ML20002A456

From kanterella
Jump to navigation Jump to search
Notifies That Util Has Extended Reactor Outage to Apr 1973 Due to Decision to Design,Fabricate & Install New Control Rod Shroud Assemblies Rather than Repair Failed Shrouds Per 721122 Notification of Occurrence
ML20002A456
Person / Time
Site: Yankee Rowe
Issue date: 12/07/1972
From: Engelken R
US ATOMIC ENERGY COMMISSION (AEC)
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8011170241
Download: ML20002A456 (1)


Text

--

'W 0*

kE 4

E5 UNITED STATES

[

O +,,

.)ff ATOMIC ENERGY COMMISSION WASHINGTON, D.C. 20545

mn =

4,

' m= -

. (,(.

Nae December 7, 1972

=]

[jE9

..swl g;w D. J. Skovholt, Assistant Director for Operating Reactors, L c=5 i:.?

YANKEE ATOMIC ELECTRIC COMPANY.(YANKEE R0WE) - EXTENDED REACTOR F ~ir?

OUTAGE g g;;

Our Region I (Newark) Office was informed by Yankee management on December 4 that the Yankee-Rowe reactor facility will remain l-i shut down at least until April 1973. The licensee's decision 8

to design, fabricate and install new control rod shroud assemblies, rather than repair the failed shrouds, has resulted in the extended

==: -

outage.

Previous infermation -regarding this matter was reported in

~;

+,;.:

" Directorate.of Regulatory Operations Notification of an Incident or Occurrence", Blue Sheet Number 74, dated November 22, 1972.

p r~ ;.:p We will keep you informed of significant developments regarding 7.g this matter.

g l-t i

e.h.

.-. s

. :^

R. H. Engelken, Assistant Director for Inspection and Enforcement

='

Directorate of Regulatory Operations

=

cc:

E. J. Bloch, DDR F. E. Kruesi, RO T'T' O ' Te mj,

7 A. Giambusso,.L R. J. Schemel, L g:

J. G. Keppler, R0 A. Burger, L R. T. Carlson, RO:I PDR g

Local PDR 1

^

=::

u l

1I

- ~~ 7p; suih20

=

5 e

REOULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DIOTRIDUTION FOR INCOMING MATERIAL 50-029 REC-DII'ITZ I ORG: SOUCY A R DOCDATE: 05/08/78 NRC YAN!:EE ATOr1IC ELEC DATE RCVD: 06/19/78

!"Y'.TY c E :

'_E ! T!:I NOT ARIZED: NO COPIES RECEIVED c.! mJF.C7 -

LTR 1 ENCL 2 H tHUAPDI."? CERTIFIED COPY '.F ENDORSEMENT NO 2 TO MAELU BINDER NO XP 4.

PLANT NA!!E: YANt EE ROWE REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL: 4

++i'- DISTRIBUTIOrJ OF THIE f1ATERIAL IS AS FOLLOWS ******************

-r INSUR(J E F: INDEMNITY / ENDORSEMENT AGREEMENTS (DISTRIF:UTION CCDE MO.

7 INTERimL.

REG C 'T

..J E!!CL NRC PDR**W/ ENCL u1NITZ FOR ACTION **W/ ENCL H JORDAN **W/ ENCL..

E X TERNi'.L :

LPUR'S GREENFIELD, MA*+1W/ ENCL TIC **W/ ENCL

+

NSIC**W/ ENCL ACRS CAT B**W/O ENCL

!l'

.(

l 7

1 ci"O N 'T 10:1:

LTR 7

' ENCL 7 CONTROL tJBR:

78172001S

!?F 1r 9 3

- > n,,.;,,. p p,_ - v 4,p o p p e c e p c 7ge END

    • ++4-***t-**t-****+-e6**m***'***+<+--

r (7 g g' g6 @t m ' G M' ri IL,

,