ML20002A570
| ML20002A570 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/07/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20002A569 | List: |
| References | |
| 50-341-80-11, NUDOCS 8011200153 | |
| Download: ML20002A570 (1) | |
Text
-
c g
Appendix A NOTICE OF VIOLATION Detroit Edison Company Docket No. 50-341 Based on the results of the NRC inspection conducted on August 13, 1980, it appears that certain of your activities were in noncompliance with NRC requirements as noted below. This item is an inf raction.
10 CFR 50, Appendix B, Criterion XVI, states in part that, " Measures shall be established to assure that condit!ons adverse to quality.
. are promptly identified and corrected."
The Enrico Fermi Unit 2 Quality Assurance Manual, Section 17.0.1 states, in part that, " Written procedures shall be implemented to assure that appropriate and prompt ccrrective action is taken when conditions adverse to quality are identified."
Contrary to the above, control problem with design change documents had been identified, but prompt corrective action was not taken to assure that accurate and current documents were being used at controlled distribution locations.
3011200 l53
-