Region III Fire Protection Utilities Group Meeting Dariusz Szwarc December 10, 2019 ADAMS Accession Number: ML19365A095
Topics
- Inspections
- Fire Protection Staff
- Triennial Findings
- Quarterly Report Findings
- New Inspection Procedure 2
Fire Protection Staff
- EB3 inspectors
- Alan Dahbur, Jasmine Gilliam, Jessie Hafeez, George Hausman, John Robbins, Atif Shaikh, Dariusz Szwarc
- DRS inspectors
- Jamie Benjamin, Matt Domke 3
2018 Inspections
- Palisades 2018011 & 2018415
- 1 FP finding
- 1 licensee-identified
- 1 URI
- B.5.b finding
- Perry 2018011
- 3 findings 4
2019 Inspections
- Byron 2019011
- Davis-Besse 2019012
- Prairie Island 2019012
- DC Cook 2019012
- Point Beach 2019012 (report not issued)
- Quad Cities 2019013 (report not issued) 5
2020 Inspections
- Monticello
- LaSalle
- Fermi
- Dresden
- Clinton 6
Recent Findings and Violations
- Triennial fire protection inspections
- 2018 2nd - four findings, one URI, one LIV
- 2019 - one finding
- Resident inspector reports (2019)
- One finding, two LIVs 7
Fire Protection System Functional Test Procedure
- Palisades 2018011
- Hydraulic and system flow calcs
- Assumed C-factor of 120 (new pipe)
- Pipe was not new
- Required discharge pressure should have been higher
- TS 5.4.1, Procedures
- Green NCV 8
Failure to Correctly Assess the Suppression System in the CSR in the PRA
- Palisades 2018011 and 2015008
- Certain PRA scenarios assumed suppression of fires and no propagation beyond ZOI
- Significant obstructions at ceiling
- Licensee-identified Green NCV 9
Monitoring Program
- Palisades 2018011 and 2018003
- Failure to set action levels to ensure that assumptions in analysis remain valid
- Revision of FAQ 10-0059
- The MR performance criteria for those SSCs promoted to or already considered high safety significant in the MR can be used as an acceptable action threshold.
- No violation 10
Vulnerability to Cause Secondary Fire due to Unfused Circuit
- Perry 2018011
- DG building ventilation fan
- Mod allowed local capability to start fan and bypass blown control fuse
- Could cause secondary fire
- Green NCV 11
Failure to Implement Fire Watch
- Perry 2018011
- ESW pump house
- Temporary cables routed near SSD cables w/o eval or transient permit
- Temporary oil pump
- Postulated fire could damage both SSD circuits
- Green NCV 12
Incorrect Height of Smoke Detectors
- Perry 2018011
- ESW pump house smoke detectors were at ceiling and 18 inches below
- Ceiling was approximately 62 feet
- Stratification concern
- Green NCV 13
FP Water System Flow Test Procedure Issue
- DC Cook 2019012
- TRS requires verification of fire suppression water system
- Procedure had no quantitative acceptance criteria
- Could not verify functionality (Sep 2016)
- Dec. 2016 calculation (9/16 test concern)
- 2019 flow test did not pass
- Green NCV 14
Quarterly Inspection Report Findings
- Quad Cities 2019002
- Inoperable detection system
- LaSalle 2019003
- Pre-Action system drainage issue
- Point Beach 2019003
- Potential of fire-induced circuit failures to inadvertently cross-tie energized buses 15
New Inspection Procedure 71111.21N.05
- Remains triennial
- Two-week - no info gathering trip
- No B.5.b
- Revised RFI letter
- FP as a program inspection 16
New Sample Requirements 17
Summary
- Inspections
- Triennial findings
- Quarterly report findings
- Inspection procedure changes 18
QUESTIONS?
19
Thank You