ML20002B382

From kanterella
Jump to navigation Jump to search
Excerpt from Staff Requirements Memo Re 801114 IE Briefing Re Current Facility Status.Ofc of General Counsel Must Revise Draft Order to Include Input from Ofc of Policy Analysis
ML20002B382
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/24/1980
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Bickwit L, Hanrahan E
NRC OFFICE OF POLICY EVALUATIONS (OPE), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
REF-10CFR9.7 M801114, NUDOCS 8012110480
Download: ML20002B382 (1)


Text

..

IN RESPONSE REPLY T0: M801114 a nco

/

UNITED STATES l'

f, NUCLEAR REGULATORY COMMISSION

,,E W ASHIN GTON. D.C. 20555 bI b

November 24, 1980 c

OFFICE OF THE M

SECRETARY

]i

'U~

4 MEMORANDUM FOR

Leonard Bickwit, Jr., General Counsel 2

$h EdwardHanrahan, Director [/PolicyEvaluation l

s iG R

21 FROM:

Samuel J. Chilk, Secreta

?

I

SUBJECT:

EXCERPT OF STAFF REQUIR 1EtsT - BRIEFING BY IE'0N CURRENT STATUS OF INDIAN POINT-2 INYESTIGATION OF THE CONTAINMENT FLOODING EVENT AND BASIS FOR ALLOWING RESTART OF INDIAN P0lNT-3; AND DISCUSSION OF INSTRUCTIONS TO BOARD ON INDIAN POINT PROCEEDING, 10:00 A.M., FRIDAY, NOVEMBER 14, 1980, COMMISSIONERS' CONFERENCE ROOM, D. C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

(CONTINUED AT 2:00 P.M.)

The Comnission discussed with staff the proposed Order on Indian Point, contained in SECY-A-80-179A/179B.

The Comnission directed that the General Counsel revise the draft Order as discussed at the meeting, with the inclusion of a paragraph, to be drafted by OPE, that would serve as an alternative to paragraphs 17 and 18.

(Itwas recognized that the language of that paragraph might affect the wording of other portions of the Order.

(0GC/0PE)

(SECY Suspense:

11/24/80) cc:

Chairman Ahearne Commissioner Gilinsky Commissioner Hendrie Commissioner Bradford Commisyfon Staff Offices PDR V 8010110

@