Forwards Format for Submitting Input to Mgt Info Ctr.Similar Info Should Be Submitted by One Operating Reactors Branch by 801008 for Inclusion in Pilot Program
ML20002B708
Person / Time
Issue date: 09/26/1980
From: Thompson H
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8012220516
Download: ML20002B708 (2)


Text

_ _

g.. ~ - w - e p %,. y e p g,. g g,,-

y y.,7 r

m 3Ep 51980 MEMORANDUM FOR: Darrell G. Eisenhut, Director Division of Licensing FRCN:

Hugh L. Thompson, Jr., Acting Director Planning & Program Analysis Staff W

SUBJECT:

INPUT TO NRR INFORMATION CE. ER At the request of Harold Denton, MPA is assisting us in establishing a managenent infomation center for NRR initially to be located in P-422.

The objective of the center is to track current status and key parameters of major program elments (e.g., casework and operating reactors) for the purposes of managenent infomation and control. For operating reactors, the initial proposal is that the infonsation center will include an individual chart (or board) for each operating unit.

In this regard, MPA has proposed a fomat for displaying management infomation on operating reactors, as shnwn in the enclosure for Turkey Point 3.

Recognizing that the effort to keep this infomation current will be time consuming, Mr. Denton has requested that a pilot program be set up involving only one of the operating reactors branches. Therefore, we request that you select one operating reactors branch and provide similar infomation for each of its assigned plants. In this regard, any changes to the fomat (content and fonn) which you or your staff wish to make to enhance it as a managenent tood should be identified.

Please advise me by October 3,1980 as to which branch (and plants) have been selected and provide the infomation for the pilot program by October 8,1980.

Infomation 46 each plant should be sent to Manny Licitra in P-414.

Original signedbx

)

l Hugh L. Thompson, Acting Director Planning & Program Analysis Staff

Enclosure:

Distribution CM As stated CentralFileb f

@3 RSB Rdg.

l cc:

H. Denton H. Thompson l

E. Case

'.4 H. Berkow W. Pike 801223o y! f s

J %

l S. Boyd l

E. Licitre CFFicE h.

on. [

suasavef.. elk

.HTbh h....

et!.

oare >l.. 9/d/80.

.j.

9M//.80

.[

l, j

aac reau 3 3,,,-rei sacv 324-

,s ccyeos-tsr

..st,sc c,,,ct,i,,,2a,-363

a Enclosure TURKEY POINT 3 Project Manager:

M. Grotenhuis Resident Inspector:

R. J. Vogt-Lowell Reactor Type: PWR (Westinghouse)

Emergency Plan: Approved 6/19/80 (Florida) i OPERATING STATUS:

(as of

)

Operation

% Power.

Shutdown scheduled 10/5-11/1 for steam generator tube inspection.

LICENSING STATUS:

Hearing Initiated 8/7/79 re steam generator repair

  • draft EIS 10/15/80 Orders / Exemptions: None MAJOR ISSUES:

In-service inspection and testing (resolution of staff position) + 2 years.

Recent denial of 2.206 petition to not allow continued operation (steam generator problem).

Fire protection SER (10/15/80) Suppl. No.1 (previous problems to be resolved - new rule).

  • Potential Problems: Rad assessment and ALARA.

Appendix I implenentation (needs branch input on meteorology)

LICENSING AC110NS:

No. Completed in FY 80 No, received in FY 80 Current backlog r

ee--

ese -

<a*

- - -<~ - - - - - - -

-e---+y--

e 4

ee-w w^

-*,---+---+-e<'

-e g

---*-r,--=,,,e

--e=-

e -