Category:Inspections
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:Tests
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:Analyses
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:and Acceptance Criteria (ITAAC)
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ML22178A0902022-06-27027 June 2022 ITAAC Review Status Report 6-27-2022 ML22167A0222022-06-16016 June 2022 ITAAC Review Status Report 6-16-2022 ML22165A0752022-06-14014 June 2022 ITAAC Review Status Report 6-14-2022 ML22165A0762022-06-14014 June 2022 ITAAC Review Status Report 6-14-2022 ML22116A0362022-04-26026 April 2022 ITAAC Review Status Report 4-26-2022 ML22026A0562022-01-26026 January 2022 ITAAC Review Status Report 1-26-2022 ND-22-0041, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load2022-01-18018 January 2022 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load ML21336A5752021-12-0909 December 2021 Update to Targeted Inspections, Tests, Analyses, and Acceptance Criteria for Vogtle Electric Generating Plant Units 3 and 4 ML21342A3042021-11-0202 November 2021 Attachment 1 - Vogtle Units 3 & 4 ITAAC - November 2021 ML21342A3052021-11-0202 November 2021 Attachment 2 - Vogtle Units 3 and 4 ITAAC - November 2021 ND-21-0916, Resubmittal of ITAAC Closure Notification on Completion of 2.5.05.03b (Index Number 570)2021-10-20020 October 2021 Resubmittal of ITAAC Closure Notification on Completion of 2.5.05.03b (Index Number 570) ND-21-0610, Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02a.ii.e (Index Number 768)2021-07-0101 July 2021 Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02a.ii.e (Index Number 768) ML21123A0352021-05-0303 May 2021 ITAAC Review Status Report 5-3-2021 ND-21-0241, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.01 (Index Number 183)2021-03-15015 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.01 (Index Number 183) ND-21-0242, Notice of Uncompleted ITAAC 225-clavs Prior to Initial Fuel Load Item 2.2.03.08c.iv.03 (Index Number 185)2021-03-15015 March 2021 Notice of Uncompleted ITAAC 225-clavs Prior to Initial Fuel Load Item 2.2.03.08c.iv.03 (Index Number 185) ND-21-0155, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.02 (Index Number 184)2021-03-11011 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.02 (Index Number 184) ND-21-0143, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iii (Index Number 182)2021-03-0909 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iii (Index Number 182) ND-20-1108, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.03.02 (Index Number 319)2021-03-0909 March 2021 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.03.02 (Index Number 319) ML21061A2162021-03-0303 March 2021 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 & 4, NRC Report 05200025/2020006 and 05200026/2020006 ML21032A2602021-02-0101 February 2021 ITAAC Status Report 2-1-2021 ML21032A2652021-02-0101 February 2021 ITAAC Status Report 2-1-2021 ML21004A1102021-01-0404 January 2021 ITAAC Status Report 1-4-2021 ML21277A0512020-11-0404 November 2020 Archives, Closed in Report (NCV) ND-20-1246, Supplement for API 000 ITAAC 2.3.05.03a.ii (Index Number 344) Completion2020-10-27027 October 2020 Supplement for API 000 ITAAC 2.3.05.03a.ii (Index Number 344) Completion ML20281A3832020-10-0101 October 2020 ITAAC Status Report 10-1-2020 ML20281A3952020-10-0101 October 2020 ITAAC Status Report 10-1-2020 ND-20-0002, Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA)2020-01-28028 January 2020 Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA) ND-20-0023, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02f (Index Number 774)2020-01-21021 January 2020 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02f (Index Number 774) ND-19-1536, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.08b.ii (Index Number 543)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.08b.ii (Index Number 543) ND-19-1571, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.04.02.1 (Index Number 557)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.04.02.1 (Index Number 557) ND-19-1538, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.09d (Index Number 548)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.09d (Index Number 548) ND-19-1523, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530)2019-12-19019 December 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530) ND-19-1537, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.1la.ii (Index Number 47)2019-12-19019 December 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.1la.ii (Index Number 47) ND-19-1460, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09a (Index Number 41)2019-12-0202 December 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09a (Index Number 41) ND-19-1263, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.01.04e (Index Number 588)2019-11-25025 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.01.04e (Index Number 588) ND-19-1348, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.a (Index Number 760)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.a (Index Number 760) ND-19-1349, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.b (Index Number 761)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.b (Index Number 761) ND-19-1351, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.d (Index Number 763)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.d (Index Number 763) ND-19-1353, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.02.14 (Index Number 317)2019-11-0606 November 2019 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.02.14 (Index Number 317) ND-19-1333, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.i (Index Number 75)2019-10-31031 October 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.i (Index Number 75) ND-19-1323, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530)2019-10-31031 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530) ND-19-1309, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.02.07a.iii (Index Number 137)2019-10-31031 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.02.07a.iii (Index Number 137) ND-19-1324, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.06.03.1 (Index Number 726)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.06.03.1 (Index Number 726) ND-19-1330, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.29.02 (Index Number 489)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.29.02 (Index Number 489) ND-19-0920, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.03 (Index Number 716)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.03 (Index Number 716) ND-19-1311, Unit 4 - Resubmittal Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.10 (Index Number 549)2019-10-28028 October 2019 Unit 4 - Resubmittal Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.10 (Index Number 549) ND-19-1047, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.03.02 (Index Number 555)2019-10-28028 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.03.02 (Index Number 555) ND-19-1316, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.3.8.02.01 (Index Number 843)2019-10-28028 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.3.8.02.01 (Index Number 843) 2023-07-30
[Table view] Category:Letter type:ND
MONTHYEARND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0046, (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance2024-03-18018 March 2024 (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance ND-24-0059, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] |
Text
IVIichael J. Yox 7825 River Road
^Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tei JAN 0 2 2020 Docket Nos.: 52-025 52-026 ND-19-1536 10CFR 52.99(c)(3)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.5.02.08b.ii [Index Number 5431 Ladies and Gentlemen:
Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of December 18, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.5.02.08b.ii
[Index Number 543] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
Southern Nuclear Operating Company(SNC) previously submitted Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load for Item 2.5.02.08b.ii [Index Number 543] ND-19-1122
[ML19267A213], dated September 24, 2019. This resubmittal supersedes ND-19-1122 in its entirety.
This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.
All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).
This letter contains no new NRC regulatory commitments.
If there are any questions, please contact Tom Petrak at 706-848-1575.
Respectfully submitted.
Michael J. Yc ,
Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.5.02.08b.ii [Index Number 543]
MJY/CWM/sfr
U.S. Nuclear Regulatory Commission ND-19-1536 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)
Mr. D. L. McKlnney (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones(w/o enclosures)
Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)
Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Mr. C. Santos Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen
U.S. Nuclear Regulatory Commission ND-19-1536 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani (w/o enclosures)
Mr. D. 0. Durham (w/o enclosures)
Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. S. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Bianton, Baich Bingham
U.S. Nuclear Regulatory Commission ND-19-1536 Enclosure Page 1 of 5 Southern Nuclear Operating Company ND-19-1536 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.5.02.08b.ii [Index Number 543]
U.S. Nuclear Regulatory Commission ND-19-1536 Enclosure Page 2 of 5 ITAAC Statement Desion Commitment 8.b) The RMS provides for the transfer of control capability from the MCR to the RSW using multiple transfer switches. Each individual transfer switch is associated with only a single safety-related group or with nonsafety-related control capability.
Inspections/Tests/Analvses ii) An operational test of the as-built system will be performed to demonstrate the transfer of control capability from the MCR to the RSW.
Acceptance Criteria ii) Actuation of each transfer switch results in an alarm in the MCR and RSW,the activation of operator control capability from the RSW, and the deactivation of operator control capability from the MCR for the associated safety-related division and nonsafety-related control capability.
ITAAC Completion Description Multiple ITAAC are performed to ensure that the Protection and Safety Monitoring System (PMS) provides for the transfer of control capability from the Main Control Room (MCR)to the Remote Shutdown Workstation(RSW) using multiple transfer switches. Each individual transfer switch is associated with only a single safety-related group or with non-safety-related control capability. The subject ITAAC requires that an operational test of the as-built system will be performed to demonstrate the transfer of control capability from the MCR to the RSW.
This ITAAC is performed to verify, by testing, that activation of each PMS transfer switch results in an alarm in the MCR and RSW. This ITAAC also verifies the activation of the operator control capability from the RSW and the deactivation of the operator control capability from the MCR for the associated safety-related division and nonsafety-related control capability.
ITAAC 2.5.02.08b.ii is completed as a combination of;
- Factory Acceptance Test- Functional testing of the transfer of controls from the MCR to the RSW including operator control capability from the RSW and deactivation of control from the MCR
- Component Test- Testing of switches in the MCR, RSW,and MCR/RSW Transfer Panel to verify proper wiring and correct digital input is received
- Site software installation and regression test- Hardware and software integration verification and testing of post system delivery changes The Factory Acceptance Testing (FAT)follows the guidance of NEI 08-01 Section 9.4 (Reference 36)for the as-built tests to be performed at other than the final installed location.
The FAT was performed in accordance with PMS Software Program Manual WCAP-16096 (Reference 1), PMS Test Plan APP-PMS-T5-001 (Reference 2)and applicable Codes and
U.S. Nuclear Regulatory Commission ND-19-1536 Enclosure Page 3 of 5 Standards described in Vogtle 3 and 4 Update Final Safety Analysis Report(UFSAR)Chapter 7 (Reference 26).
The FAT included testing of RMS inputs and outputs, logic, and functionality. During this test, the initial conditions for the test scenarios are established and process parameters are simulated to get the expected outputs.
The test initially confirms that an alarm signal is generated when process parameters are simulated for each transfer switch placed in the Remote Shutdown Room (RSR) ENABLE position. The test procedure used for this testing is RMS Miscellaneous Test Procedure SV3/4-RMS-T1R-034(References 3 and 4). The results of the testing are documented in the FAT Test Report SV3/4-RMS-T2R-034(References 5 and 6).
The test continues with all transfer switches simulated in the RSR ENABLED position. During this portion of the test, the process parameters are simulated to confirm the operator control capability is transferred from the MCR to the RSW and all MCR operator control capability is deactivated. The multiple test procedures that are used for this testing are RMS Channel Integration Test Procedures SV3/4-RMS-T1R-007(References 7 and 8), SV3/4-RMS-T1R-008 (References 9 and 10), and SV3/4-RMS-T1R-018 (References 11 and 12). The results of the testing are documented in the FAT Test Reports SV3/4-RMS-T2R-007(References 13 and 14),
SV3/4-RMS-T2R-008 (References 15 and 16), and SV3/4-RMS-T2R-018 (References 17 and 18).
Site testing of each switch is performed to verify the switch is properly wired and the correct digital input is received. This test places each switch in the MCR, RSW, and MCR/RSW Transfer Panel in all switch positions and verifies proper indicating lights are received in computer cabinets. Unit 3 component test package work orders 1054772, 1058836, and 1060105 (References 20, 21, and 22) and Unit 4 component test package work orders SNCXXXXXX, SNCYYYYYY, and SNCZZZZZZ(References 23, 24, and 25) document completion of switch position testing portion of this ITAAC.
Additional hardware and software installation and associated inspections and testing are performed on-site to verify that the cabinets are intact and functional in accordance with Units 3 and 4 for applicable Field Change Notifications(FCNs)API000 Vogtle Unit 3 RMS Initial Software Installation - Software Release 8.7.0.1 and AP1000 Vogtle Unit 4 RMS Initial Software Installation - Software Release 8.7.0.1, and B-GEN-ITPCI-001 (References 27, 28, and 19).
References 27, 28, and 19 include steps that confirm and document successful software load and further confirm the physical properties of the as-built RMS. The Field Change Notifications are implemented using Unit 3 component test package work order SNCAAAAAA and Unit 4 component test package work order SNCBBBBBB (References 29 and 30). A regression analysis (i.e., change evaluation) is performed post-delivery for hardware changes (references 31 and 32) and software changes (Reference 33) if additional testing is needed for the as-built system.
The completed Unit 3 and Unit 4 FAT (References 5, 6, and 13 through 18), switch testing (References 20 through 25), FCNs (References 27 through 30), B-GEN-ITRCI-001 (Reference 19), and regression test results (References 31 through 33) confirm actuation of each transfer switch results in an alarm in the MCR and RSW,the activation of operator control capability from the RSW, and the deactivation of operator control capability from the MCR for the associated safety-related division and nonsafety-related control capability.
U.S. Nuclear Regulatory Commission ND-19-1536 Enclosure Page 4 of 5 References 5, 6, 13 through 18, and 20 through 25 are available for NRG Inspection as part of the ITAAC 2.5.02.08b.ii Unit 3 and 4 Completion Packages (References 34 and 35).
List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.
References(available for NRG inspection^
- 1. WCAP-16096 "Software Program Manual for Common Q Systems"
- 2. APP-PMS-T5-001 "API000 Protection and Safety Monitoring System Test Plan"
- 3. SV3-PMS-T1P-034,"API000 Protection and Safety Monitoring System Maintenance and Test Panel Miscellaneous Test Procedure"
- 4. SV4-PMS-T1 P-034,"API000 Protection and Safety Monitoring System Maintenance and Test Panel Miscellaneous Test Procedure"
- 5. SV3-PMS-T2R-034,"API000 Protection and Safety Monitoring System Maintenance and Test Panel Miscellaneous Test Report"
- 6. SV4-PMS-T2R-034,"API000 Protection and Safety Monitoring System Maintenance and Test Panel Miscellaneous Test Report"
- 7. SV3-PMS-T1P-007,"API000 Protection and Safety Monitoring System Reactor Trip Channel Integration Test Procedure"
- 8. SV4-PMS-T1 P-007,"API000 Protection and Safety Monitoring System Reactor Trip Channel Integration Test Procedure"
- 9. SV3-PMS-T1P-008 "API000 Protection and Safety Monitoring System System-Level Engineered Safety Features Channel Integration Test Procedure"
- 10. SV4-PMS-T1 P-008 "API000 Protection and Safety Monitoring System System-Level Engineered Safety Features Channel Integration Test Procedure"
- 11. SV3-PMS-T1P-018 "API000 Protection and Safety Monitoring I/O Channel Accuracy Channel Integration Test Procedure"
- 12. SV4-PMS-T1 P-018 "API000 Protection and Safety Monitoring I/O Channel Accuracy Channel Integration Test Procedure"
- 13. SV3-PMS-T2R-007,"API000 Protection and Safety Monitoring System Reactor Trip Channel Integration Test Report"
- 14. SV4-PMS-T2R-007,"AP1000 Protection and Safety Monitoring System Reactor Trip Channel Integration Test Report"
- 15. SV3-PMS-T2R-008 "API000 Protection and Safety Monitoring System System-Level Engineered Safety Features Channel Integration Test Report"
- 16. SV4-PMS-T2R-008 "API000 Protection and Safety Monitoring System System-Level Engineered Safety Features Channel Integration Test Report"
- 17. SV3-PMS-T2R-018 "API000 Protection and Safety Monitoring I/O Channel Accuracy Channel Integration Test Report"
- 18. SV4-PMS-T2R-018 "API000 Protection and Safety Monitoring I/O Channel Accuracy Channel Integration Test Report"
- 19. B-GEN-ITPCI-001,"PMS CABINETS" 20.1054772,"Perform B-GEN-ITPCI-006 for the Main Control Room & Remote Shutdown Room"
U.S. Nuclear Regulatory Commission ND-19-1536 Enclosure Page 5 of 5
- 21. 1058836,"MGR/RSR Transfer Panel" 22.1060105,"Perform component test B-GEN-ITPCI-006 for DDS"
- 23. SNCXXXXXX
- 24. SNCYYYYYY
- 25. SNCZZZZZZ
- 26. Vogtle Electric Generating Plant(VEGP) Units 3 and 4 Updated Final Safety Analysis Report(UFSAR)
- 27. Unit 3 Field Change Notice "API000 Vogtle Unit 3 PMS Initial Software Installation -
Software Release 8.7.0.1"
- 28. Unit 4 Field Change Notice "API000 Vogtle Unit 4 PMS Initial Software Installation -
Software Release 8.7.0.1"
- 29. SNCAAAAAA
- 30. SNCBBBBBB
- 31. GIC-AP1000-HEDS-19-001, Rev. 0 "Regression Testing Analysis for Vogtle Unit 3 Protection and Safety Monitoring System (PMS)Baseline 8.2 to 8.4 Hardware Modifications Performed at Site"
- 32. GIC-AP1000-HEDS-YY-XXX, Rev. X "Regression Testing Analysis for Vogtle Unit 4 Protection and Safety Monitoring System (PMS) Baseline X.X to X.X Hardware Modifications Performed at Site"(YY-XXX is the Year-Letter#)
- 33. APP-PMS-T2R-050,"API000 Protection and Safety Monitoring System Channel Integration Test Integrated System Validation Test Report"
- 34. ITAAC 2.5.02.08b.ii-U3-CP-Rev0, "ITAAC Completion Package"
- 35. ITAAC 2.5.02.08b.ii-U4-CP-Rev0, "ITAAC Completion Package"
- 36. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"