ML20002A079

From kanterella
Jump to navigation Jump to search
Forwards Supplementary Info Re Cycle 2 Reload Application. Encl Withheld (Ref 10CFR2.790)
ML20002A079
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/16/1978
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7810180073
Download: ML20002A079 (48)


Text

O e

BALTI M O R E G AS AN D E LECTRIC CO M PANY GAS AN D ELECTRIC BUILDING B ALTl M O R E, M A RYLA N D 21203 October 16, 1978 ARTHU R E. LUN DVALL,JR.

vics Png 0gaef some Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comnission Washington, D. C.

20555 Attn:

Mr. Robert W. Reid, Chief Operatinc Reactors Branch #h Division of Operating Reactors

Subject:

Calvert Cliffs Nuclear Power Plant Unit No. 2, Docket No. 50-318 Supplementary Information on Second Cycle Reload Anolication

Reference:

BG&E letter dated 7/26/78 from Lundvall to Reid, Application for U2C2 Operation.

Gentlemen:

The enclosed information constitutes a supplement to the above referenced request for an amendment to allow operation of Calvert Cliffs Unit No. 2 for a second cycle. This information was previously discussed with your Staff verbally via telephone.

Included in this submittal are the following documents.

1.

Response to NRC questions on CEA Withdrawal Transient (Proprietary).

2.

Non-Proprietary version of item 1. above.

3 Proprietary Information Affidavit for item 1. above.

h.

Guide Tube Eddy Current Data Su= mary (Proprietary) as requested verbally by NRC.

5 Non-Proprietary version of item h. above.

6.

Proprietary Information Affidavit for item h. above.

Pursuant to 10 CFR 2.790 and as supported by the enclosed Affidavits, we request that the enclosed proprietary material be withheld from public disclosure.

Very truly yours, cc - J. A. Biddison, Esquire G. F. Trowbridge, Esquire Messrs. E. L. Conner, NRC P. W. Kruse, CE I C W CD D