ML20002B613

From kanterella
Jump to navigation Jump to search
Informs NRC That Results from re-evaluation of Scram Discharge Sys Per IE Bulletin 80-17 & Schedule for Implementation of Any Required Mods Will Be Provided by 810115
ML20002B613
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/15/1980
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
A01203, A1203, IEB-80-17, NUDOCS 8012220123
Download: ML20002B613 (1)


Text

_ ~ _.

a NORTHEAST tmLMES

,,,n e.m o.,mo l

y*yly'y"g"**[_'

P O. Box 270 HARTFORD. CONNECTICUT 06101

.ei. maw.uum, (203) Mit L

L A MM;llll:':,"ll'llll":l December 15, 1980 l

Docket No. 50-245 A01203 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 i

Reference:

(1) W. G. Counsil letter to D. G. Eisenhet. dated October 24, 1980.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 1 BWR Scram Discharge System In Reference (1), Northeast Nuclear Energy Company (NNECO) committed to reevaluate the Millstone Unit No. 1 scram discharge system against the evaluation criteria developed by the BWR Owners' Group Ad-Hoc Committee on I&E Bulletin No. 80-17, and to submit the results of this reevaluation, along with a schedule for implementation of any required modifications, J

by December 15, 1980.

Since a NRC Generic Safety Evaluation Report (SER) regarding BWR scram i

discharge systens is presently being transmitted to all BWR licensees, NNECO feels it would be more appropriate to perform the above-mentioned reevaluation after reviewing the NRC Staff's positions represented in the Generic SER. Therefore, NNECO proposes to submit the results of-the I

reevaluation, along with a schedule for implementation of any required modifications, by January 15, 1981.

It is NNECO's understanding, after consultation with a member of your staff (John Hannon), that this is acceptable to the NRC.

If you have any quee: ions, please feel free to contact us.

Very truly yours, b

[I NORTHEAST NUCLEAR ENERGY COMPANY

=

f;

/

m*

N{ j

~

g

//, N 6I6224k 5 ',

n dD W. G. Counsil

{,

Senior Vice President hie y

[L A E S?0

,