ML20002A719

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1980
ML20002A719
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/14/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20002A720 List:
References
NUDOCS 8011210377
Download: ML20002A719 (1)


Text

~

Alabama Power Cornpany 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 F. L CLAYTON, JR.

m Senior Vice President Alabama Power the sournem e%Tc system November 14, 1980 Docket No. 50-348

.. g b.i

~

Director I- '

Office of Management luformation and f .,- -

Program Control -: i

^'

> -l U. S. Nuclear Regulatory Commission  :] _ $d b'ashington, D.C. 20555 R O  !!

G ut lE

Dear Sir:

RE: Joseph M. Farley Nucl ar Plant Unit No. 1 Monthlv Operating Data Re art Attached are two (2) copies of the October,1980 monthly operating report for Joseph M. Farley Nuclear Plant., Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Sur: mary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very GL2% )y,~L

/ F. L. Clayton, Jr.

FLCJr/JRC:bhj Attachments cc: Mr. Ted Cintula (1 copy) Oh Director, IE (10 copies) iy Director, RII (1 copy)

/ /

80112103Y7 g