ML19354E801

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re Testing of Cable Vault C02 Suppression Sys During 891031-1102,per NRC 890518 & 0821 Requests.Encl Final Test Rept Demonstrates That Carbon Dioxide Sys Will Satisfy Design Bases for Greater than 10 Minutes in Room
Date released: 01/03/2020 Download: ML19354E801


Test Procedure, Cable Vault Room Encl Integrity Test.
ML19354E807
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/15/1989
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
Download: ML19354E807 (214)
Alternate Testing for CO2 Full Discharge Test by Pressure Build & Tracer Gas Dilution Testing.
ML19354E804
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/16/1990
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
Download: ML19354E804 (12)
Room Integrity Testing of Vermont Yankee Cable Spreading Room, Final Rept
ML19354E802
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/16/1990
From: Reid B
RETROTEC ENERGY INNOVATIONS, LTD.
To:
References
Download: ML19354E802 (18)
Forwards Addl Info Re Testing of Cable Vault C02 Suppression Sys During 891031-1102,per NRC 890518 & 0821 Requests.Encl Final Test Rept Demonstrates That Carbon Dioxide Sys Will Satisfy Design Bases for Greater than 10 Minutes in Room
ML19354E800
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/16/1990
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML19354E800 (2)