Letter Sequence Approval |
---|
EPID:L-2014-TOP-0003, Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 (Approved, Closed) |
|
MONTHYEARML19288A1282019-12-0303 December 2019 Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 OPTIMA3 Project stage: Draft Approval ML19364A0252020-02-13013 February 2020 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 Project stage: Approval ML19364A0052020-02-13013 February 2020 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 Project stage: Request ML19364A0232020-02-13013 February 2020 Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Revision 0, Reference Fuel Design SVEA-96 Optima3 Project stage: Approval ML19364A0242020-02-13013 February 2020 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 Project stage: Approval ML20161A0312020-06-11011 June 2020 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 Project stage: Other 2020-02-13
[Table View] |
|
---|
Category:Safety Evaluation
MONTHYEARML20191A2832020-07-21021 July 2020 Cover Letter - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20196L6332020-07-21021 July 2020 Non-Prop Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20196L6362020-07-21021 July 2020 Non Prop Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20132A3212020-05-12012 May 2020 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 ML20078J3752020-04-16016 April 2020 Final Safety Evaluation for Westinghouse Electric Company Request to Modify Safety Evaluation Report on WCAP-12472-P-A, Beacontm Core Monitoring and Operations Support System ML19364A0232020-02-13013 February 2020 Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Revision 0, Reference Fuel Design SVEA-96 Optima3 ML19364A0242020-02-13013 February 2020 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 ML19337A6172020-01-14014 January 2020 Attachment - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19337A5442020-01-14014 January 2020 Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19283A5402019-10-31031 October 2019 OEDO-19-00479 - Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation for WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR (Critical Power Ratio) Corr ML19190A2812019-08-0606 August 2019 Non-Prop Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies ML19190A2932019-08-0606 August 2019 Cover Letter Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies ML19134A1932019-07-31031 July 2019 Radics Final Nonproprietary SE and Transmittal Letter ML19098B0542019-05-0606 May 2019 Non-Prop Enclosure 1: Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19078A0432019-04-12012 April 2019 Attachment 1 - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Meas ML19078A0342019-04-12012 April 2019 Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement. ML19029A1052019-02-0707 February 2019 Safety Evaluation for Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 003 ML18156A0662018-06-15015 June 2018 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor and Ferret (Non-Proprietary) 2020-07-21
[Table view] |
Text
U. S. NUCLEAR REGULATORY COMMISSION RESOLUTION OF COMMENTS ON DRAFT SAFETY EVALUATION FOR TOPICAL REPORT WCAP-17769-P/NP, REVISION 0, REFERENCE FUEL DESIGN SVEA-96 OPTIMA3 WESTINGHOUSE ELECTRIC COMPANY By letter dated December 17, 2019 (Agencywide Documents Access and Management System Accession No. ML19352D854), Westinghouse Electric Company (Westinghouse) provided comments on the draft safety evaluation (SE) for Topical Report (TR) WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3. Westinghouse stated that there is proprietary information in the draft SE. The following is the U.S. Nuclear Regulatory Commission (NRC) staffs resolution of these comments:
Draft SE comments for TR WCAP-17769-P/NP, Revision 0:
- 1. Westinghouse provided proprietary markings on the draft SE.
NRC Resolution for Comment 1 on Draft SE:
The NRC staff reviewed the Westinghouse markings and incorporated them into the final SE except proprietary marking on page three.
Westinghouse confirmed via email dated January 2, 2020, that information marked as proprietary on page three lines 12 through 23 is not proprietary and indicated that approved version will not have this proprietary marking on the page 2-7 of Westinghouse TR.
- 2. Westinghouse provided editorial comments.
NRC Resolution for Comment 2 on Draft SE:
The NRC staff reviewed the Westinghouse comments and finds them acceptable because the changes are editorial in nature.
Attachment