING l 1/31 LASALLE I X ! AWAITING LICENSE MONTICELLO

100 t

i PALISADES 43 1 LIMITED BY CONDENSER VACUUM POINT BEACH I l X REFUELING ! 12/25 POINT BEACH 2 i 100 I i

  • FRAIRIE ISLAND 1 1

90 I AXIAL OFFSET TEST IN PROGRESS I PRAIRIE ISLAND 2

100 1

1 OUAD CITIFS 1 i X i REFUELINO

12/21 OUAD CITIES 2 i

90 t

INCREASING POWER SINCE REACTOR TRIP
  • ZION 1 1

83 1 LIMITED BY RAD WASTE I ZION 2 i 93 ! LP HEATER STRING LIMITED REGION IV PLANT STATUS-12/16/80 PLANT NAME PLANT STATUS REASON OR COMMENT. RESTART. _ _% POWER __DOWN______.________.__________ ______DATE__ l ARKANSAS 1 1 72 I I 3 PUMPS LIMITt LEAKING PUMP ARKANSAS 2 i X ! HEATING UP NOW TO HOT STANDBY COOPER 99 i i I FORT CALHOUN 75 ! ADMINISTRATIVE CONTROL (FUEL CONSERVATION) i

  • FORT ST. VRAIN 5

1

SHUTTING DOWN l

l REGION V PLANT STATUS-12/16/80 l PLANT NAME PLANT STATUS REASON OR COMMENT RESTART POWER __DOWN-ATE __ D DIABLO CANYON l X

AWAITINO LICENSE I

i RANCHO SECO ! 200 i SAN ONOFRE i X i STEAM GENERATOR TUBE REPAIR 4/16 TROJAN

100 l

I I - REASON OR COMMENT HAS CHANGED IN PAST 24 HOURS l 9 - REACTOR SCRAM WITHIN PAST 24 HOURS I NOTE - REACTOR STATUS DATA COLLECTED BE1 WEEN 6 A. M. AND 8 A. M. EACH DAY EXCEPT l HOLIDAYS AND WEEKENDS 1 l l l l

REGION I PLANT STATUS-12/16/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART _% POWER _DOWN_______---__- - DATE_. EEAVER VALLEY 1 ! 100 I CALVERT CLIFFS 1 1 X ..FUELINO I 12/15 CALVERT CLIFFS 2 66 i COASTING DOWN I FITZPATRICK i 100 1 GZNMA 100 I HADDAM NECK

100 1

1 INDIAN POINT 2 X

liEFUELING AND REPAIR FAN 6/81 1

1 COOLERS I INDIAN POINT 3 I i X MAINTENANCE ON RCP t MAINE YANKEE I I X CHECKING FOR POSSIBLE SEAL I i PROBLEMS MfLLSTONE 1 X

DEFUELED i

1/15 MILLSTONE 2 1 100 I I I NINE MILE POINT 1 i 80 i

PRECONDITIONING OYSTER CREEK 96 I

I I PEACH BOTTOM 2 l 100 1 PEACH BOTTOM 3 ! 100 i PILGRIM 1 ! 100 t I SALEM 1 X ! REFUELING 1 SA_EM 2 X

AWAITING LICENSE I

THREE MILE ISLAND 1 X

NRC ORDER THREE MILE ISLAND 2 X
NRC ORDER I

VERMONT YANKEE X X REFUELING 12/22 YANKEE ROWE I 100 i REGION II PLANT STATUS-12/16/80 PL N NAME PLANT STATUS REASON OR COMMENT RESTART POWER _ DOWN____.- ._ ___DATE_ BROWNS FERRY 1 98 1 BROWNS FERRY 2 1 99 l l BROWNS FERRY 3 X

REFUELINO I

1/9 45RUNSWICK 1 92 1

ROD PATTERN CHANGE - NEW i

i FILTERS ON CONDENSATE TRAIN BRUNSWICK 2 1 77 i

INCREASING POWER CRYSTAL RIVER 3 l 100 I

I FARLEY 1 I l X ! RELOADINO - HEAD STILL OFFi I 3/1 i INTERNALS IN PLACE HATCH 1 80 l 1 CONSERVING FUEL i HATCH 2 1 X

REFUELING 1

3/1 NORTH ANNA 1 65 . : COAST DOWN i NORTH ANNA 2 i 100 l OCONEE 1 ! 100 i i OCONEE 2 i 100 I OCONEE 3 i X ! PEFUELING l ROBINSON 2 67 ! INCREASING 2% PER HOUR DUE TO I WASTE WATER LIMIT I-SEQUOYAH'l I 38 l POWER AECENSION TO 75% AT 0500 ST. LUCIE I i 100 i I SURRY 1 X ! S. G. REPLACEMENT s/81 EURRY 2 ! 100 i i i TURKEY POINT 3 i 100 i t TURKEY POINT 4 I i X ! REFUELING !: 1/15 ---}}